JASC 5310

Service difficulty reports · 38,548

Reports filed under 5310 · Fuselage Main, Structure, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5310'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR FDEA2019121313224Crease Beam · corrodedMAIN DECK LT IB CREASE BEAM BETWEEN STA 900 - 1040 CORRODED. REMOVED CORROSION ON CREASE BEAM LT SIDE AT STA 900 TO STA 1040 IAW SRM 51-10-02-OG, ORIGINAL MAT .070",REM MAT .059", MAT LOSS .011", EVALUATED AREA FOUND TO BE OUT OF LIMITS IAW SRM 53-40-13-1A FIDec 11, 2019 · N990FD · Boeing 757232SDR DALA2019121627333Fitting · corroded(AIRCRAFT 5645, L/P 1398220) CORROSION ON FITTINGS 2 (E/AS) ON STA: 1140, BTW RBL 7 TO LBL 7 AT KEEL BEAM STRUCTURE. CORRECTIVE ACTION: REPAIRED PER. B757-200 S.R.M. 51-70-11-0G.Dec 11, 2019 · N545US · Boeing 757251SDR A6WA2019121147053Post · crackedBS 409+128 VERTICLE POST AT RBL 18 WAS CRACKED. AIRCRAFT REMOVED FROM SERVICE. REMOVED AND REPLACED THE VERTICLE POST IAW REO 601R-53-41-889.Dec 11, 2019 · N411ZW · Cndair CL6002B19SDR SWIA2020020348119Stop Fitting · chafed* PASSENGER DOOR CUT OUT €“ STOP FITTING (ABOVE FORWARD PULL IN CAM) CHAFED AT FS310 (MARKED). (C-CHECK) RO:1/29/2020REMOVED AND REPLACED PASSENGER DOOR CUT OUT €“ STOP FITTING (ABOVE FORWARD PULL IN CAM) AT FS310 REF CRJ 200 SRM ORDERED AND REVIVEDDec 10, 2019 · N487CA · Cndair CL6002B19SDR CALA2020020100268Door Frame · corrodedFWD WET AREA, R-1 DOORWAY OUTBOARD CHORD HAS CORROSION SEVERAL PLACES. REF TO PEMCO NR 2664N310 REMOVED AND EVALUATED CORROSION AT FWD WET AREA R-1 DPPRWAY OUTB OARD CHORD ORIG MAT 083" MAT LOSS 023", MAT RECEIVING .060" MAR MAT ALLOWABLE TO LOSS 10% FOUND TO Dec 10, 2019 · N24729 · Boeing 737724SDR SWIA2020012147884Fitting · cracked*FLIGHT DECK, L/H SIDE WINDSHIELD POST LOWER FITTING HAS SUSPECT CRACK (MARKED). (C-CHECK) RO:1/17/2020REMOVED,REPLACED AND INSTALLED NEW LOWER FITTING P/N 601R33235-3 ON L/H SIDE WINDSHIELD POST REF CRJ 200 SRM.Dec 10, 2019 · N455CA · Cndair CL6002B19SDR SWIA2020012147883Door Frame · chafed* THE AVIONICS DOOR SURROUND FUSELAGE SIDE BOTH FWD FITTINGS ARE CHAFFED. (MARKED). (C-CHECK) RO:1/17/2020REMOVED CHAFFE MARKS ON RH/LH FWD FITTING, COMPLIED WITH ALL STEPS OF REO REPAIR WAS A BLEND OUT ONLY, WEIGHT CHANGE IS NEGLIGIBLE. COMPLIED WITDec 10, 2019 · N455CA · Cndair CL6002B19SDR SWIA2020012147882Door Frame · corroded* THE SERVICE DOOR SURROUND FUSELAGE SIDE LOWER AFT FRAME STRAP HAS CORROSION. (C-CHECK) RO:1/17/2020REMOVED CORROSION ON THE SERVICE DOOR FUSELAGE SIDE LOWER AFT FRAME STRAP AT FS349.00 WITHIN LIMITS REF BOMBARDIER REO. ALL STEPS COMPLIED WITH COMPLIDec 10, 2019 · N455CA · Cndair CL6002B19SDR SWIA2020012147880Door Frame · corroded* THE PAX DOOR SURROUND FUSELAGE SIDE LOWER AFT HANDRAIL BRACKET/CLIP HAS CORROSION. (C-CHECK) RO:1/17/2020REMOVED CORROSION FROM THE PAX DOOR SURROUND FUSELAGE SIDE LOWER AFT HANDRAIL CUP BRACKET/CLIP, IAW BOMBARDIER CRJ200 SRM. THE PAX DOOR SURROUNDDec 10, 2019 · N455CA · Cndair CL6002B19SDR SWIA2020012147879Door Frame · corroded* THE PAX DOOR SURROUND FUSELAGE SIDE LOWER FWD HANDRAIL BRACKET/CLIP HAS CORROSION. (MARKED) (C-CHECK) RO:1/17/2020REMOVED CORROSION FROM PAX DOOR SURROUND FUSELAGE SIDE LOWER FWD HANDRAIL CUP BRACKET/CLIP, IAW BOMBARDIER CRJ200 SRM. THE PAX DOOR SUDec 10, 2019 · N455CA · Cndair CL6002B19SDR SWIA2020012147878Door Frame · chafed* THE PAX DOOR SURROUND FUSELAGE SIDE UPPER FWD FRAME STRAP IS CHAFFED. (C-CHECK) RO:1/17/2020REMOVED CHAFFING (GOUGE) FORM THE PAX DOOR SURROUND FUSELAGE SIDE UPPER FWD FRAME STRAP, IAW BOMBARDIER CRJ200 SRM AND SRM [TR51-44} SRM. THE PAX DOOR SURROUDec 10, 2019 · N455CA · Cndair CL6002B19SDR SWIA2020012147877Door Frame · corroded* THE PAX DOOR SURROUND FUSELAGE SIDE UPPER AFT FRAME STRAP HAS CORRSION. (C-CHECK) RO:1/17/2020REMOVED CORROSION FROM THE PAX DOOR SURROUND FUSELAGE SIDE UPPER AFT STRAP, IAW BOMBARDIER CRJ200 SRM. THE PAX DOOR SURROUND UPPER AFT SURROUND DOUBLER IS Dec 10, 2019 · N455CA · Cndair CL6002B19SDR SWIA2020012147876Door Frame · corroded* THE PAX DOOR SURROUND FUSELAGE SIDE LOWER AFT FRAME STRAP HAS CORROSION. (C-CHECK) RO:1/17/2020REMOVED CORROSION FROM THE PAX DOOR SURROUND FUSELAGE SIDE LOWER AFT FRAME STRAP, IAW BOMBARDIER CRJ200 SRM 51-21-06. REF. CRJ200 SRM. THE ORIGINAL MATERIDec 10, 2019 · N455CA · Cndair CL6002B19SDR SWIA2020012147875Door Frame · corroded* THE PAX DOOR SURROUND FUSELAGE SIDE LOWER FWD FRAME STRAP HAS CORROSION. (C-CHECK) RO:1/17/2020REMOVED CORROSION FROM THE PAX DOOR SURROUND FUSELAGE SIDE LOWER FWD FRAME STRAP, IAW BOMBARDIER CRJ SRM. THE PAX DOOR SURROUND LOWER FWD FRAME STRAP IS IDec 10, 2019 · N455CA · Cndair CL6002B19SDR SWAA2019122439918Crease Beam · corrodedL/H INNER CREASE BEAM CORRODED BETWEEN BS. 312 TO BS. 348.2. / R&R CREASE BEAM PER SRM AND DWG.Dec 10, 2019 · N452WN · Boeing 7377H4SDR VNAA2019121099902Angle · corrodedFS280 FWD J ANGLE IS CORRODED. UPON FURTHER INVESTIGATION, FOUND FS280 FWD J-ANGLE TO BE CORODED BEYOND LIMITS IAW CRJ700 SRM SB 00-00-101-001-A01 REQUIRES REPLACEMENT. REMOVED CORRODED J-ANGLE IAW CRJ700 SRM 51-42-00-001-001-A01, 51-42-13-001-001-A01, 51-42Dec 10, 2019 · N526EA · Cndair CL6002C10SDR SWAA2022041161684Channel · crackedFED MOPSILL INNER CHORD CRACKED AT BS 303 LBL55 WL 209 / REMOVED CRACKED FED MOPSILL. LOCATED; DRILLED AND INSTALLED NEW FED MOPSILL INNER CHORD IAW SRM 51-40-02; SRM 51-40-05 DWG 141A8110; DWG 140A9810Dec 9, 2019 · N919WN · Boeing 7377H4SDR SWAA2022041161685Floor Support · crackedFLOOR SUPPORT CRACKED AT BS 312-328 RBL 31 WL208 / REMOVED LOCATED AND DRILLED OK TO INSTALL FLOOR SUPPORT BS 312 - 328 RBL 31 WL 208 I.A.W BOEING DWG 141A5400 AND SRM 51-40-02-0G-0. 80512R 18DEC19 INSP 357 12/18/19 INSTALLED FLOOR SUPPORT BS 312 - BS 328 RBL Dec 9, 2019 · N919WN · Boeing 7377H4SDR SWAA2022041161687Channel · corrodedCORROSION ON FSD MOPSILL INNER CHORD AT BS 328 RBL 56 WL 208 / REMOVED AND REPLACED FSD MOPSILL I.A.W BOEING DWG 141A8310; 141A0631 AND SRM 51-40-02-0G-0.Dec 9, 2019 · N919WN · Boeing 7377H4SDR C77A2020022980001Beam · corrodedDURING BASIC CHECK IN SAT, INSPECTION DISCOVERED CORROSION DAMAGE ON THE AFT PASSENGER DOOR THRESHOLD BEAM, P/N 170-65703-003. REFERENCE ETD2016-170-005435 FIGURES 1, 2, AND 3 FOR DAMAGE LOCATION AND DIMENSIONS. VT REQUESTED AND RECEIVED A PERMANENT REPAIR IN Dec 9, 2019 · N621CZ · Emb ERJ170200LRSDR SWIA2020020348094Door Frame · corrodedPASSENGER DOOR CUT-OUT HAS CORROSION AT LOWER AFT CORNER BY DRAIN HOLE (C-CHECK) RO 1/28/2020 REPAIRED LOWER AFT CORNER OF PASSENGER DOOR CUT-OUT IAW BOMBA REO.Dec 9, 2019 · N900EV · Cndair CL6002B19SDR SWIA2020020348093Not Reported · corrodedRBL27 HAS CORROSION BETWEEN FS589.0 TO FS621.0 (C-CHECK) RO 1/28/2020 EVALUATED AND FOUND TO BE OUT OF LIMITS IAW REO. WORK TO BE ACCOMPLISHED ON CP 20065025, AAR NON-ROUTINE 1018024/1000/0120 S/N: 7507206Dec 9, 2019 · N900EV · Cndair CL6002B19SDR SWIA2020020348091Not Reported · corrodedRBL27 HAS CORROSION BETWEEN FS559.0+80 TO FS559.0+112 (C-CHECK) RO 1/28/2020 EVALUATED AND FOUND TO BE OUT OF LIMITS IAW REO. WORK TO BE ACCOMPLISHED ON CP 20064968, AAR NON-ROUTINE 1018024/1000/0118 S/N: 7507204Dec 9, 2019 · N900EV · Cndair CL6002B19SDR R61A202001080021Beam · corrodedWHILE IN HEAVY CHECK FOUND CORROSION-FWD CARGO DOOR CUT OUT LOWER BEAM CORRODED AS MARKED REMOVED AND REPLACED FWD CARGO LOWER BEAM REF EMB 175 SRM 51-40-08Dec 9, 2019 · N227JQ · Emb ERJ170200LRSDR R61A201912181407Doubler · corrodedWHILE IN HEAVY CHECK FOUND L/H FLOOR DOUBLER CORRODED AT FR. 19 AS MARKED REPLACED LH FLOOR DOUBLER PER SRM 51-40-08. APPLIED TOP COAT TO FASTENERS REF SRM 51-23-06Dec 9, 2019 · N227JQ · Emb ERJ170200LRSDR AALA2019121209007Fitting · wornAIRCRAFT IN BASE MAINTENANCE: LEFT HAND OVER WING EXIT DOOR CUT OUT LOWER FORWARD AND AFT FITTINGS WORN. REPLACED FITTINGS PER AMM 52-21-00-820-801-A,Dec 9, 2019 · N951UW · Emb ERJ190100IGWSDR DALA2019120907160Door Frame · corrodedC-2 DOOR CUT-OUT JAMB AREAS HAVE LIGHT CORROSION ON PAN, SEAL DEPRESSORS, AND AROUND FASTENERS. AREAS MARKED. NRC 001-0306: 5231-2002/001 00169: REPLACED PAN SECTION REF B717 SRM 53-20-15-2R PROCED 7. (LP #1392441)Dec 8, 2019 · N998AT · Boeing 717200SDR COEA2020020677811Failsafe · corrodedWO 209669 NR 100021 HEAVY CHECK COE/MAJOR REPAIR: FRAME 23A FAIL SAFE HAS LEVEL 2 CORROSION ABOVE STRINGER 21L. CORRECTIVE ACTION: REPAIRED PER SRM 530000-300-817-A01.Dec 7, 2019 · N811HC · Aerosp ATR72201SDR COEA2020011604811Crease Beam · corrodedHEAVY CHECK COE/MAJOR REPAIR: RT CREASE BEAM WEB BETWEEN FRAMES 22-23 UPPER SURFACE HAS LEVEL 2 CORROSION. CORRECTIVE ACTION: REPLACED WITH FABRICATION.Dec 7, 2019 · N811HC · Aerosp ATR72201SDR RAIA2019122470013Door Frame · corrodedAFT CARGO DOOR CUT OUT LOWER AFT CORNER PANEL AT FR 68 AT LOWER AFT CORNER HAS CORROSION AROUND FASTNER HOLE....R&R CARGO DOOR LOWER AFT CORNER PANEL.Dec 7, 2019 · N11113 · Emb EMB145XRSDR SWAA2019121939838Pressure Deck · crackedHORIZONTAL PRESSURE DECK WEB CRACKED BETWEEN BS. 663 TO BS. 675, BETWEEN RBL 38 TO RBL 60. / REPAIRED WEB PER SRM.Dec 7, 2019 · N452WN · Boeing 7377H4SDR DALA2019121097213Window Post · crackedDURING HFEC INSPECTION OF R/H FLIGHT DECK WINDOW ALI FOUND EVIDENCE OF A CRACK ON LOWER ATTACHMENT SIDE POST, REPAIR PER ERA 583733-14AD REV ODec 7, 2019 · N372NW · Airbus A320212SDR SWIA2019123147507Vertical Beam · crackedFS 409+128 VERTICAL POST INBD HALF IS CRACKED AT RBL 27, AT THE LOWER FLANGE. (C-CHECK) RO 12/27/2019 REMOVED CRACKED POST AND INSTALLED NEW INB`D HALF POST PN 601R-32208-34 AT RBL 27 AND FS 409+128 REF BOMBARDIER REO, BOMBARDIER, CRJ200 SRM. COMPLIED WITH SDec 6, 2019 · N929SW · Cndair CL6002B19SDR SWIA2019122747325Buttstrap · corrodedBUTTSTRAP AT FS 333 IS CORRODED IN SEVERAL LOCATIONS BETWEEN STRINGER 24L AND 24R COMPLIED WITH MAJOR REPAIR OF BUTTSTRAP AT F.S. 333 IAW REO AND SKYWEST TASK CARD MAJOR REPAIR FORM 337 ATTACHED. 1.2 LBS REMOVED 1.8 LBS ADDED FOR A + .7 LBS ADDEDDec 6, 2019 · N879AS · Cndair CL6002B19SDR SWIA2019122647127Structure · chafedFS621 LBL9.50 CHAFE AREA REQUIRES REPAIR PER REO (C-CHECK) RO 12/23/2019 PERFORMED REPAIR TO FS621 LBL9.50 CHAFE AREA REF REO. CHECKS GOODDec 6, 2019 · N934SW · Cndair CL6002B19SDR SWAA2019121239568Crease Beam · corrodedAFT WET AREA FLOOR STRUCTURE R2 DOOR ENTRY CREASE BEAM CORRODED ACROSS LENGTH OF THE DOORWAY BETWEEN BS. 964 TO BS. 986.5, RBL 53. / R&R CREASE BEAM IAW SRM AND DWG.Dec 6, 2019 · N8306H · Boeing 7378H4SDR DALA2019120977178Deck Plate · corroded(AIRCRAFT 6813, L/P 1389941) CORROSION OUT OF LIMITS WAS FOUND ON DECK PLATE AT STA 1681.8, LBL 25. CORRECTIVE ACTION: REPAIRED PER B757-200 SRM 53-60-51 REPAIR 2 FIGURE 201 ALTERNATIVE I.Dec 6, 2019 · N727TW · Boeing 757231SDR C77A202002290039Beam · corrodedDURING THE LAST BASIC CHECK IN SAT, INSPECTION DISCOVERED CORROSION ON THE AFT CABIN RH AFT BEAM P/N 170-65669-004 UPPER SURFACE ON THE SUBJECT FLOOR BEAM. THE DAMAGE DIMENSIONS ARE REPORTED AS FOLLOWS: 1.0-INCH X .90 INCH TO A MAXIMUM DEPTH OF .023-INCH-DEEP Dec 5, 2019 · N621CZ · Emb ERJ170200LRSDR C77A202002290038Beam · corrodedDURING BASIC CHECK IN SAT, INSPECTION DISCOVERED CORROSION ON THE AFT CABIN LH AFT BEAM P/N 170-65669-003 UPPER SURFACE ON THE SUBJECT FLOOR BEAM. THE DAMAGE DIMENSIONS ARE REPORTED AS FOLLOWS: 1.3 INCH X .90 INCH TO A MAXIMUM DEPTH OF .020 INCH DEEP AND 1.3 IDec 5, 2019 · N621CZ · Emb ERJ170200LRSDR SWIA2020021848636Crossbeam · corroded* THE CROSS BEAM CLIP AT LBL9.00 AT FS333.00 HAS CORROSION. (C-CHECK) RO 2/14/2020 REMOVED CORROSION FROM THE CROSS BEAM CLIP AT LBL9 AND FS333,00 REMAINING MATERIAL I OUT OF ALLOWABLE DAMAGE LIMITS. CROSS BEAM CLIP AT LBL9.00 AND FS333.00 REPLACED. REF: Dec 5, 2019 · N689CA · Cndair CL6002D24SDR SWIA2020021848545Crossbeam · corroded* THE CROSS BEAM FROM RBL27.00 TO RH FLOOR SILL AT FS1051.30 HAS CORROSION. (C-CHECK) RO 2/14/2020 BLENDED CORROSION ON FLOOR CROS BEAM FROM RH FLOOR SILL TO RBL 27.00 AT FS 1051.30 AND FOUND TO BO OUT OF LIMITS. REPAIRED AREA BY COMPLYING WITH ALL STEPS Dec 5, 2019 · N689CA · Cndair CL6002D24SDR SWIA2020021848543Crossbeam · corroded* THE CROSSBEAM AT FS1051.30 FROM LH FLOOR SILL TO LBL27.00 HAS CORROSION. (C-CHECK) RO 2/14/2020 BLENDED CORROSION ON FLOOR CROS BEAM FROM LH FLOOR SILL TO LBL 27.00 AT FS 1051.30 AND FOUND TO BO OUT OF LIMITS. REPAIRED AREA BY COMPLYING WITH ALL STEPS ODec 5, 2019 · N689CA · Cndair CL6002D24SDR SWIA2020021848542Crossbeam · corroded* THE CROSS BEAM AT FS1000.00 FROM LH FLOOR SILL TO LBL27.00 HAS CORROSION. (C-CHECK) RO 2/14/2020 REPAIRED FS1000.00 CROSS BEAM FROM LH FLOOR SILL TO LBL 27.00 AND REPLACED SUPPORT ANGLE REF BOMBARDIER REO ALL STEP COMPLETED, AND BOMBARDIER DRAWING, AND Dec 5, 2019 · N689CA · Cndair CL6002D24SDR SWIA2020021848538Crossbeam · corroded* THE CROSS MEMBER BETWEEN RBL9.00 AND RBL27.00 AT FS333.00 HAS CORROSION. (C-CHECK) RO 2/14/2020 BLENDED CROSS MEMBER BETWEEN RBL9.00 AND RBL27.00 AT FS333.00 REF CRJ900 SRM. OUT OF LIMITS REF CRJ900 SRM. REPAIRED CROSS BEAM AT FS333 BETWEEN RBL9-RBL27 RDec 5, 2019 · N689CA · Cndair CL6002D24SDR SWIA2019123147506Vertical Beam · crackedSUSPECTED CRACK ON FS409+128 I/B VERTICAL POST @ LBL27 LOWEST RIVET NEAR THE RADIUS. (C-CHECK) RO 12/27/2019 REMOVED CRACKED AND INSTALLED NEW INB`D POST AT LBL 27 AND FS 409+128 REF BOMBARDIER REO, BOMBARDIER DWG, CRJ200 SRM. SEE CONTINUATION CARD FOR DETAIDec 5, 2019 · N929SW · Cndair CL6002B19SDR FDEA2019120653187Beam · corrodedTRANSVERSE BEAM B/S 900 RBL 45 IS CORRODED BEYOND PERMITTED LIMITS IAW SRM 53-00-51-1A, ALLOWABLE DAMAGE 1, DETAIL III REPLACED TRANSVERSE BEAM IAW SRM 51-40-02 AND BOEING DRAWING #111N5201Dec 5, 2019 · N920FD · Boeing 75723ASDR SWIA2019120546821Pressure Deck · crackedPRESSURE FLOOR SKIN CRACKED AT LBL 9.00 BETWEEN FS449.85 AND FS473.15. (C-CHECK) RO 12/3/2019 ACCOMPLISHED REPAIR TO PRESSURE DECK AT LBL 9 AT FS449.85 AND FS473.15 IAW REO. REF CAMP #19682965 FOR ADDITIONAL WORK PERFORMED AND ALSO FOR CRACK, TRIM AND NDTDec 5, 2019 · N459SW · Cndair CL6002B19SDR SWIA2019120546820Pressure Deck · crackedPRESSURE FLOOR SKIN CRACK AT LBL 9.00 AFT OF 1ST CRACK, BETWEEN FS 449.85 AND FS473.15. ALSO SEE CAMP #19674937 . (C-CHECK) RO 12/3/2019 ACCOMPLISHED REPAIR IAW REO STRUCTURAL MAJOR REPAIR AND SRM -- ALSO REF TO CAMP #19674937 FOR WORKED PERFORMED.Dec 5, 2019 · N459SW · Cndair CL6002B19SDR SWIA2020021848527Door Frame · corrodedPAX DOOR FORMER F/S329.41 BETWEEN DD4 AND DD5 HAS CORROSION. (C-CHECK) RO 2/14/2020 PAX DOOR FORMER FS329.41 BETWEEN DD4 AND DD5 OUT OF LIMITS. REPLACED FORMER REF CRJ900 SRM AND CRJ900 SRM AND BOMBARDIER DRAWING. PRESSURE CHECK NOT REQUIRED DUE TO PASSENGDec 4, 2019 · N689CA · Cndair CL6002D24SDR SWIA2020021848526Door Frame · corrodedPAX DOOR AFT FORMER HAS EXFOLIATED CORROSION AT MULTIPLE LOCATION (C-CHECK) RO 2/14/2020 PAX DOOR AFT FORMER IS OUT OF LIMITS. REPLACED FORMER REF CRJ900 SRM, AND BOMBARDIER DRAWING. PRESSURE CHECK NOT REQUIRED DUE TO PASSENGER DOOR REPLACED ON CAMP#2040Dec 4, 2019 · N689CA · Cndair CL6002D24
Back to JASC 5310