JASC 5320

Service difficulty reports · 216,415

Reports filed under 5320 · Fuselage Miscellaneous Structure, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5320'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR AALA2019042409012Floor Support · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR BEAM BETWEEN FR 64 AND FR 66 AT -Y765. REPLACED FLOOR BEAM PER SRM 51-72-11.Mar 28, 2019 · N820AW · Airbus A319132SDR AALA2019042439018Floor Support · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR BEAM BETWEEN FR 64 AND FR 67 AT -Y465. REPLACED FLOOR BEAM PER SRM 51-72-11.Mar 28, 2019 · N820AW · Airbus A319132SDR SWAA2019041631772Fitting · corrodedGIRT BAR FITTING ATTACH POINT CORRODED AT BS. 344, LBL 59. R&R FITTING ATTACH POINT PER SRM.Mar 28, 2019 · N278WN · Boeing 7377H4SDR SWAA2019041531698Floor Support · crackedPASSENGER CABIN CRACKED FLOOR PANEL SUPPORT CRACKED AT BS. 540, LBL 1. R&R SUPPORT IAW SRM AND DWG.Mar 28, 2019 · N278WN · Boeing 7377H4SDR SWAA2019041531697Floor Support · crackedFLOOR PANEL SUPPORT CRACKED AT BS. 540, RBL 26. / R&R FLOOR PANEL SUPPORT IAW SRM AND DWG.Mar 28, 2019 · N278WN · Boeing 7377H4SDR SWAA2019041131606Angle · crackedAFT CARGO BAY, AFT BULKHEAD LOWER BULKHEAD CLIP CRACKED AT BS. 947, LBL 10. /R&R CLIP IAW SRM.Mar 28, 2019 · N280WN · Boeing 7377H4SDR SWAA2019041131605Gusset · crackedAFT CARGO BAY LAV BULKHEAD GUSSET CRACKED ON LOWER END AT BS. 867, LBL 11. R&R GUSSET IAW SRM.Mar 28, 2019 · N280WN · Boeing 7377H4SDR AALA201904119021Floor Support · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT GALLEY FLOOR BEAM BETWEEN FR 68 AND FR 69 AT +Y1162.5. REPLACED FLOOR BEAM PER SRM 51-42-11 AND 51-72-11.Mar 28, 2019 · N176UW · Airbus A321211SDR AALA201904109026Floor Support · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT GALLEY FLOOR BEAM BETWEEN FR 64 AND FR 66 AT +Y1292. REPLACED FLOOR BEAM PER SRM 51-72-11.Mar 28, 2019 · N820AW · Airbus A319132SDR AALA201904109025Floor Support · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON AFT GALLEY FLOOR BEAM BETWEEN FR 64 AND FR 66 AT -Y1292. REPLACED FLOOR BEAM PER SRM 51-72-11.Mar 28, 2019 · N820AW · Airbus A319132SDR REXA2019040828383Channel · bentCARGO LOWER SURROUND FRAME 574.0 LOWER U-CHANNEL SUPPORT IS BENT AND POSSIBLY CRACKED AT AFT RIVET LOCATION. REMOVED AND REPLACED U-CHANNEL SUPPORT AT CARGO LOWER SURROUND FRAM 574-08 IAW CRJ 200 SRM 51-42-16. AAR R SM 4Mar 28, 2019 · N8683B · Cndair CL6002B19SDR REXA2019040838378Intercostal · corrodedINTERCOSTAL FS364 TO 349 CORRODED STR 26R REMOVED CORRODED INTERCOASTAL AND REPLACED WITH NEW INTERCOASTAL IAW CRJ 200 SRM 51-42-06 51-42-21 OPS CHECKS GOOD IAW CRJ 200 AMM 52-70-08 AND 34-54-04-720-801 AAR SM 58Mar 28, 2019 · N8683B · Cndair CL6002B19SDR AALA201904089030Floor Support · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FORWARD GALLEY FLOOR BEM BETWEEN FR 12 AND FR 24 AT -Y765. REPLACED FLOOR BEAM PER SRM 51-72-11.Mar 28, 2019 · N820AW · Airbus A319132SDR AALA201904089029Floor Support · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON FLOOR BEAM BETWEEN FR 12 AND FR 24 AT -Y254. REPLACED FLOOR BEAM PER SRM 51-72-11.Mar 28, 2019 · N820AW · Airbus A319132SDR ASAA2019040588889Floor Support · crackedINTERCOSTAL STA 312 TO 328 LBL45 IS CRACKED AT FASTENER HOLE. GROUNDED - YES. REMOVED CRACKED INTERCOSTAL AND REPLACED WITH NEW INSTERCOSTAL IAW B737 800 SRM 51 40 02 0G 0.Mar 28, 2019 · N585AS · Boeing 737890SDR ASAA2019040588885Floor Support · corrodedFLOOR SUPPORT STA 947 TO 967 LBL16 HAS CORR. GROUNDED - YES. REMOVED AND REPLACED FLOOR SUPPORT IAW B737 800 SRM 51 40 02 0G 0 W 2 O .080 R .062 L 2 D .018.Mar 28, 2019 · N585AS · Boeing 737890SDR SIMA2019040432804Support · crackedCARGO DOOR HOLD OPEN SUPPORT REINFORCEMENT AT FRAME 68 STRINGER 15L HAS 2 CRACKS. (1 INCH IN LENGTH TOTAL)-C/A-REPLACED SUPPORT REINFORCEMENT IAW SRM 51-40-02Mar 28, 2019 · N941LT · Emb EMB145LRSDR SWAA2019040431381Web · corrodedAFT CARGO BAY ON VERTICAL WEB CORRODED BETWEEN BS. 767 TO BS. 787, RBL 6. / R&R WEB PER SRM AND DWG.Mar 28, 2019 · N407WN · Boeing 7377H4SDR ASAA2019040328872Channel · corrodedL2 MOPSILL HAS CORR. GROUNDED - YES. REMOVED AND REPLACED L2 MOPSILL IAW B737 800 SRM 51 40 02 0G 0 W 2 O .080 R .061 L 6 D .019.Mar 28, 2019 · N585AS · Boeing 737890SDR ASAA2019040388864Floor Support · corrodedFLOOR SUPPORT STA 947 TO 967 RBL 16 HAS CORR. GROUNDED - YES. REMOVED AND REPLACED FLOOR SUPPORT IAW B737 800 SRM 5 40 02 0G 0 W 1 O .080 R .067 L 2 D. 013.Mar 28, 2019 · N585AS · Boeing 737890SDR SWAA2019040331304Support Angle · corrodedSHIELD SUPPORT ANGLE CORRODED AT BS 775, RBL 20.5. R&R ANGLE IAW SRM AND DWG.Mar 28, 2019 · N408WN · Boeing 7377H4SDR SIMA201904013Intercostal · crackedNLG FORWARD INTERCOSTAL CRACKED-C/A-REPLACED INTERCOSTAL IAW SRM 51-40-02.Mar 28, 2019 · N941LT · Emb EMB145LRSDR DALA201904012069Floor Support · corrodedSHIP 6708 INITIAL INSPECTION- CRACK STRINGER FLOOR SUPPORTAT AFT CARGO COMPARTMENT BTW FRAME 1460-1480 RBL-11. CORRECTIVE ACTION: SUMMARY IN REF NRC 00237: TWO CRACKS WERE FOUND DAMAGED AREA WAS TRIMED OUT ON STRINGER FLOOR SUPPORT AT AFT CARGO BTW STA Y=1460-Mar 28, 2019 · N6708D · Boeing 757232SDR AALA20190328001Angle · corrodedAIRCRAFT IN BASE MAINTENANCE: CORROSION ON R1 DOOR CUTOUT CREASE ANGLE BETWEEN BS 259.5 AND BS 360. REPLACED CREASE ANGLE PER AARD 51-00-05-1.Mar 28, 2019 · N961AN · Boeing 737823SDR UIEA2019032903707Structure · corrodedCORROSION - FWD CARGO FOUND WALL CURTAIN STRUCTURE AT STA 980 RBL 96 LBL 96(<P>REMOVE DAMAGE PART IAW SM 51-40-02 REV.85</P><P>2. INSTALL NEW PART IAW SRM 51-00-02 REV.85 AND DWG NO. 453M1563 SH11 REV.B 453U1183 SH3 REV.B</P><P>3. JOB COMPLETED AND CONDITION Mar 28, 2019 · N492MC · Boeing 74747UFSDR UIEA2019032903695Shear Web · corrodedREPAIR - SEVERE CORROSION ON THE SHEAR WEBS OF MAIN DECK CARGO CENTER GUIDE RESTRAINT(<P>1. REMOVE DAMAGED PARTS IAW SRM 51-40-02 REV.85 2. ACCOMPLISHED DAMAGE WEB REPAIR IAW EI NR T2019A53M-1132 REV.1 3. INSTALL WEB IAW DWG NO 65B38403 SH1 REV.B AND SRM 51Mar 28, 2019 · N492MC · Boeing 74747UFSDR SWAA2019032931167Attach Angle · crackedAFT CARGO LT ATTACH ANGLE CRACKED AT BS 867, LBL 12. R&R ANGLE PER SRM.Mar 28, 2019 · N7745A · Boeing 7377BDSDR DALA2019032901984Fitting · crackedCRACK ON FITTING STA Y=737 AND X=44 BELOW SEAT TRACK AT WING BOX. NRC 00343: FITTING STA Y=737 AND X=44 WAS REPLACED PER SRM 51-41-05. (LP #1006757)Mar 28, 2019 · N940AT · Boeing 717200SDR VNAA2019032899901Door Sill · corrodedALT CARGO DOOR SILL CORRODED ON AFT END, UPPER SURFACE. REPLACED AFT CARGO BAY DOOR TOWER SILL.Mar 28, 2019 · N546FF · Cndair CL6002C10SDR SWAA2022030426412Strap · corrodedAFT CARGO BAY TENSION STRAP IN DOOR WAY HAS CORROSION BS807 RBL21 WL156 / FOUND AFT CARGO BAY TENSION STRAP OUT OF LIMITS PER SRM 53-60-15-1A-1. REMOVED AND REPLACED TENSIONS STRAP BS 767+7' - BS 847+14' RBL21 WL156 PER SRM 51-40-02-0G-0; SRM 51-40-05-0G-0; DWMar 27, 2019 · N280WN · Boeing 7377H4SDR SWAA2022030426413Strap · corrodedAFT CARGO BAY FLOOR SPLICE STRAP AT BS767+6 HAS CORROSION AT RBL10 TO LBL10 WL156 / RECEIVED NEW ACB FLOOR SPLICE STRAP FOR B.S. 767+6 ON PO# 717082 NEW PART WILL BE INSTALLED ON CUST. CARD #JPANEL-141-CLOSEMar 27, 2019 · N280WN · Boeing 7377H4SDR SWAA2022030445934Strip · crackedAFT CARGO ATTACH CAP STRIP FOR FLOOR PANEL 140AF CRACKED / RECEIVED NEW CAP STRIP FOR AFT CARGO FLOOR PANEL 140AF P/N 453A2611-12 A TAG # A33577 IAW AIC 25-52-10-02 IT. 35Mar 27, 2019 · N8612K · Boeing 7378H4SDR CA190329029Floor Support · corroded(CAN) OPERATOR REPORTED (6) BLENDED CORROSION AREAS ON THE FLOOR SILL (DWG: 601R31133, 0.063 NOMINAL THICKNESS, REF) BETWEEN FS559.00+L6 AND FS559.00+48, RHS. DIMENSIONS ARE: ITEM #1: 6.0 L X 1.5 W X REMAININIG THICKNESS 0.062 ITEM #2: 4.0` L X 1.5 W X REMAIMar 27, 2019 · Cndair CL6002B19SDR REXA2019060470772Plate · corrodedWR; [ TASK R53520 STEP 7 ]; INITIAL INSPECTION: CORROSION ON PROTECTION PLATE SUPPORT IN STA. FS= 322 BETWEEN 41RBL TO 4RBL AT GALLEY SERVICE DOOR LOWER SILL, FWD WET AREA. (W1) (CPAX) LEVEL CORROSION 2; PROTECTION PLATE SUPPORT IN STA. FS= 322 BETWEEN 41 RBMar 27, 2019 · N922 · Cndair CL6002D24SDR SWAA2019051732774Support · corrodedAFT CARGO BAY FLOOR TO SIDEWALL SUPPORT CORRODED BETWEEN BS. 727B TO BS. 767, RBL 21. REPAIRED SUPPORT IAW SRM & DWG.Mar 27, 2019 · N436WN · Boeing 7377H4SDR SWAA2019051432661Support · corrodedAFT CARGO BAY FLOOR TO SIDEWALL SUPPORT CORRODED BETWEEN BS. 867 TO BS. 947, RBL 21. R&R SUPPORT PER SRM & DWG.Mar 27, 2019 · N436WN · Boeing 7377H4SDR SWAA2019051432660Support · corrodedAFT CARGO BAY FLOOR TO SIDEWALL SUPPORT CORRODED BETWEEN BS. 727 TO BS. 817, LBL 21. R&R SUPPORT PER SRM AND DWG.Mar 27, 2019 · N436WN · Boeing 7377H4SDR SWAA2019051432610Threshold · corrodedAFT CARGO BAY SUB WEB THRESHOLD CORRODED BETWEEN BS. 794 TO BS. 827, RBL 25. R&R THRESHOLD IAW SRM & DWG.Mar 27, 2019 · N436WN · Boeing 7377H4SDR SWAA2019051432609Support · corrodedFORWARD CARGO BAY AFT BULKHEAD CENTER PANEL LOWER SUPPORT CORRODED AT BS. 500D, BETWEEN LBL 23 TO RBL 23. R&R SUPPORT IAW SRM AND DWG.Mar 27, 2019 · N436WN · Boeing 7377H4SDR SWAA2019051432608Support · corrodedFORWARD CARGO BAY FLOOR TO SIDEWALL SUPPORT CORRODED BETWEEN BS. 492 TO BS. 500A, RBL 23. R&R SUPPORT PER SRM & DWG.Mar 27, 2019 · N436WN · Boeing 7377H4SDR SWAA2019051432607Support · corrodedFORWARD CARGO BAY FLOOR TO SIDEWALL SUPPORT CORRODED BETWEEN BS. 420 TO BS. 440, RBL 23. R&R SUPPORT IAW SRM AND DWG.Mar 27, 2019 · N436WN · Boeing 7377H4SDR SWAA2019051432606Support · corrodedFORWARD CARGO BAY FLOOR TO SIDEWALL SUPPORT CORRODED BETWEEN BS. 400 TO BS. 500D, LBL 23. R&R SUPPORT IAW SRM AND DWG.Mar 27, 2019 · N436WN · Boeing 7377H4SDR SWAA2019051432587Shield · corrodedAFT CARGO BAY FLOOR TO SIDEWALL SUPPORT CORRODED BETWEEN BS. 767 TO BS. 794, RBL 21. R&R SHIELD IAW SRM & DWG.Mar 27, 2019 · N436WN · Boeing 7377H4SDR SWAA2019050732340Support · corrodedAFT CARGO BAY AFT BULKHEAD CENTER PANEL LOWER SUPPORT CORRODED AT BS. 947, BETWEEN LBL 21 TO RBL 21. R&R SUPPORT IAW DWG & SRM.Mar 27, 2019 · N436WN · Boeing 7377H4SDR SWAA2019050732339Support · corrodedAFT CARGO BAY FLOOR TO SIDEWALL SUPPORT CORRODED BETWEEN BS. 847 TO BS. 867, RBL 21. R&R SUPPORT IAW SRM AND DWG.Mar 27, 2019 · N436WN · Boeing 7377H4SDR SWAA2019050732338Support · corrodedFORWARD CARGO BAY FLOOR TO SIDEWALL SUPPORT CORRODED BETWEEN BS. 500A TO BS. 500D, RBL 23. R&R SUPPORT IAW SRM AND DWG.Mar 27, 2019 · N436WN · Boeing 7377H4SDR ASAA2019032979147Web · corrodedMAIN CABIN FLOOR @ FR69-FR68 R/H OUTBOARD CUSP WEB CORRODED GROUNDED - YES. BLENDED CORROSION AND FOUND OUT OF LIMITS IAW A320 SRM 53-41-14. ORIG .063 REMOVED .057 REMAINING .006. LOCATED AND DRILLED NEW WEB IAW A320 SRM 51-42-11. INSTALLED NEW WEB IAW A320 SMar 27, 2019 · N632VA · Airbus A320214SDR SWAA2019042631893Shield · corrodedAFT CARGO BAY R/H SHIELD AFT OF CARGO DOOR HAS AREAS OF CORROSION BS 8477 TO BS867 RBL 23, WL156 / REMOVED AND REPLACED SHIELD PER SRMMar 27, 2019 · N280WN · Boeing 7377H4SDR ASAA2019042372998Door Sill · corrodedAFT PASSENGER/CREW RT/SIDE DOOR LOWER FWD GIRT BAR FITTING CORRODED. GROUNDED - YES. REMOVED CORROSION IAW A320 SRM 53-41-14-283-002. ORIG MAT .098, REMAINING MAT .069 MAT LOSS OF .029. REPAIRED AREA IAW A320 SRM 53-41-14-300-001. THIS IS A CATEGORY A REPMar 27, 2019 · N632VA · Airbus A320214SDR ASAA2019042372989Floor Support · corrodedMAIN CABIN FLOOR @FR68 RBL30 BEAM UPPER SURFACE CORRODED GROUNDED - YES. REMOVED CORROSION OUT OF SRM 53-00-14 LIMITS - DAMAGE WAS 2" LONG - ORIG THK .150", REMAINING THK .130" REMOVED .020 ", REMOVED DAMAGED BEAM BETWEEN FR67-FR70 @ Y-765, LOCATED, DRILLED ANMar 27, 2019 · N632VA · Airbus A320214
Back to JASC 5320