JASC 5315
Service difficulty reports · 44,223
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR MWEA98515Floorbeam · misrepairedFLOORBEAM AT FS 408 HAS AN IMPROPER REPAIR DOUBLER ON THE RIGHT HAND END OF BEAM. MTC REMOVED IMPROPER REPAIR, FABRICATED PROPER REPAIR DOUBLER AND INSTALLED DOUBLER.SDR 98FDEA00308Floorbeam · corrodedNR 0902, 72-C235-02, UPPER LOBE CORROSION ON FLOORBEAM BS 680, BLO - RBL 24. REMOVED CORROSION OUT OF LIMITS. INSTALLED REPAIR PER SRM 53-10-8. TREATED AND PRIMED.SDR 98FDEA00285Floorbeam · corrodedCORROSION (C53-224-01, 2) ON UPPER CHORD OF BS 950 FLOORBEAM LBL 16 TO 19 WL 208. *S/D* REPAIRED CORROSION AREAS OF UPPER CHORD BS 950 FLOORBEAM FROM LBL 16 TO 19, WL 208 PER EA NR 7-5310-38742.SDR UPS98826600Floorbeam · damagedINSPECTION TYPE:C/CK MAIN CABIN STA 680 AND RBL 50 FLOORBEAM GOUGED, CHAFFED AND CORRODED UNDERSIDE. FABRICATED REPAIR STRAP IAW REO 04670. ALODINED, PRIMED AND INSTALLED REPAIR STRAP IAW DC8 SRM 51 18 AND REO 04670.SDR EISA98100Floorbeam · corrodedDURING ACCOMPLISHMENT OF CPCP WORKCARD, FOUND AFT CARGO PIT CORROSION AROUND NUTPLATE ON FLOORBEAM FS 965 RIGHT-HAND SIDE. FABRICATED AND INSTALLED REPAIR DOUBLER PER SRM 53-05, FIGURE 20 AND 51-30-2. TT: 66,670:41 HOURS. TC: 61,562. (X)SDR UPS98826727Floorbeam · corrodedINSPECTION TYPE:C/CK, FLOORBEAM AT STA 1580 RIGHT HAND TUNNEL AREA CORRODED. REMOVED CORROSION, OUT OF LIMITS IAW DC8 SRM 51-1-8. FABRICATED TWO ANGLES AND FILLERS IAW REO 04682. ALODINED AND PRIMED IAW DC8 SRM 51-1 -8. INSTALLED ANGLES AND FILLERS IAW REOSDR UPS98826679Floorbeam · corrodedINSPECTION TYPE:C/CK, CABIN FLOORBEAM STATION 8 RBL 26 HAS CORROSION AND UPPER FWD FLANGE LOWER SURFACE AT ATTACH LUG BOLT BROKEN OFF IN LUG. FABRICATED REPAIR STRAP IAW REO 04644. INSTALLED REPAIR STRAP IAW DC 8 SRM 51 1 20D BAD REO 04644. REF TO UPS NR 5SDR UPS98826635Floorbeam · crackedINSPECTION TYPE:C/CK, FLOORBEAM STA 55 AT RBL 5 UPPER T CAP AFT FLANGE CRACKED. REMOVED DAMAGED AREA, FABRICATED AND INSTALLED T CAP REPAIR IAW REO 04620, DC8 SRM 53 3 3 AND 51 1 21 AND 51 1 8 AND 51 1 11.SDR UPS98826605Floorbeam · corrodedINSPECTION TYPE:C/CK CABIN FLOORBEAM, STA 8 RBL 26, HAS CORROSION ON FWD FLANGE. FABRICATED REPAIR STRAP AND INSTALLED IT IAW REO 04644 (ATTACHED TO UPS NR 542659) AND DC8 SRM 51 1 8, 51 1 20D.SDR TWAA9807008Floorbeam · corrodedMCI - DURING OP 15 MAINTENANCE CHECK, FOUND CORROSION ON FLOORBEAM FS 200, RBL 58 IN. REMOVED FLOOR SUPPORT BEAM AND INSTALLED NEW BEAM PER SRM 51-01 AND TWA STANDARD PRACTICES. (X)SDR SWA980654Floorbeam · crackedDURING SCHEDULED 1/2 D-CHECK, FOUND CRACKED FLOORBEAM AT BS 787 RBL 14. REMOVED AND REPLACED PER BOEING SRM.SDR TWAA9806919Floorbeam · corrodedMCI - DURING OP15 MAINTENANCE CHECK, FOUND CORROSION ON FLOORBEAM AT FS 197, LBL 6 INCH. REPLACED BEAM PER SRM 51-01, AND STD PRACTICES. (M)SDR TWAA9806514Floorbeam · corrodedMCI - DURING OP 16 MAINTENANCE CHECK, FOUND AT STA 937 TO STA 965, CABIN FLOORBEAM CAP WITH METAL REMOVED BEYOND LIMITS FOR CORROSION REMOVAL. INSTALLED NEW SECTION AT FLOOR SUPPORT PER SRM 53-05, P21, ITEM 6A, AND ARA 10993. ACFT TT: 75,041 HOURS. ACFT TCSDR SWA980646Floorbeam · corrodedDURING SCHEDULED D CHECK, FOUND CORRODED FLOORBEAM AT BS 277, RBL 41, WL 208. REMOVED AND REPLACED PER BOEING SRM.SDR USAA980171Floorbeam · corrosionCLT - DURING Q-5 CHECK VISUAL INSPECTION, FOUND A .50 INCH CORROSION AREA AT FLOORBOARD HOLES TOP OF FLOOR BEAM T-CAP STA 344 LBL ZERO TO LBL 48. CORROSION TASK CARD NR C53-107-01. INSTALLED NEW T-CAP REPAIR ANGLE AND SPLICES PER REPAIR DOCUMENT TRM 53-10-03SDR SWAA980619Floorbeam · corrodedDURING SCHEDULED D-CHECK, FOUND FLOORBEAM CORROSION AT BS 294.5, 986.5. REPAIRED PER BOEING SRM.SDR DL72W980970Floorbeam · corrodedFLOORBEAM CORRODED STA 344 BL 0. REMOVED CORROSION PER SRM 51-10-3. OUT OF LIMITS PER SRM 53-10-1 FIG 4. REMOVED ANGLE SUPPORTS, STARTED MANUFACTURING NEW SUPPORT. BEGAN REMOVAL OF T-CAP. COMPLETED REMOVAL OF T-CAP. DRILLED UP NEW T-CAP, EXCEPT TOP OF SSDR CALA9800674Floorbeam · corrodedINSPECTION FOUND UPPER CAP OF FLOORBEAM CORRODED AT FS 1130, LBL 60 TO RBL 60. THE FLOORBEAM WAS CORRODED IAW ECRA 5310-03707.SDR C2XA98IA115Floorbeam · corrodedIAH - DURING C-CHECK INSPECTION, FOUND FLOORBEAM T-PROFILE CORRODED AT FRAME NR 38. MAINTENANCE REMOVED AND REPLACED THE T-PROFILE IAW EMB-120 SRM 51-40-02. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE. (M)SDR TWAA9807006Floorbeam · corrodedMCI - DURING OP 15 MAINTENANCE CHECK, FOUND CORROSION ON FLOORBEAM CAP, FS 200, LBL 12 IN. REPLACED CAP PER SRM 51-01. (X)SDR TWAA9806920Floorbeam · corrodedMCI - DURING OP15 MAINTENANCE CHECK, FOUND CORROSION ON FLOORBEAM AT FS 180, RBL 20 INCH TO 43 INCH. REMOVED AND INSTALLED NEW FLOORBEAM PER SRM 51-01. (M)SDR SIMA981042Floorbeam · corrodedSAW - DURING MBV-1 INSPECTION, MAINTENANCE REPORTED FLOORBEAM 36 WAS CORRODED. MAINTENANCE REPAIRED FLOORBEAM 36 IAW SRM 53-00-00 FIGURE 435. AIRCRAFT WAS RETURNED TO SERVICE. (M)SDR MWEA98431Floorbeam · corrodedTHE FLOORBEAM AT FUSELAGE STATION 237 RIGHT BOTTLINE 41 WAS FOUND CORRODED. MTC REMOVED CORROSION AND REPAIRED FLOORBEAM.SDR UPS98226521Floorbeam · corrodedINSPECTION TYPE:SI CORROSION (C53-111-01.00-02)FWD CARGO BAY BS 720 LOWER FLANGE OF FLOORBEAM IN AND AROUND NUT PLATE HOLES LBL 45 TO RBL 25 WL 200, A 2.2 BY .9 BY .125 AREA OF THE LOWER FLANGE AT LBL 16 WAS FOUND TO BE OUT OF LIMITS PER SRM 53-10-1. A STANDASDR 99ZZZM518Floorbeam · corrodedDV INSPECTION FLOORBEAMS AND SUPPORT STRUCTURE FRAME 12 TO 18 W/VEST FLOOR PANELS ONLY REMOVED SII. REPORT FINDINGS FORM M046 (SII 53-10-128) ACCESS 221DF, 221EF, 221FF, 221HF222AF. PERFORMED DV INSPECTION FLOORBEAMS AND SUPPORT STRUCTURE FRAME 12-18, FOUND SDR CALA9800651Floorbeam · corrodedINSPECTION FOUND FLOORBEAM CORRODED AT STA 1070, RBL 20 TO 60. THE CORRODED SECTION OF FLOORBEAM WAS REMOVED. A REPAIR WAS FABRICATED AND INSTALLED IAW SRM 53-10-8, FIGURE 3.SDR CALA9800650Floorbeam · corrodedINSPECTION FOUND FLOORBEAM CORRODED AT STA 1110, RBL 0 TO 60. A REPAIR WAS FABRICATED AND INSTALLED IAW SRM 53-10-8, FIGURE 3.SDR SWIA971187Beam · corrodedCAPS FOR CROSSBEAMS FORWARD AND AFT OF LAVATORY HAVE CORROSION. REMOVED AND REPLACED T-SECTIONS ON FORWARD AND AFT OF LAVATORY CROSSBEAMS IAW SRM 51-40-02.SDR SWA980573Floorbeam · corrodedDURING SCHEDULED D-CHECK, FOUND CORRODED FLOORBEAM AT BS 312, WL 207, LBL 14. REPAIRED PER BOEING SRM.SDR SWA980569Floorbeam · crackedDURING SCHEDULED D-CHECK, FOUND CRACKED FLOORBEAM STIFFENER AT BS 328, RBL 33, WL 200. REPAIRED PER BOEING SRM.SDR SWA980568Floorbeam · crackedDURING SCHEDULED D-CHECK, FOUND CRACKED FLOORBEAM L-ANGLE AT BS 328 LBL 45 WL 207. REPAIRED PER BOEING SRM.SDR DL72S980785Floorbeam · corrodedTHE UPPER CAP OF THE FS 1110 PASSENGER FLOORBEAM WAS FOUND CORRODED. A SECTION OF THE CAP WAS CUT OUT BETWEEN RBL 12 AND LBL 12. THE CAP WAS REPAIRED WITH A FILLER SECTION AND FOUR SPLICE ANGLES PER ER/A 364205-14, REV A.SDR 980407Floorbeam · corrodedPIT - DURING Q-1 CHECK, FOUND CORROSION 8 FT LONGERON FLOORBEAM ON SEAT TRACK BL 600R JUST AFT OF P-SPLICE STATION 6030. REPAIRED BEAM, BEYOND PRODUCTION SPLICE, EXTENDED 39 IN AFT TO STATION 7300 WHERE NEW PRODUCTION SPLICE WAS MADE PER E0 49367. MODIFIED PSDR CALA9800630Floorbeam · corrodedINSPECTION FOUND LOWER CAP OF FLOORBEAM CORRODED AT FS 1070 FROM LBL 39 TO RBL 48. THE LOWER CAP WAS CUT OUT, L-ANGLES, FILLER AND A STRAP WERE FABRICATED AND INSTALLED IAW SRM 53-10-8, FIGURE 8.SDR CALA9800628Floorbeam · corrodedINSPECTION FOUND LOWER CHORD OF FLOORBEAM CORRODED AT STA 1130, RBL 0 TO RBL 60. A REPAIR WAS FABRICATED AND INSTALLED IAW ECRA 5310-03707.SDR SWAA980497Floorbeam · corrodedDURING SCHEDULED 1/4 D-CHECK, FOUND FLOORBEAM CORROSION AT BS 770, AT RBL 3. REPAIRED PER BOEING SRM.SDR SWAA980496Floorbeam · corrodedDURING SCHEDULED 1/4 D-CHECK, FOUND FLOORBEAM CORROSION AT BS 770, AT RBL 3. REPAIRED PER BOEING SRM.SDR C2XA98IA108Floorbeam · corrodedIAH - DURING C-CHECK INSPECTION, THE FLOORBEAM AT FRAME 39 WAS FOUND TO BE CORRODED. MAINTENANCE REPAIRED THE FLOORBEAM IAW CONTINENTAL EXPRESS ENGINEERING CHANGE AND REPAIR AUTHORIZATION EC5310-01037, AND THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE. (M)SDR C2XA98IA104Floorbeam · corrodedIAH - DURING C-CHECK INSPECTION, THE FLOORBEAM AT FRAME 38 WAS FOUND TO BE CORRODED ON THE RIGHT SIDE. MAINTENANCE REPAIRED THE AFFECTED PORTION OF FLOORBEAM USING A SPLICE REPAIR IAW ATR42 SRM 53-61-40, AND THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE. (SDR C2XA98IA103Floorbeam · corrodedIAH - DURING C-CHECK INSPECTION, THE FLOORBEAM UNDER PANEL 211JF WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED AND REPLACED THE AFFECTED FLOORBEAM IAW ATR 42 SRM 51-25-02 AND THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE. (M)SDR SWAA980492Floorbeam · corrodedDURING SCHEDULED D-CHECK, FOUND FLOORBEAM CORROSION AT BS 294.5, RBL 1 TO LBL 1, WL 208. REPAIRED PER BOEING SRM.SDR F3LA98011Floorbeam · corrodedDURING C-CHECK, MAINTENANCE REPORTED CORROSION ON UPPER CHORD BS 328 FLOORBEAM, LBL 30-4, WL 208. MAINTENANCE REMOVED DAMAGED SECTION OF BS 328 BEAM UPPER CHORD FROM LBL 28 TO LBL 65. FABRICATED REPAIR PARTS AND INSTALLED WET WITH FASTENERS PER SRM 53-10-9, SDR 9807426718Floorbeam · crackedDURING PERIODIC CHECK, FOUND A CRACK IN A UPPER DECK FLOORBEAM UPPER CHORD FASTENER HOLE AT THE FUSELAGE FRAME FS 360, RIGHT SIDE. REPAIRED PER EA 67-121410.SDR 9807416718Floorbeam · crackedDURING PERIODIC CHECK, FOUND A CRACK IN 2 UPPER DECK FLOORBEAM UPPER CHORD FASTENER HOLES AT THE FUSELAGE FRAME FS 340, LEFT SIDE. REPAIRED PER EA 67-121410.SDR 9807406718Floorbeam · crackedDURING PERIODIC CHECK, FOUND A CRACK IN A UPPER DECK FLOORBEAM UPPER CHORD FASTENER HOLE AT THE FUSELAGE FRAME FS 380, RIGHT SIDE. REPAIRED PER EA 67-121410.SDR 9807396718Floorbeam · crackedDURING PERIODIC CHECK, FOUND A CRACK IN 2 UPPER DECK FLOORBEAM UPPER CHORD FASTENER HOLES AT THE FUSELAGE FRAME FS 500, RIGHT SIDE. REPAIRED PER EA 67-121410.SDR UPS98826501Floorbeam · corrodedINSPECTION TYPE:D, F/S 717 FLOORBEAM RT SIDE RBL 35 UPPER CAP CORROSION REMOVAL BEYOND LIMITS. REPAIRED IAW DHC SK-803-786.SDR UPS98826489Floorbeam · corrodedINSPECTION TYPE:D, F/S 880 FLOORBEAM NUT PLATE HOLES CORRODED RBL 5 TO RBL 35. REPAIRED IAW DHC SK-803-780.SDR RRXA98184Floorbeam · corrosionDURING A MAINTENANCE VISIT, FOUND CORROSION DAMAGE TO FLOORBEAM AT STA 1726.656 AND BL 20 RIGHT. REMOVED DAMAGED SECTION, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED SPLICE REPAIR IAW FAA APPROVED DER TIMCO ENGINEERING SKETCH REO-04549.SDR AALA980676Floorbeam · corrodedTUL - FOUND TOP FLANGE OF FLOORBEAM CORRODED, (PREVIOUSLY REPAIRED) STATION 380. REMOVED AND REPLACED TO TOP CAP OF (PREVIOUSLY REPAIRED) UPPER FLANGE REPAIR PER SRM 53-10-8. (M)
Back to JASC 5315