JASC 5310

Service difficulty reports · 38,573

Reports filed under 5310 · Fuselage Main, Structure, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5310'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR FDEA201004231340Web · crackedLT STAIRWELL BS 1236 VERT TORQUE BOX WEB IS CRACKED AT FASTENER. CUT OUT DAMAGED AREA .7500" X 1.2500" AT BS 1236 VERT TORQUE BOX WEB IAW SRM, REV 102, 51-10-1. FABRICATED .7500" X 1.2500" FILLER USING 7075 T-6, .025" IAW SRM 51- 40-2 FIG 1. FABRICATED REPApr 23, 2010 · N483FE · Boeing 727227SDR FDEA201004231339Web · crackedLT LOWER STAIR WELL TORQUE BOX BS 1228 HAS LIGHTENING HOLE CRACK. ROUTED OUT DAMAGED AREA .1875" X .5" IAW SRM, REV 102, 51-10-1. FABRICATED DOUBLER FROM MATERIAL 7075 T-6, .032" X 1" X 4" IAW SRM 53-10-2 FIG 6 AND 51-40-2 FIG 1. INSTALLED REPAIR DOUBLERApr 23, 2010 · N483FE · Boeing 727227SDR FDEA201004231326Skin · damagedUPON REMOVAL OF RAIN GUTTER FASTENERS ABOVE L-1 DOOR, FOUND DOUBLE DRILLED HOLE THROUGH HUCKBOLT AT BS 328. ACCOMPLISHED EA 7-5330-135539 DATED 05/18/10.Apr 23, 2010 · N483FE · Boeing 727227SDR USAA2010042390818Doubler · crackedCLT - C2 - MAJOR REPAIR - CRACK ON FRAME REPAIR DOUBLER AT MAIN ENTRY DOOR LOWER FORWARD DOOR STOP FITTING CUTOUT AT BS 303.9, S16L. REPAIRED FRAME AT MAIN ENTRY DOOR LOWER FORWARD DOOR STOP FITTING CUTOUT AT BS 303.9, S16L IAW B737 SRM 51-40-02 & BOEING DRAWApr 23, 2010 · N430US · Boeing 7374B7SDR FDEA201004231314Door Frame · damagedFWD CARGO DOOR JAMB-UPON REMOVAL OF AFT LOWER DOOR JAMB SEAL RETAINER, RIVET HOLES ON WEB STRUCTURE FOUND ELONGATED. REPAIR CARRIED OUT IAW EA NR 8-5310-137983, REPAIR CLASSIFIED AS MAJOR IAW GMM 6-2-100 REV 110.Apr 23, 2010 · N367FE · Doug MD1010FSDR FDEA201004231312Beam · crackedCRACK INDICATION FOUND ON 2ND LAYER WEB FROM TOP DURING HFEC OPEN HOLE INSP ON 0.520" HOLE AT MAIN CARGO DOOR NR 7 LOWER JAMB FITTING AT HOLES B AND D. REPAIR CARRIED OUT IAW EA 8-5310-137972: REPAIR CLASSIFIED AS MAJOR IAW GMM 6-2-100, REV 110.Apr 23, 2010 · N367FE · Doug MD1010FSDR FDEA201004231309Beam · crackedCRACK INDICATION FOUND ON 1ST LAYER WEB FROM TOP DURING HFEC OPEN HOLE INSP ON 0.520" HOLE AT MAIN CARGO DOOR NR 6 LOWER JAMB FITTING AT HOLES C. REPAIR CARRIED OUT IAW EA 8-5310-137972: FUSELAGE - MAINFRAME - MCD LOWER JAMB REPAIR TO BORE HOLES COMMON TOApr 23, 2010 · N367FE · Doug MD1010FSDR IPXA10559606Structure · corrodedINSPECTION TYPE:C1, WHILE ACCESSING THE FWD SHEAR WEB: FOUND ADDITIONAL CORROSION AND GOUGE DAMAGE COMMON TO THE INNER CHORD AT LBL 62, WL 208 FROM BS 297 TO BS 324. R & R ALUMINUM EXTRUSION IAW SRM 51-40-02-0G, AMM 51-00-58-2 5B.Apr 22, 2010 · N436UP · Boeing 75724APFSDR IPXA10659516Shim · unknownINSPECTION TYPE:C FUS REMOVE FASTENERS / PARTS IDENTIFIED IN EO B767-5350-17922-E APP C, FIG 6 AS NECESSARY TO INSTALL A PROTECTIVE SHIM FASTENER / PARTS. REMOVED AND REINSTALLED IAW EO B767-5350-17922-E APPENDIX C FIG 6 IN ORDER TO INSTALL A PROTECTIVE SHIM Apr 22, 2010 · N302UP · Boeing 76734AFSDR ASOA201000622Post · crackedFOUND FS 409.0+128 VERTICAL POST RBL 18.0 INBD AND OTBD SIDES HAVE INDICATIONS NOTED APPROX .2" IN LENGTH 50 PERCENT FSH AT WL 69.0 AFT FLANGE RADIUS. FAILED NDT INSP. REMOVED INBD AND OTBD VERTICAL POSTS AT RBL 18 FS 409+128, LOCATED AND DRILLED OTBD POST IApr 22, 2010 · N859AS · Cndair CL6002B19SDR ASOA201000621Post · crackedFOUND FS 409.0+128 VERTICAL POST LBL 18.0 OTBD SIDE HAS A INDICATION NOTED APPROX .2" IN LENGTH 90 PERCENT FSH AT WL 69.0 AFT FLANGE RADIUS. FAILED NDT INSP. REMOVED INBD AND OTBD VERTICAL POSTS AT LBL 18 FS 409+128 IAW SRM 51-42-06. LOCATED AND DRILLED OTApr 22, 2010 · N859AS · Cndair CL6002B19SDR IPXA10559579Structure · corrodedINSPECTION TYPE:C2, THE UPPER CHORD OF THE WEB IS CORRODED BS 307.5 LBL 51 WL 208. REPLACED CHORD IAW SRM 51-10-02-0G, SRM 53-00-51-1A1, SRM 51-40-02-0G.Apr 21, 2010 · N427UP · Boeing 75724APFSDR FDEA201004211272Structure · crackedFWD LWR INTERIOR NOSE COMPARTMENT - "DOG HOUSE" - RT LWR NOSE CHORD LEVEL COMPOUND IS CRACKED AND SEPARATING BS 294.5 -360 BILGE. R & R NEW CHORD NOSE RT PN 65-19861-8 IAW SRM 51-30-2.Apr 21, 2010 · N483FE · Boeing 727227SDR FDEA201004211271Structure · crackedFWD LWR INTERIOR NOSE COMPARTMENT - "DOG HOUSE", LT LWR NOSE CHORD LEVEL COMPOUND IS CRACKED AND SEPARATING BS 294.5 TO 340 BILGE. R & R NEW CHORD NOSE LT PN 5715216 IAW SRM 51-30-2.Apr 21, 2010 · N483FE · Boeing 727227SDR FDEA201004211270Door Frame · crackedNR 1 CARGO DOORWAY FRAME, BS 620, STR 23R, WEB CRACKED. REMOVED BS 620 WEB FROM STRINGER 15 - 28 RT IAW DWG 65-56101. FABRICATED NEW BS 620 WEB FROM STRINGER 15 -28 RT USING 7075 - T6, .071", DIMENSIONS 139.35" X 26" IAW DWG 65-56101 REV F. INSTALLED NEW BSApr 21, 2010 · N483FE · Boeing 727227SDR AALA20100419TUL10Window Frame · crackedWINDOW FRAME CRACKED RIGHT 37. INSTALLED DOUBLER PER AARD 53-10-00-25.Apr 19, 2010 · N7539A · Doug DC982SDR AALA20100419TUL09Window Frame · crackedWINDOW FRAME CRACKED RIGHT 39. INSTALLED DOUBLER PER AARD 53-10-00-52.Apr 19, 2010 · N7539A · Doug DC982SDR AALA20100419TUL05Window Frame · crackedCABIN WINDOW FRAME CRACKED LOWER FORWARD CORNER. INSTALLED DOUBLER PER AARD 53-10-00-25.Apr 19, 2010 · N7539A · Doug DC982SDR SWAA102209Crease Beam · corrodedDURING SCHEDULED 12Y CHECK, FOUND RT CREASE BEAM CORRODED AT BS 951 TO BS 995. REPAIRED BEAM PER SRM & EA.Apr 17, 2010 · N712SW · Boeing 7377H4SDR AALA20100416TUL11Pan · crackedWINDOW PAN CRACKED AT UPPER FORWARD CORNER OF NUMBER R32 WINDOW. INSTALLED REPAIR ANGLE PER AARD 53-10-00-25.Apr 16, 2010 · N7539A · Doug DC982SDR HALA201004170162Structure · corrodedCORROSION FOUND ON RETRACTABLE STOP BONDING STUD AT STA 536, LBL12 FLOOR LEVEL IN FWD CARGO. FABRICATED NEW PANEL IAW DWG 451T2603.Apr 16, 2010 · N583HA · Boeing 76733ASDR DALA108049867Door Frame · corrodedDURING H-CHECK FOUND CORROSION ON UPPER DOOR JAMB WEB AT BS1060-BS1067 L24R-L26R. REPAIRED IAW SRM 51-70-04 FIGURE 2.Apr 16, 2010 · N776NC · Doug DC951SDR DALA108019867Door Frame · crackedDURING H-CHECK FOUND CRACK IN DOOR JAMB WEB AT BS 1112 L26R. REPAIRED IAW SRM 53-13-3, 53-30-2, 51-30-05.Apr 16, 2010 · N776NC · Doug DC951SDR V0XR201004160002AGusset · corrodedCTR GUSSET FR 59-61 IS CORRODED BEYOND LIMITS. R & R CTR GUSSET. W/C 1154. (V0XR)Apr 16, 2010 · N881EA · Dhav DHC8106SDR AALA20100415TUL01Door Frame · damagedWEB STRAP ON DOOR CUTOUT BEAM WEB STATION 1174 IS CORRODED. INSTALLED NEW WEB STRAP ON DOOR CUTOUT BEAM WEB STATION 1174 LONGERON 29 RIGHT TO LONGERON 28 RIGHT PER SRM 51-30-00.Apr 15, 2010 · N7542A · Doug DC982SDR IPXA10659519Failsafe · crackedINSP TYPE:C FUS RT BS 955 BULKHEAD FITTING AREA CRACK AT FAIL SAFE STRAP APPROX .2500" & .3750" IN LENGTH. REFER NRC 50422 FOR DETAIL, FUSELAGE RT BS 955 REAR SPAR BULKHEAD FITTING AREA FAIL SAFE STRAP REPAIRED IAW EO B767-5350-17922-E, APPENDIX D.Apr 15, 2010 · N302UP · Boeing 76734AFSDR GLBA20100416JDoor Frame · crackedMAJOR REPAIR - THE AIRSTAIR DOOR FRAME AT FUSELAGE FRAME AT FS 150 BETWEEN STRINGERS 10L & 11L WAS FOUND CRACKED. CRACK APPROX .15" IN LENGTH. MX REPAIRED THE AFFECTED AREA AND PERFORMED ALL REQUIRED RII INSPECTIONS IAW EO 10-1900-53-015 STEPS 5-8. MATERIALSApr 15, 2010 · N122UX · Beech 1900DSDR GLBA20100416HDoor Frame · crackedMAJOR REPAIR - THE FUSELAGE FRAME AT F.S. 177 AT STRINGER 11L WAS FOUND CRACKED IN THE BEND RADIUS. CRACK LENGTH APPROX .2" IN LENGTH. MX REPAIRED THE AFFECTED AREA AND PERFORMED ALL REQUIRED RII INSPECTIONS IAW EO 10-1900-53-015 STEPS 1-4. MATERIALS UTILIZEDApr 15, 2010 · N122UX · Beech 1900DSDR GLBA20100416FDoor Frame · bentMAJOR REPAIR - THE FUSELAGE FRAME AT F.S. 177 BETWEEN STRINGERS 10L & 11L WERE FOUND BENT AND DENTED ON THE SURFACE INSIDE THE AIRSTAIR DOOR CUTOUT AT THE LOWER AFT CORNER AREA. MX REPAIRED THE AFFECTED AREA AND PERFORMED ALL REQUIRED RII INSP IAW EO 10-1900-Apr 15, 2010 · N122UX · Beech 1900DSDR DALA107789867Door Frame · corrodedDURING "H" CHECK FOUND LOWER DOOR JAMB PAN CORRODED IN AFT CARGO COMPARTMENT. BS1060-BS116 L29R TO L26R. REPAIRED IAW SRM 53-13-3, 53-05-44.Apr 15, 2010 · N776NC · Doug DC951SDR IPXA10659515Failsafe · crackedINSPECTION TYPE:C FUS LT B S955 BULKHEAD FITTING FAIL SAFE STRAP CRACK FOUND AT FWD SIDE THRU THICKNESS AT 9 O/C POSN AFT SDE CRACK AT 5 O/C POSITION (LOCKING INBD) APPROX 0.040" REF NRC 50425 FOR DETAIL. FUSELAGE LT BS955 REAR SPAR BULKHEAD FITTING AREA FAIL Apr 14, 2010 · N302UP · Boeing 76734AFSDR QXEA2010041500267Fitting · corrodedC-CHECK FOUND CORROSION ON FWD JACK FITTING BETWEEN FS 265-FS280 AND STRINGER 26L AND 26R. BLENDED CORROSION IAW SRM 51-21-06-001-001-A01. BLENDED CORROSION BETWEEN FS265-FS280 ON FWD JACK FITTING IAW SRM 51-21-06-001-001-A01. BLENDED CORRODION BETWEEN FS 2Apr 14, 2010 · N614QX · Cndair CL6002C10SDR GLBA20100415FDoor Frame · crackedMAJOR REPAIR - UPON A POST FLIGHT CHECK IT WAS DISCOVERED THAT A SMALL DENT AND A CRACK WAS PRESENT AT THE LOWER AFT CORNER OF THE FUSELAGE AIRSTAIR DOOR FRAME. DENT APPROX .125" DEEP AND THE CRACK IS APPROX 1" IN LENGTH WITHIN THE DENT. MX REPAIRED THE AFFECApr 14, 2010 · N122UX · Beech 1900DSDR V0XR201004140003Seat Track · corrodedRT UPPER SEAT TRACK SUPPORT FR 48-52 IS CORRODED BEYOND LIMITS. R & R RT SEAT TRACK. W/C 2215.Apr 14, 2010 · N834HK · Emb EMB145LRSDR USAA2010051990993Crease Beam · corrodedCLT - C2 - MAJOR REPAIR - CORROSION ON LEFT CREASE BEAM INNER CHORD BETWEEN BS 670 & BS 686, S17L. REPLACED LEFT CREASE BEAM INNER CHORD BETWEEN BS 670 & BS 755, S17L IAW B757 SRM 51-10-02 & BOEING DRAWING 143N8322.Apr 13, 2010 · N941UW · Boeing 7572B7SDR IPXA10559703Structure · corrodedINSPECTION TYPE:C1, APU INLET DOOR CUTOUT AFT STRIP SHOW SIGNS OF CORROSION. REPAIR IAW EO B757-5330-37696-A.Apr 13, 2010 · N436UP · Boeing 75724APFSDR ASOA201000558Post · crackedFOUND FS 409.0+128 VERTICAL POST LBL 18.0 OTBD SIDE HAS INDICATION NOTED APPROX .2" IN LENGTH 60 PERCENT FSH AT WL 69 AFT FLANGE RADIUS. FAILED NDT INSPECTION. REMOVED INBD AND OTBD POST IAW SRM 51-42-06. LOCATED & DRILLED NEW VERTICAL POST IAW SRM 51-40-11. Apr 13, 2010 · N842AS · Cndair CL6002B19SDR ASOA201000557Post · crackedFOUND FS 409.0+128 VERTICAL POST RBL 18.0 INBD AND OTBD SIDE HAVE INDICATIONS NOTED APPROX .2" IN LENGTH 60 PERCENT AND 50 PERCENT FSH AT WL 69.0 AFT FLANGE RADIUS. FAILED NDT INSPECTION. REMOVED VERTICAL POST. LCOATED, DRILLED & JOINED POST IAW SRM 51-42-06.Apr 13, 2010 · N842AS · Cndair CL6002B19SDR ASOA201000556Post · crackedINBD SIDE OF VERTICAL POST RBL 27 ON 409.00+128 BULKHEAD IS CRACKED AT BOTTOM RIVET APPROX .250 LONG. COMPLIED WITH EC/TC REO 601R-53-41-056 IAW REO 601R-53-41-056 REV E.Apr 13, 2010 · N842AS · Cndair CL6002B19SDR V0XR201004130004Sill · corrodedRT SILL AT FR 53-59 IS CORRODED BEYOND LIMITS. R & R RT SILL. W/C 1200.Apr 13, 2010 · N834HK · Emb EMB145LRSDR VGQY2010041300002Structure · corrodedSTA 1920 FRAME BULB TEE 65B04333-89 VERTICAL FLANGE IS FOUND CRACKED AND CHIPPED OFF AT RBL 6.30. COMPLIED WITH EN 1044-10, REPAIR FOR CRACKED 65B0433-89 BULB TEE VERTICAL FLANGE AT STA 1920 FRAME RBL 6.30.Apr 13, 2010 · N783SA · Boeing 747281FSDR FDEA201004121161Beam · crackedMCD SPOOLS - NR 4 SPOOL HAS CRACK INDICATIONS AT HOLES C & D. REAMED HOLE "C" TO 0.520 ", HOLE "D" TO 0.460" IAW SRM 53-50-00, FIG 17, VOL I. NO CRACKS NOTED. FABRICATED AND INSTALLED BUSHING FOR HOLE "C" IAW SRM 53-50-00, FIG 17, VOL I. NO BUSHING REQUIRApr 12, 2010 · N361FE · Doug MD1010FSDR FDEA201004121160Beam · crackedMCD SPOOLS - NR 3 SPOOL HAS CRACK INDICATIONS AT HOLES C & D. REAMED HOLES "C" AND "D" TO 0.520 ' IAW SRM 53-50-00, FIG 17, VOL I. NO CRACKS NOTED. FABRICATED AND INSTALLED BUSHINGS IAW SRM 53-50-00, FIG 17, VOL I.Apr 12, 2010 · N361FE · Doug MD1010FSDR FDEA201004121159Beam · crackedMCD SPOOLS -NR 2 SPOOL HAS CRACK INDICATIONS AT C HOLE. REAMED HOLE "C" TO 0.520 ' IAW SRM 53-50-00, FIG 17, VOL I. NO CRACKS NOTED. FABRICATED AND INSTALLED BUSHING IAW SRM 53-50-00, FIG 17, VOL I.Apr 12, 2010 · N361FE · Doug MD1010FSDR FDEA201004121150Beam · crackedMCD SPOOLS - NR 1 SPOOL HAS CRACK INDICATIONS AT C & D HOLES. REAMED HOLES "C" AND "D" TO 0.520 ' IAW SRM 53-50-00, FIG 17, VOL I. NO CRACKS NOTED. FABRICATED AND INSTALLED BUSHING IAW SRM 53-50-00, FIG 17, VOL I.Apr 12, 2010 · N361FE · Doug MD1010FSDR IPXA10159458Structure · misrepairedINSPECTION TYPE:3/C, REPAIR SURVEY SEQ NR 151-F1-01 DOES NOT CORRELATE WITH THE SRM STA 34-33, BETWEEN STR. 49R-53R. REPAIRED IAW EO NR A300-5330-37487-A AND SAA EA NR 300-5330-01-A2259, ISSUE IR.Apr 12, 2010 · N151UP · Airbus A300F4622RSDR LR7A2010041400004Stanchion · puncturedDURING LOADING FOUND .7500" HOLE IN RT STANCHION AT FS 793, RBL 62, WL 212. REPAIRED STANCHION IAW SRM SMP583 FIG 53-50-24. LOG PAGE: 31653Apr 11, 2010 · N405LC · Lkheed 382GSDR CALA2010041200133Doubler · wrong partLEFT V CLEVIS DOUBLER P/N 12778-N22007-087, AT LOCATION 727D, S3L & AMP; 3 RT DOES NOT HAVE REQUIRED EDGE DISTANCE ON ONE FASTENER HOLE. FABRICATED NEW CLEVIS DOUBLERS AT STA 727D,STR 3L & 3R FOR EXTERNAL SKIN IAW EC/RA 5310-05145. INSTALLATION TO BE ACCOMPLApr 11, 2010 · N36247 · Boeing 737824SDR DL75E101229Doubler · corrodedMAIN CABIN DOUBLER CORRODED STA 1681 RBL 30 TO RBL 48 / DECK PLATE. REPAIR ACCOMPLISHED ON N/R 15817, REF NON ROUTINE 154864.Apr 10, 2010 · N757AT · Boeing 757212SDR DL75E101228Doubler · corrodedMAIN CAIN DECK PLATE DOUBLER REPAIR STA 1681 CORRODED BL0 TO LBL 60. REPAIR ACCOMPLISHED ON NON ROUTINE 154817, REF NON ROUTINE 154865.Apr 10, 2010 · N757AT · Boeing 757212
Back to JASC 5310