JASC 5315
Service difficulty reports · 44,198
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR DALA2025102707872Floorbeam · corrodedSHIP 3317 CORROSION WAS FOUND IN THE BULK CARGO COMPARTMENT FLOOR STRUCTURE LONGITUDINAL BEAM AT FR 69, Y=0. CORRECTIVE ACTION: COMPLIED WITH ERA 629815-14. (1269419)SDR SWIA202602275374Floorbeam · corrodedBS 280 RT CAP ANGLE REF SRM 53-11-10, ITEM 121, CORRODED AND DISTORTED. REMOVED AND REPLACED THE BS 280 RT CAP ANGLE. WORK DONE IAW SRM 51-42-06, SRM 51-42-21, SRM 53-11-10, GREO 670-53-11-594, REV A, AND REO 670-53-11-2182, REV--.SDR SWIA202510275362Floorbeam · corrodedCRAWLWAY FLOOR ANGLE SUPPORT AT FS280.00 IN AVIONICS BAY CORRODED. REMOVED AND REPLACED CRAWLWAY FLOOR SUPPORT AT FS280.00 IN AVIONICS BAY WITH REFERENCE TO SRM 51-42-06, SRM 51-42-13 AND SRM 51-42-21.SDR SWIA20202274125Floorbeam · corrodedFS280.00 RH FLOOR BEAM CORRODED (REF SRM 53-11-10 ITEM 119). (C-CHECK RO 02/25/2026)REMOVED AND REPLACED THE FS280.00 RH FLOOR BEAM. WORK DONE IN REFERENCE WITH THE CRJ-700 SRM 51-42-06, SRM 51-42-21, SRM 53-11-10 AND GREO 670-53-11-594 DATED: 2015/06/26 REV SDR SWIA202602274124Floorbeam · corrodedFS280.00 LH FLOOR BEAM CORRODED (REF SRM 53-11-10 ITEM 118). (C-CHECK RO 02/25/2026)REMOVED AND REPLACED THE FS280.00 LH FLOOR BEAM. WORK DONE IN REFERENCE WITH THE CRJ-700 SRM 51-42-06, SRM 51-42-21, SRM 53-11-10 AND GREO 670-53-11-594 DATED: 2015/06/26 REVSDR REXA2025121201011Floorbeam · crackedCRACKED CENTER COCKPIT FLOOR BEAM RBL12 AT FS 280.00 FLOOR INTERNAL SUPPORT STRUCTURE BELOW FLIGHT COMPARTMENT. CRACKED CENTER COCKPIT FLOOR BEAM RBL12 AT FS 280.00 FLOOR INTERNAL SUPPORT STRUCTURE BELOW FLIGHT COMPARTMENT. WAS REPAIRED PER REO 690-53-11-2073SDR SWAA2025112027439Floorbeam · crackedCRACK ON THE FLOORBEAM LOCATED BS 540 BTW LBL 0 TO LBL 24.75, WL 208.1. REPLACED FLOORBEAM IAW SRM 51-10-02-0G, ITEM 9, SRM 51-40-02-0G, AND DWG 143A0060, SHEET 64, REV -.SDR JJBA20251120078Floorbeam · corrodedRH FLOOR BEAM GUSSET AT FR 20, STR 4R, HAS CORROSION. REMOVED AND REPLACED RH FLOOR BEAM GUSSET AT FR20.SDR R61A2025111400499Floorbeam · corrodedDURING HEAVY CHECK CF III R/H FLOOR PANEL SUPPORT BRACKET AT FR 87 RBL28 FOUND CORRODED. REMOVED AND REPLACED FLOOR PANEL SUPPORT BRACKET IAW EMB 170/175 SRM 51-41-01SDR SWAA2025111127537Floorbeam · crackedFLOORBEAM CRACKED, BS 540, LBL 1, WL 208. REMOVED AND REPLACED FLOORBEAM IAW SRM 51-40-02-0G-0, AND DWG 143A5240.SDR SWAA2025110627536Floorbeam · crackedFLOORBEAM CRACKED, BS 540. RBL 1, WL 208. REMOVED AND REPLACED THE FLOORBEAM IAW SRM 51-40-02-0G-0, AND DWG 143A5240.SDR SWI2025F01456Floorbeam · corrodedFS280.00 RH FLOOR BEAM CORRODED (REF SRM 53-11-10 ITEM 119). OPEN)SDR SWIA2025102400023Floorbeam · corrodedFS280.00 LEFT FLOORBEAM CORRODED (REF SRM 53-11-10 ITEM 118). OPENSDR JR2R20251023404Floorbeam · corrodedCROSS BEAM AT FR 14 BETWEEN RBL 12 TO RBL 48 IS CORRODED. OUT OF LIMITS. REPAIREDSDR JR2R20251023406Floorbeam · corrodedFLOOR BEAM AT RBL 11 AND FRAME 87 IS CORRODED. OUT OF LIMITS. REPAIREDSDR AALA202601152253Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOOR BEAM UPPER CHORD TEE FITTING AT BS 967, LBL 48. REPAIRED UPPER TEE FITTING PER EA 369387.SDR CALA2025102210412Floorbeam · damagedREPAIRED FLOORBEAM STA 365.25 UPPER CHORD, RBL 64 TO 47.SDR DALA2025102707840Floorbeam · corroded(LOG 1262803) STA 947 FLOOR BEAM HAS CORROSION UNDER LAV FITTINGS AT LBL24 AND LBL 48. REPAIRED FLOOR BEAM STA 947 AT LBL24 AND LBL48 AS PER REF B737-900 SRM 53-70-51-2R.SDR AALA202601142899Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOORBEAM UPPER TEE AT STA 328, RBL 46. REPAIRED UPPER TEE PER SRM 53-10-51-2R-8 ALTERNATVIE 3 AND EA 369583.SDR SWAA2025112026188Floorbeam · corrodedCORROSION ON FLOORBEAM LOCATED BS 986.5 LBL44 WL 208.1 AT AFT GALLEY AREA. PERFORMED PERMANENT REPAIR PART STRAP, ANGLE AND FILLER ON FLOORBEAM LOCATED BS 986.5, LBL 44, WL 208.1 AT AFT GALLEY AREA IAW SRM 51-40-02, AND SRM 53-70-51-2R-6, REPAIR 6.SDR AALA202511136589Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FORWARD CABIN FLOORBEAM AT FR 16 AND -Y254. REPLACED THE FLOORBEAM PER SRM 51-42-11.SDR DALA2025102307764Floorbeam · corroded(LOG 1262728) STA 986 FLOOR BEAM HAS LIGHT CORROSION AT FLOOR BOARD HOLES FRO RBL50 TO LBL50. REPAIRED STA 986 FLOOR BEAM AT FLOOR BOARD HOLE AT RBL50 + UBL50 IAW B737-900 SRM 53-70-51-2R-6 RESTORED FINISH TO AREA IAW B737-900 SRM 51-20-01-0G.SDR AALA202601151511Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOORBEAM AT BS 967, RBL44. REPAIRED FLOORBEAM IAW EA 369387.SDR AALA202601148805Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOORBEAM UPPER TEE CAP AT BS 986, LBL 42. REPAIRED UPPER TEE IAW SRM 53-70-51-2R-4.SDR AALA202601145337Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON PASSENGER CABIN FLOORBEAM UPPER TEE AT BS 986, LBL 31. REPAIRED UPPER TEE IAW SRM 53-70-51-2R-4.SDR SIMA20251018001Floorbeam · corrodedRIGHT FLOORBEAM BETWEEN WALL AND CENTER SEAT TRACK BEAM AT FR84 CORRODED (MAJOR REPAIR). REPAIREDTHE FLOORBEAM IAW ERS-EJ-53MR- 5301.SDR SWAA2025111025528Floorbeam · crackedCRACK ANGLE FLOOR STRUCTURE LOCATED STA695 AND LBL24.75 PASSENGER CABIN. REPLACED ANGLE FLOOR STRUCTURE LOCATED STA695 AND LBL24.75 PASSENGER CABIN IAW SRM 51-10-02 ITEM 9 AND SRM 51-40-02; DWG 273A9110 SHEET 6 REV: A.SDR SWAA2025111025529Floorbeam · crackedCRACK ANGLE FLOOR STRUCTURE LOCATED STA695 AND RBL24.75. REPLACED ANGLE FLOOR STRUCTURE LOCATED STA695 AND RBL24.75 PASSENGER CABIN IAW SRM 51-10-02 ITEM 9 AND SRM 51-40-02 DWG 273A9110 SHEET 6 REV: A.SDR AALA202510203245Floorbeam · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT CABIN FLOOR BEAM INBOARD UPPER SECTION CONNECTING SPLICE AT FR 66 AND +Y1292. REPLACED SECTION CONNECTING SPLICE PER SRM 51-72-11.SDR IPXA2025110724277Floorbeam · corrodedCTR CGO COMP FLOOR AREA STA 1841 FLOOR BEAM FLOOR PANEL SUPPORT CHANNEL TOP SURFACE HAS CORROSION FROM LBL 7 TO RBL 24.SDR SWIA2025103100017Floorbeam · corrodedAFT WET AREA FLOORBEAM AT FR 87 Y=10.5 CORRODED. REMOVED AND REPLACED THE FLOORBEAM IAW SRM 51-40-08.SDR FDEA202510172038Floorbeam · corrodedFWD CARGO COMPARTMENT FLOOR SUPPORT BEAM CORRODED AT FR29 Y-1470 REPAIRED THE FWD CARGO COMPARTMENT CORRODED FLOOR SUPPORT BEAM AT FR29 Y-1470 PER A300-600 SRM53-10-15-201 FIGURE 207 AND EA: 6-5321-T0385349 P1. TITLE: FUSELAGE - CARGO COMP FLOOR - FWD CARSDR SWIA2026022705382Floorbeam · crackedLEFT COCKPIT CENTER FLOOR PANEL LANDING/ANGLE NEAR BS 280 & LBL 11.128 AND AT WL 72.10 IS CRACKED. REMOVED AND REPLACED THE LT COCKPIT CENTER FLOOR PANEL LANDING/ANGLE NEAR BS 280 & LBL 11.128 AND AT WL 72.10 IAW SRM 51-42-06.SDR SWIA2025101675370Floorbeam · crackedRIGHT COCKPIT CENTER FLOOR PANEL LANDING/ANGLE NEAR FS 280.00 & RBL 11.128 AND AT WL 72.10 IS CRACKED. REMOVED AND REPLACED THE RH COCKPIT CENTER FLOOR PANEL LANDING/ANGLE NEAR FS 280.00 & RBL 11.128 AND AT WL 72.10 IN REFERENCE WITH THE SRM 51-42-06.SDR VNAA20251015033Floorbeam · corrodedFLOORBEAM AT FS333.00 RBL 9.00 IS CORRODED. REPAIRED IAW MHIRJ REO 670-53-21-25485 REV-- .SDR JR2R20251016451Floorbeam · crackedANGLE CLIP ON THE FWD SIDE OF FLOOR CROSS BEAM 12 AT BL 0 IS CRACKED. REPLACEDSDR JR2R20251016450Floorbeam · crackedANGLE ON THE FWD SIDE OF FLOOR CROSS BEAM 12 AT ABOUT LBL 36 IS CRACKED. REPLACEDSDR SWAA2025111924783Floorbeam · corrodedCORROSION ON FLOORBEAM LOCATED BS 986.5, WL 208.1 AND LBL 42 AFT GALLEY AREA. REPAIRED FLOORBEAM IAW SRM 53-70-51-2R-6, REPAIR 6, FIGURE 205, ALTERNATIVE 4, SHEET 1, DETAIL A-A.SDR SWAA2025111224461Floorbeam · crackedAAI INSPECTION: MAIN CABIN - FLOOR STRUCTURE SUPPORT HAS CRACK AT STA 540; BL 0 TO RBL 24.75. REPLACED BREAK PANEL SUPPORT AND FASTENERS ON FLOOR STRUCTURE STA 540 BL0 TO RBL 24.75 AT MAIN CABIN B737-700 SRM 51-10-02 Ï¿½TEM 9 AND DWG 143A0060 SHEET 46 REV-.SDR SWAA2025111224462Floorbeam · crackedMAIN CABIN - FLOOR STRUCTURE SUPPORT HAS A CRACK AT BS 540; BL 0 TO LBL 24.75. REPLACED BREAK PANEL SUPPORT AND FASTENERS ON FLOOR STRUCTURE STA 540 BL 0 TO LBL 24.75 AT MAIN CABIN I.A.W B737-700 SRM 51-10-02 Ï¿½TEM 9 AND DWG 143A0060 SHEET 46 REV-.SDR IPXA2025110382369Floorbeam · bentMAIN DECK FLOOR STRUCTURE- CROSSBEAM BENT AT FR48 BETWEEN -Y450 AND -Y953, VERIFIED CROSSBEAM REPLACED ON SREO. COMPLIED WITH SREO-75878-REQ001.SDR IPXA2025102882408Floorbeam · crackedFAULT - STR - Z241 -MAIN DECK FLOOR STRUCTURE- CROSSBEAM CRACKED (BUCKLING) AT FR51 BETWEEN -Y450 AND -Y953, DOT 78-20. ACCOMPLISHED WITH SREO-75878-REQ001. REVIEWEDSDR SIMA20251015001Floorbeam · corrodedLH FLOOR BEAM UNDER FLOOR SILL BETWEEN FR19-20 HAS CORROSION UNDER ROUND STAINLESS STRIP. (LEVEL 2 CORROSION). RAR LH FLOOR BEAM UNDER FLOOR SILL BETWEEN FR19 AND FR20 IAW ERJ 175 SRM 51-40-08SDR VNAA20251015032Floorbeam · corrodedFLOORBEAM AT FS333.00 RBL 9.00 IS CORRODED. REPAIRED IAW MHIRJ REO 670-53-21-25485 REV-- DATED 2025-02-18SDR REXA2026052800838Floorbeam · crackedAFTER CUT DOOR POST RBL12 AT FS 280.00 LOWER SECTION OF THE BULKHEAD POST, CRACK ON FLOORBEAM WAS FOUND. FLOORBEAM WAS REPLACED PER CRJ900 SRM 51-42-06-001-001-A01 AND SRM 51-42-21-001-001-A01SDR SWIA2025101475368Floorbeam · crackedFLOORBEAM AT BS 280 AND RBL 12 CRACKED ON THE AFT OUTBOARD FLANGE FROM APPROX WL 70.00 - WL 72.50. COMPLIED WITH REO 670-53-11-896 REV-. GENERIC REPAIR TO CENTER COCKPIT FLOORBEAM BS 280, WL70 - 72.50. AND REO 670-53-11-2195 REV -. REPAIR TO CENTER COCKPISDR AALA202510154678Floorbeam · crackedAIRCRAFT IN BASE MAINTENANCE: CARCK IN PASSENGER CABIN FLOORBEAM ASSEMBLY PANEL LOCATED AT BS 540, LBL 2. REPLACED FLOORBEAM ASSEMBLY PANEL PER AARD 51-00-05-1.SDR N6WA2025101401Floorbeam · corrodedFLOOR BOARD ATTACHED BRACKET AT FS280.00 HAS CORROSION. REMOVED AND REPLACED FLOORBOARD ATTACHED BRACKET AT FS280.00 IAW CRJ SRM 51-42-21SDR FDEA202510131975Floorbeam · corrodedAFT CARGO COMPARTMENT FLOOR SUPPORT BEAM CORRODED AT FR58 Y-805 - Y-1470 REPAIRED THE AFT CARGO COMPARTMENT CORRODED FLOOR SUPPORT BEAM AT FR58 Y-805 - Y- 1470 PER A300-600 SRM53-10-15-201 FIGURE 207 AND EA: 6-5321-T0385357 P1. TITLE: FUSELAGE - CARGO COMPSDR CALA2025101410068Floorbeam · corrodedMAIN CABIN AFT WET AREA CORROSION AT FLOORBEAM STA 947.5 LBL 53". ACCOMPLISHED REPAIR AT LT AFT WET AREA FLOORBEAM 947.5" LBL 53" PER B737-800 SRM 53-70-51-2R-5 AND SRM 51-40-02-0G-0
Back to JASC 5315