JASC 5315
Service difficulty reports · 44,218
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR AALA2019121329066Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT CABIN WET AREA FLOOR BEAM AT BS 986 BETWEEN LBL 39 AND LBL 41. REPAIRED FLOOR BEAM PER EA 301074.SDR AALA2019121329054Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT CARGO COMPARTMENT FLOOR SUPPORT ANGLE AT BS 792 AND RBL 24. REPLACED FLOOR SUPPORT ANGLE PER AARD 51-00-05-1.SDR V0XD201912020001Floorbeam · corrodedL/H AND R/H 280 BEAM WEBS HAVE SIGNS OF CORROSION AND MISSING RIVET HEADS. CORRECTIVE ACTION: REPAIRED 280 BEAM IAW BOMBARDIER REO 60-53-11-594 REV-A DATED 2018-06-26, GOJET EO C700/900-53MR-010 REV O, DATED 02-26-2019, CRJ700 SRM 51-42-06, 51-26-00, 53-11-41,SDR V0XD201912020002Floorbeam · corrodedL/H F.S. 280.00 FLOOR BEAM HAS SIGNS OF CORROSION. CORRECTIVE ACTION: REPAIRED L/H F.S. 280.00 FLOOR BEAM IAW GOJET EO C700-53MR-011-O, CRJ700 SRM 53-11-41, 51-42-06, 51-24-36, 51-42-21, 51-26-00, 51-42-13, 51-21-11, 51-25-06, 51-42-11, 53-11-41, 51-25-16, 51-SDR CALA2019112862061Floorbeam · scratchedFWD CABIN BS 328 FLOOR BEAM HAS SCRATCHED FROM RBL 12 TO RBL 48. (REF NR 99853400) REPAIRED FLOOR BEAM AT STA 328 BL "0" TO RBL 63 AS PER BOEING 737 DRM 53-10-51 REPAIR 7 AND RES 2015289-15 AND EC/RA 5311-02319SDR SWIA2019112246786Floorbeam · corroded* CORROSION FS280.00 CROSSBEAM FLOOR PANEL SUPPORT ANGLE, MARKED WITH RED SHARPIE. (C-CHECK) RO: 11/21/2019 REMOVED AND REPLACED FS280.00 CROSSBEAM FLOOR PANEL SUPPORT ANGLE IAW SRM.SDR SWIA2019123147504Floorbeam · crackedFS 484 OUTBOARD CLIP AT RBL 36 BRACKET IS CRACKED (C-CHECK) RO 12/27/2019 REMOVED CRACKED AND INSTALLED NEW FS 484 OUTBOARD CLIP AT RBL 36 BRACKET REF BOMBARDIER REO. SEE CONTINUATION CARD FOR DETAILS. LK CK GOOD.SDR SWIA2019122747180Floorbeam · crackedLBL 12.00 COCKPIT FLOORBEAM WAS CRACKED IN THE RADIUS AT BS 280. INSTALLED NEW LBL 12 COCKPIT FLOORBEAM ANGLE IAW SRM.SDR SWIA2019122747173Floorbeam · corrodedCOCKPIT FLOOR SUPPORT AT F.S.280 HAD CORROSION. REMOVED AND REPLACED THE FLOORBEAM ANGLE IAW SRM.SDR AALA201911259043Floorbeam · corrodedAIRCRAFT IN BASE VISIT: CORROSION ON FLOORBEAM AT FR16, Z-500, Y503.2. REMOVED AND REPLACED FLOORBEAM IAW SRM 51-72-11, 51-42-11.SDR DALA2019112526893Floorbeam · not reportedFLOOR BEAM REPAIRED PER SRM 53--00-51SDR DALA2019112526892Floorbeam · corrodedCORROSION LEVEL: 2 FLC LOWER FLOOR BEAM UPPER CHORD IS CORRODED AROUND NUTPLATE AT STA 654+121, BL25REMOVED CORROSION 100% MAT. LOSS FOUND TO BE OUT OF LIMITS. EPLACED WITH NEW "J" CHORD. (LP 1369739)SDR FDEA2019112213022Floorbeam · corrodedMAIN CABIN STA 1681 LBL 39/40 FLOOR BEAM UPPER T-CAP IS CORRODED REMOVE DAMAGE AND REPAIRED IAW FEDEX EA# F-5310-T0350636SDR SWAA2022032443827Cap · corrodedPASSENGER CABIN ; STA 947; LBL 50; WL 208; UPPER SURFACE OF T-CAP HAS CORROSION RUNNING UNDER LAU MOUNT / REMOVED CORROSION STA 947 T-CAP UPPER SURFACE LBL50 ORIG T .180' LOSS .040' REMAINING .140' OUT OF LIMITS IAW SRM 53-70-51-1A-1 REPAIRED T-CAP FROM LBL 7 SDR SWIA2019122747226Floorbeam · crackedBS 280 FLOORBEAM ANGLE ON THE INBOARD SIDE OF RBL 9 WAS CRACKED. REMOVED AND REPLACED THE FLOORBEAM ANGLE IAW REO.SDR SWIA2019122747225Floorbeam · crackedBS 280 FLOORBEAM ANGLE LBL 9 WAS FOUND CRACKED. REMOVED AND REPLACED THE FLOORBEAM ANGLE IAW REO.SDR SWAA2019120659360Floorbeam · corrodedUPPER SURFACE OF T-CAP CORRODED RUNNING UNDER LAV MOUNT AT BS. 947, LBL 50. / REPAIRED T-CAP IAW SRM.SDR DALA201911256884Floorbeam · corrodedCORROSION LEVEL: 2 MAIN DECK FLOOR BEAM UPPER CHORD FOUND CORROSION AT STA 1480, LBL 44.5 AND LBL 46. C/W SRM 53-00-51. (LP 1367971)SDR FDEA2019112203016Floorbeam · crackedMAIN CABIN FLOORBOARD CROSSBEAM LOCATED AT FRAME 44 BETWEEN SEAT TRACKS 3R AND 4R HAS A CRACK AND ELONGATED FASTENER HOLES (PARTS RACK) FABRICATED NEW CROSSBEAM PER FEDEX EA 6-5310-T0350590 & AIRBUS DWG A53812970 ISSUE A, 6-5310-T0350590-P1 FUSELAGE - MAINSDR R61A201911201285Floorbeam · corrodedWHILE IN HEAVY CHECK - CORROSION- CENTER FUSELAGE III WET AREA 53-23 RH SPLICE FRAME 90 AS MARKED. REMOVED AND REPLACED SPLICE PN: 170-86119-005 REF EMB SRM 51-21-01 AND 51-40-08,SDR VGCA2019112619002Floorbeam · corrodedFLOOR BEAM UPPER CAP CORRODED AT STATION 870 BETWEEN LOWER BODY BUTTOCK LINE 44-55SDR VGCA2019112619004Floorbeam · corrodedFLOOR BEAM CORRODED AT STATION 920 AT LEFT BODY LINE 55SDR VGCA2019112619003Floorbeam · corrodedFLOOR BEAM CORRODED AT STATION 920 AT LEFT BODY LINE 28SDR C77A20191119001Floorbeam · corrodedTHIS EO IS BEING ISSUED TO PROVIDE INSTRUCTIONS TO ACCOMPLISH THE PERMANENT REPAIR OF CORROSION DAMAGE IN MULTIPLE REGIONS ON THE UPPER FLANGE OF THE P/N 170-21769-403 FR17 CROSSBEAM IN THE CABIN FLOOR STRUCTURE OF THE FORWARD FUSELAGE. REFERENCE FIGURES 1-2 FSDR SWIA2020010947583Floorbeam · corrodedTOP OTBD CORNER OF FLOOR BEAM NEXT TO RH SIDE SILL AT FS349.00 CORRODED, MARKED (C-CHECK) RO 01/07/2020 REMOVED CORROSION ON TOP OUTBOARD CORNER OF FLOOR BEAM RH AT FS 349.00 AND FOUND TO BE OUT OF LIMITS. REPAIRED PER REO. COMPLIED WITH TASK CARD. SEE CONTINSDR SWIA2020010947580Floorbeam · corrodedAFT COCKPIT FLOOR SUPPORT ANGLE CORRODED AT FS280.00 (C-CHECK) RO 01/07/2020 REMOVED CORROSION FROM AFT FLOOR SUPPORT ANGLE AT F.S.280.00 IN REF CRJ200 SRM. MEASURED DEPTH OF BLEND OUT AT .028" WITH MICROMETER: TUC3939, DUE: 30-APR-20. ORIGINAL MATERIAL THICSDR SWIA2020010947579Floorbeam · corrodedFS280.00 BEAM BETWEEN RBL9 AND LBL9 CORRODED ACROSS THE TOP, MARKED (C-CHECK) RO 01/07/2020 REMOVED CORROSION ON TOP OF FS280.00 BEAM (FLOOR ANGLE) BETWEEN RBL9 AND LBL9, FOUND TO BE OUT OF LIMITS. REMOVED AND INSTALLED NEW F.S.280.00 BEAM FILLER ANGLE P/N 60SDR CALA2019112532030Floorbeam · corrodedAFT CABIN BS 986.5 RBL 43 HAS CORROSION AROUND FASTENER HOLE AS MARKED. [DOT 124-013] REF. AAR N/R: 99853333 REMOVED "TEE" CAP OUT OF LIMITS AT STA 986.5 LBL 38 TO RBL 50. FABRICATED "TEE" CAP AND INSTALLED STA 986.5,LBL 38 RBL 50 AS PER B-737-800 SRM 51-40-02SDR FDEA2019111982979Floorbeam · corrodedAFT CARGO COMPARTMENT @ FRAME 63 FRAME CORRODED UNDER FASTENER REPAIRED T-CAP IAW A300-600 SRM 53-10-15 FIG 208SDR REXA2019112671699Floorbeam · cracked"MPEDV: REPAIR PARTS OF LONGITUDINAL BEAM RBL12. AT FS.280 IN REF NRC00203.
"SUMMARY : REPAIR PARTS OF LONGITUDINAL BEAM RBL12. WERE FABRICATED PER CRJ-900 SRM 53-11-43-201-003-A01SDR AALA201911189024Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT MAIN CABIN RIGHT HAND FLOOR BEAM UPPER SHEET AT FR 86 AND Y292.1. REPLACED SHEET PER AARD 51-20-01 REPAIR 1 AND AARD 53-00-00-3 REPAIR 3.SDR AALA2019120549036Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT WET AREA FLOOR BEAM AT FR 66 AND +Y1162.5. REPLACED FLOOR BEAM PER SRM 51-42-11.SDR AALA2019120549035Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT WET AREA FLOOR BEAM AT FR 66 AND -Y1162.5. REPLACED FLOOR BEAM PER SRM 51-42-11.SDR AALA2019120549033Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT WET AREA FLOOR BEAM AT FR 68 AND -Y1162.5. REPLACED FLOOR BEAM PER SRM 51-72-11.SDR AALA201911259044Floorbeam · corrodedAIRCRAFT IN BASE VISIT: CORROSION ON FLOORBEAM AT FR68, Z-500, Y-765. REMOVED AND REPLACED FLOORBEAM IAW SRM 51-72-11, 51-42-11.SDR AALA201911259047Floorbeam · corrodedAIRCRAFT IN BASE VISIT: CORROSION ON FLOOR SUPPORT BEAM AT FR66, Z-500, Y765. REMOVED AND REPLACED FLOOR SUPPORT BEAM IAW SRM 53-00-14-283-002, 51-75-12, 51-42-11.SDR SWIA2019122747435Crossbeam · crackedBS 280 CROSSBEAM WAS CRACKED AT 2 PLACES, LBL 9 AND RBL 9, PERFORMED A REPAIR IAW REO.SDR SWIA2019122747215Floorbeam · corrodedCORROSION FOUND ON THE BS 280 FLOORBEAM ANGLE. REPLACED FLOORBEAM ANGLE IAW SRM.SDR SWIA2019122747206Floorbeam · crackedCRACK DETECTED FWD SIDE OF RT BS 280 FLOORBEAM RBL 12, WHERE R/H COCKPIT FLOOR SUPPORT BEAM ATTACHES TO FLOOR POST. REPAIRED IAW SRM. MAJOR REPAI.SDR AALA2019120659029Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR BEAM UPPER "T" CAP AT BS 987 BETWEEN LBL 8 AND LBL 47. REPAIRED FLOOR BEAM PER EA 300550.SDR AALA2019120549030Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON CABIN FLOOR BEAM UPPER T CAP AT BS 987 BETWEEN LBL 8 AND LBL 47. REPAIRED FLOOR BEAM PER SRM 53-70-51-2R-4 AND EA 300550.SDR SWAA2019112639161Floorbeam · corrodedAFT LOWER BULKHEAD TO FLOOR SUPPORT ANGLE CORRODED AT BS. 947, BETWEEN RBL 18 TO LBL 8. / R&R ANGLE PER SRM & DWG.SDR SWIA2019123147528Floorbeam · corroded*FS 280 FWD FLOOR SUPPORT HAS CORROSION. (C-CHECK) RO 12/27/2019 ORIGINAL MATERIAL THICKNESS IS 0.040€? REF CRJ200 SRM. REMAINING MATERIAL THICKNESS PER NDT IS 0.030€?. MATERIAL REMOVED WAS 0.010€?. ALLOWED MATERIAL TO BE REMOVED IS 10% (0.004€?) REF CRJ2SDR SWAA2019120239243Floorbeam · corrodedAFT CARGO COMPARTMENT FLOOR SUPPORT HAD SEVERAL SPOTS OF CORRODED TOP OF CIRCUMFERENTIAL AT BS. 887, BETWEEN RBL 20 AND LBL 20. / R&R "T" FLOOR SUPPORT PER SRM AND DWG.SDR REXA2019111401681Floorbeam · corroded"INITIAL INSPECTION : CORROSION ON FLOOR SUPPORT FS280 BTW STGR 25LH TO 25RH AT MAIN AVIONICS COMPARTMENT ( E/E ) (TCI 100-09)
"SUMMARY OF NRC 00193: DUE CORROSION LEVEL 2 ON ANGLE SUPPORT, CRAWLWAY FLOOR FS280 BTW STGR 25LH TO 25RH AT MAIN AVIONICS COMPARTMESDR DALA2019111406669Floorbeam · mechanic errorFOUND MISDRILL FASTENER HOLE ON FLOOR BEAM AT STA 456 RBL 33.00 & LBL33.00. REPAIRED PER SRM 53-00-51. (LP 1359053)SDR DALA2019111406667Floorbeam · mechanic errorFOUND MISDRILL FASTENER HOLE ON FLOOR BEAM AT STA 654A+88 LBL 33.00, REPAIRED PER SRM 53-00-51. (LP 1359022)SDR C77A2019111400001Floorbeam · corrodedTHIS EO IS BEING ISSUED TO PROVIDE INSTRUCTIONS TO ACCOMPLISH THE ON-CONDITION REPAIR OF CORROSION OR OTHER DAMAGE TO THE CENTER FUSELAGE III AFT CABIN RH FLOOR BEAM P/N 170-65669-004. THE PERMANENT REPAIR WILL BE ACCOMPLISHED BY DIRECT REPLACEMENT OF THE AFFESDR SWIA2019123147494Floorbeam · cracked* LBL 27 AT FS 484 INSIDE FUSELAGE.CLIP HAS CRACK AT UPPER RADIUS. (C-CHECK) RO 12/27/2019 REMOVED AND INSTALLED NEW REPLACEMENT CLIP P/N: 601R31171-17 P/O: T-50829 AT FS 484, LBL 27 OUT BOARD REF BOMBARDIER REO. C/W SKYWEST TASK CARD. LEAK CHECK GOOD AT THSDR SWIA2019123147493Floorbeam · cracked* FS 484 AT LBL 36 OUT BOARD CLIP HAS CRACK. INSIDE FUSELAGE. (C-CHECK) RO 12/27/2019 RRMOVED AND INSTALLED NEW REPLACEMENT CLIP AT FS 484, LBL 36 OUT BOARD REF BOMBARDIER. REO, LEAK CHECK GOOD AT THIS TIME. C/W SKYWEST TASK / CARD.
Back to JASC 5315