What it covers
For specific reports of spars/ribs on the horizontal stabilizer.
Service difficulty reports · 6,445
Reports filed under 5511, newest first.
| 1995 | 86 |
|---|---|
| 1996 | 74 |
| 1997 | 81 |
| 1998 | 71 |
| 1999 | 54 |
| 2000 | 109 |
| 2001 | 81 |
| 2002 | 62 |
| 2003 | 63 |
| 2004 | 81 |
| 2005 | 84 |
| 2006 | 115 |
| 2007 | 113 |
| 2008 | 125 |
| 2009 | 66 |
| 2010 | 37 |
| 2011 | 139 |
| 2012 | 236 |
| 2013 | 259 |
| 2014 | 296 |
| 2015 | 439 |
| 2016 | 329 |
| 2017 | 295 |
| 2018 | 377 |
| 2019 | 575 |
| 2020 | 461 |
| 2021 | 415 |
| 2022 | 356 |
| 2023 | 219 |
| 2024 | 259 |
| 2025 | 305 |
| 2026 | 183 |
SDR JR2R20261012820Rib · crackedPANEL 335AL HAS CRACKED RIB. REPLACEDSDR FDEA202610121558Frame · corrodedRH ELEVATOR CONDUCTIVE FRAME MULTIPLE ZONES WITH CORROSION (UPPER AND LOWER) EVALUATED CONDUCTIVE FRAME RH ELEVATOR UPPER/LOWER HORIZONTAL STABILIZER AND REPLACED CONDUCTIVE SPLICE PLATE (02EA) AND SHIMS (02EA) UPPER/LOWER IAW B757 SRM 51-40-02-0G, SRM 55-SDR K11A2026101500398Rib · corrodedL/H HORIZONTAL STAB TRAILING EDGE RIB ELEV STA 66 HAS EVIDENCE OF CORROSION ON LOWER SURFACE
See all 6,445 reports