JASC 5753

Service difficulty reports · 31,521

Reports filed under 5753 · Trailing Edge Flaps, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5753'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR QXEA0201632Flap Track · wornPDX - LT NR 5 FLAP TRACK OUTBOARD SURFACE "E" HAS SMALL PITS ALONG BEARING RUN WEAR MARKS. REPAIRED IAW HORIZON AIR EA 2-57-200.Oct 4, 2002 · N368PH · Dhav DHC8202SDR AWXA200201024Flap Track · crackedDURING C-20 CHECK A 1/4 INCH CRACK WAS FOUND ON THE NR 7 FLAP TRACK AT THE INBOARD ROLLER OF UPPER TRACK, AFT END. MAINTENANCE REMOVED AND REPLACED THE DAMAGED NR 7 FLAP TRACK AT THE INBOARD ROLLER OF UPPER TRACK, AFT END IAW AWA T/C R3R27004.Oct 4, 2002 · N184AW · Boeing 737277SDR QXEA0201618Flap Track · corrodedPDX - LEFT HAND NR 4 FLAP TRACK INBOARD SURFACE IS PITTED, CONCENTRATED ON FORWARD 4 INCHES OF TRAVEL. REPAIRED IAW HORIZON AIR EA 2-57-199.Oct 4, 2002 · N368PH · Dhav DHC8202SDR F3LA200200314Skin · dentedDURING C-4 CHECK, INSPECTION REPORTED L/E OF LT OTBD MID T/E FLAP DENTED AND GOUGED AT OTBD ACTUATOR. FABRICATED AND INSTALLED DOUBLER PER SRM 57-53-01, SOPM 20-41-02 AND SOPM 20-42-01.Oct 4, 2002 · N578US · Boeing 737301SDR F3LA200200313Angle · looseDURING C-4 CHECK, INSPECTION REPORTED RT WING INBD TE PLATE LOOSE FASTENERS ON MID FLAP. FABRICATED AND INSTALLED REPLACEMENT ANGLE PER SRM 51-30-01, FIGURE 7 AND 51-40-02.Oct 4, 2002 · N578US · Boeing 737301SDR AWXA200201045Skin · wornMCN - MAJOR REPAIR - DURING C-17 CHECK A WORN AREA WAS FOUND ON THE L/H WING MID FLAP AT THE TOP INBOARD END, WBL 73. MAINTENANCE CUTOUT DAMAGED AREA OF L/H WING MID FLAP AT THE TOP INBOARD END WBL 73; FABRICATED A PLATE, 2 EACH DOUBLERS, AND A FILLER; BONDED Oct 3, 2002 · N324AW · Boeing 737301SDR ASAA0210211Skin Panel · gougedPAE - DURING SCHEDULED C-CHECK, FOUND FORE FLAP LOWER LEADING EDGE SKIN PANEL AT WING STATION 505R GOUGED. BLENDED AND INSTALLED REPAIR PER SRM. (M)Oct 2, 2002 · N747AS · Boeing 7372X6CSDR ABXA020284Fitting · corrodedLT WING INBOARD TRAILING EDGE FLAP OUTBOARD HINGE FITTING ASSEMBLY BEARING BORE, HAD SURFACE CORROSION. THE CORROSION WAS FOUND ON THE SURFACE OF THE BORE, WHERE BEARING INSTALLS. REPAIRED AREA IAW REA B657-44910MR.Oct 2, 2002 · N794AX · Boeing 767200SDR AUS20021099Structure · corroded(AUS) LT AND RT TRAILING EDGE FLAPS SEVERELY CORRODED AT HINGE ATTACHMENT TO MAIN SPAR.Sep 30, 2002 · Piper PA25235SDR CA021001003Rib · worn(CAN) RIB EXTENSIONS ON FLAP ASSY'S ON BOTH LT & RT FLAPS WERE WORN BY THE RIVETS HOLDING THE FLAP TRACKS ON THE WING. THE WEAR WAS AS MUCH AS 50 PERCENT MATERIAL THICKNESS.THESE 4 RIB EXTENSIONS WERE REPLACED. SIMILAR WEAR ON THE INBOARD & OUTBOARD RIB EXTENSSep 30, 2002 · Cessna 550SDR QXEA0201587Skin · chafedPDX - THE LEFT TOP OUTBOARD FLAP HAS A 16 INCH CHAFF THROUGH THE PAINT. MAINTENANCE BLENDED AND REPAIRED THE FLAP IAW E.A. 6-57-65, AND RD8/4-57-016.Sep 29, 2002 · N409QX · Bombdr DHC8401SDR ASAA0210198Skin · chafedPAE - DURING SCHEDULED C-CHECK, FOUND LEADING EDGE OF OUTBOARD FORE FLAP AT LEFT WING STATION 495-499 CHAFED. FABRICATED REPAIRS TO FLAP PER SRM. (M)Sep 28, 2002 · N747AS · Boeing 7372X6CSDR DHL2002803513Skin · crackedRT WING O/B FLAP UPPER SKIN CRACKED 1/2 INCH AT XW 212. PREFORMED MAJOR REPAIR PER SRM 57-1-0 PG 1. REMOVED DAMAGED SKIN PER SRM 51-1-21 PG 7. FABRICATED NEW SKIN (2024.T3.AL 0.40) PER SRM57-7-1 PG 2. CLEANED TREATED AND PRIMED PER SRM 51-1-8B.INSTALLED NEWSep 26, 2002 · N803DH · Doug DC873SDR DHL2002803500Support Bracket · crackedRT INBOARD FLAP CANOE FITTING LWR SUPPORT ANGLE AT STA. 97.000 WITH CRACK IN IT.R&R SUPPORT ANGLE PER M/M 27-51-12 PG 201-204, SRM51-3-1 PG A.Sep 26, 2002 · N803DH · Doug DC873SDR TSAA0253202Flap Track · damagedFLAP TRACK ATTACHMENT FITTING HOLE ELONGATED. REPAIRED AND AIRCRAFT RETURNED TO SERVICE.Sep 25, 2002 · N817AL · Boeing 7372X6CSDR ASAA0280326Skin · dentedOAK - C-CHECK, FOUND RIGHT WING INBOARD FLAP LOWER SURFACE HAS TWO DENTS. CUT OUT DAMAGED AREA AND INSTALLED DOUBLER PER SRM 57-01, PAGE 15 AND 51-30-2, PAGE 4. (M)Sep 23, 2002 · N953AS · Doug DC982SDR AWXA200200943Skin · crackedMCN - MAJOR REPAIR - DURING C-13 CHECK A 3/16" CRACK WAS FOUND ON THE L/H WING INBOARD HINGED FLAP UPPER SKIN AT THE R/H SIDE APPROXIMATELY 7" FROM THE TRAILING EDGE GOING FORWARD. MAINTENANCE TRIMMED OUT DAMAGED AREA ON HINGED FLAP UPPER SKIN; FABRICATED ANSep 22, 2002 · N187AW · Boeing 737277SDR QXEA0201577Skin · chafedCKB-LEFT HAND OUTBOARD FLAP HAS 2 CHAFED LINES ON TOP SKIN. REPAIRED IAW HORIZON AIR EA 6-57-62 AND WVAC EO DH8S-57-0570A.Sep 21, 2002 · N406QX · Bombdr DHC8401SDR XNOA01070Roller · failedAFTER T/O DURING FLAP RETRACTION OUTBOARD FLAPS WENT TO 2 DEGREES INBOARD FLAPS REMAINED AT 5 DEGREES. MX INSPECTION FOUND FAILED ROLLERS AT LEFT OUTBOARD FORE FLAP SEQUENCING CARRIAGE. REMOVED AND REPLACED ROLLERS. OPS CHECK GOOD IAW B727 MM 27-51-14 & 27-Sep 18, 2002 · N793A · Boeing 727227SDR UPS02239713Carriage · corrodedNR 8 FLAP CARRIAGE LEFT AFT DEAD WEIGHT ROLLER BRACKET BOLT HOLE IS CORRODED. CORROSION REMOVED IAW OHM 57-58-01. BUSHINGS FABRICATED AND INSTALLED IAW OHM 57-58-01. NR 8 FLAP CARRIAGE REPAIRED IAW OHM 57-58-01.Sep 17, 2002 · N930UP · Boeing 72722CSDR UPS02239712Carriage · corrodedNR 7 FLAP CARRIAGE AFT DEAD WEIGHT ROLLER BRACKET BOLT HOLE AND CARRIAGE SPINDLE BOLTS HOLE IS CORRODED. CORROSION REMOVED FOR BOLT HOLES IAW OHM 57-58-01. BUSHINGS FOR HOLES IN CARRIAGES FABRICATED IAW OHM 57-58-01. INSTALLED BUSHINGS IAW OHM 57-58-01. NRSep 17, 2002 · N930UP · Boeing 72722CSDR UPS02239711Carriage · corrodedNR 6 FLAP CARRIAGE SPINDLE BOLT HOLE AND UPPER AIR LOAD ROLLER BOLT HOLES ARE CORRODED. INSTALLED FABRICATED BUSHINGS IN CARRIAGE IAW SPOM 20-50-03. CORROSION REMOVED FROM HOLES IAW OHM 57-58-02. BUSHINGS FOR HOLES FABRICATED IAW OHM 57-58-02. NR 6 FLAP CASep 17, 2002 · N930UP · Boeing 72722CSDR UPS02239554Carriage · corrodedNR 3 FLAP CARRIAGE HAS EXCESSIVE CORROSION ON SPINDLE SHAFT SURFACE. NR 3 FLAP CARRIAGE REPLACED IAW MM 27-51-03.Sep 17, 2002 · N930UP · Boeing 72722CSDR UPS02239553Carriage · corrodedNR 1 FLAP CARRIAGE HAS EVIDENCE OF CORROSION IN SPINDLE BORE HOLE. NR 1 FLAP CARRIAGE REPLACED IAW MM 27-51-13.Sep 17, 2002 · N930UP · Boeing 72722CSDR UPS02239560Ballscrew · corrodedNR 4 BALLSCREW AND NUT ASSY ARE BADLY CORRODED AT YOKE ATTACH POINT. NR 4 BALLSCREW AND NUT ASSY REPLACED AS REQ`D IAW MM 27-51-36 AND OHM 57- 54-04.Sep 16, 2002 · N930UP · Boeing 72722CSDR SWIA200211232Flap · bird strikeRIGHT OUTBOARD FLAP DAMAGED BY BIRD STRIKE. REMOVED AND REPLACED RIGHT WING OUTBOARD FLAP ASSEMBLY IAW 27-53-00. OPS CHECK GOOD.Sep 15, 2002 · N446SW · Cndair CL6002B19SDR F3LA200200260Roller · out of rigFLIGHT CREW REPORTED A LOUD VIBRATION WAS HEARD UPON FLAP EXTENSION ON APPROACH THAT APPEARED TO BE COMING FROM RT SIDE OF AIRCRAFT. PERFORMED INSPECTION PER MM 05-51-67, NO ABNORMALITIES OR DISCREPANCIES NOTED. PERFORMED TEST FLIGHT. TEST FLIGHT UNSATISFACSep 13, 2002 · Boeing 737317SDR AWXA200200979Structure · contaminatedDURING C-06 CHECK X-RAY INDICATED MOISTURE WAS TRAPPED IN THE LT WING INBOARD AFT FLAP. MAINTENANCE REMOVED DAMAGED SKIN PLIES TO ACCESS HONEYCOMB; REMOVED DAMAGED AREA AND MOISTURE; REINSTALLED SKIN PER B757-200 SRM 51-70-04, PG. 4-31.Sep 12, 2002 · N907AW · Boeing 757225SDR SWAA022133Flap · delaminatedDURING SCHEDULED C3 CHECK, FOUND RT OTBD T/E AFT FLAP DELAMINATED. REMOVED AND REPLACED RT OTBD T/E AFT FLAP PER MM.Sep 12, 2002 · N637SW · Boeing 7373H4SDR QXEA0201446Flap Track · corrodedPDX- NR 4 FLAP TRACK INBOARD SIDE LOAD ROLLER TRACK PITTED. REPAIRED IAW HORIZON AIR EA 2-57-192.Sep 11, 2002 · N366PH · Dhav DHC8202SDR QXEA0201445Flap Track · corrodedPDX- NR 4 FLAP TRACK OUTBOARD SIDE LOAD ROLLER TRACK PITTED. REPAIRED IAW HORIZON AIR EA 2-257-192.Sep 11, 2002 · N366PH · Dhav DHC8202SDR QXEA0201444Flap Track · corrodedPDX- RIGHT HAND WING FLAP TRACK NR 4 HAS PITTING ON BOTH SIDES OF VERTICAL WEB TRACKS. REPAIRED IAW HORIZON AIR EA 2-57-193.Sep 11, 2002 · N366PH · Dhav DHC8202SDR QXEA0201443Flap Track · corrodedPDX- RIGHT HAND WING FLAP TRACK NR 4 HAS PITTING ON TOP HORIZONTAL WEB TRACK. REPAIRED IAW HORIZON AIR EA 2-57-193.Sep 11, 2002 · N366PH · Dhav DHC8202SDR SWIA200211214Guide · bentRIGHT OUTBOARD FLAP ROLLER GUIDE BENT. INSTALLED NEW BRACKET FOR INBOARD ROLLER, RT OUTBOARD FLAP MOVEABLE CHANNEL. OPERATED FLAPS. OPS CHECK GOOD AT THIS TIME.Sep 10, 2002 · N212SW · Emb EMB120ERSDR AWXA200200959Angle · crackedYVR - MAJOR REPAIR - DURING C-03 CHECK A 1" CRACK WAS FOUND ON THE L/H OUTBOARD MIDFLAP REAR SPAR TO RIB ATTACH ANGLE AT WBL 305.56. MAINTENANCE REMOVED L/H OUTBOARD MIDFLAP REAR SPAR TO RIB ATTACH ANGLE AT WBL 305.56. FABRICATED A NEW REPLACEMENT ANGLE, AND ISep 9, 2002 · N336AW · Boeing 737375SDR UPS02439389Panel · crackedINSPECTION TYPE:N/A LT WING OTBD MID T/E FLAP 4 FT CRACK ON TRAILING EDGE. INSTALLED COVE PANEL REF SRM 51-30-02.Sep 7, 2002 · N525UP · Boeing 747212BSDR AUS20021046Bolt · failed(AUS) RH INBOARD FLAP ELEPHANT MOUNTING PLATE BOLTS/ANCHOR NUTS FAILED. DURING FLAP RETRACTION AFTER TAKEOFF, THE ELEPHANT EAR DAMAGEDTHE WING/BODY FAIRING CAUSING A 304.8CM (12IN) CRACK IN THE COMPOSITE MATERIAL.Sep 6, 2002 · Boeing 737476SDR DL733021059Skin · delaminatedRT WING INBOARD MID FLAP WEDGE IS DISBONDED. REPAIR PER ER/A 417696-14.Sep 6, 2002 · N306WA · Boeing 737347SDR EVA2002091001Flap Track · corroded.DURING B-16603 C10 CHECK FOUND RT MAIN FLAP INBOARD TRACK BEAM FASTENER HOLE CORRODED.Sep 6, 2002 · N16603 · Boeing 767300SDR F3LA200200257Skin · damagedDURING C-5 CHECK, INSPECTION REPORTED 3 CREASES ON TOP SURFACE OF RIGHT INBOARD FOREFLAP. REMOVED, REPAIRED AND REINSTALLED RT INBOARD FOREFLAP PER MM 27-51-07, SRM 57-53-02 AND SRM 51-70-10.Sep 5, 2002 · N307FL · Boeing 73736QSDR DL733021057Wedge · damagedDAMAGE TO LT WING INBOARD MID FLAP WEDGE. REPAIR PER ER/A 417684-14.Sep 4, 2002 · N306WA · Boeing 737347SDR AUS20021049Flap Track · cracked(AUS) NO5 FLAP TRACK BEAM CRACKED ON THE AFT LOWER FLANGE. CRACK LENGTH APPROXIMATELY 38MM (1.5IN).Sep 3, 2002 · Boeing 737376SDR SWAA022027Flap · peelingDURING WALK AROUND INSPECTION, FOUND PREVIOUS REPAIR PEELING OFF AT LT T/E INBD FORE FLAP. REMOVED AND REPLACED LT T/E INBD FORE FLAP PER MM.Sep 3, 2002 · N348SW · Boeing 7373H4SDR SWAA022025Flap · crackedDURING SCHEDULED C1 CHECK, FOUND LT OTBD T/E MID FLAP CRACKED ON THE AFT SPAR UPPER CHORD. REMOVED AND REPLACED LT OTBD T/E MID FLAP PER MM.Sep 2, 2002 · Boeing 7372H4SDR ANZF2002Fitting · brokenAFTER DEPARTURE, THE RT INBOARD FORE FLAP ATTACH POINT FAILED. THE BROKEN (HALF ROUND) ATTACH PIECE WAS RECOVERED FROM THE CANOE BY MAINTENANCE. SUBSEQUENT VIBRATION AND FLUTTER CAUSED THE FLAP TO BREAK INTO THREE PIECES OF WHICH THE TWO THIRDS ON THE INBOARDSep 1, 2002 · Boeing 747400SDR AWXA200200942Skin · wornMCN - MAJOR REPAIR - DURING C-13 CHECK THE L/H WING INBOARD MID FLAP UPPER SURFACE WAS FOUND TO HAVE A WORN SPOT AT THE INBOARD EDGE. MAINENANCE CUTOUT WORN SPOT ON MID FLAP UPPER SURFACE; FABRICATED AN EXTERNAL DOUBLER, AND INSTALLED REPAIR PART IAW AWA E.R.Sep 1, 2002 · N187AW · Boeing 737277SDR SWAA022026Skin · delaminatedDURING SCHEDULED 1/4D CHECK, FOUND RT T/E INBD FORE FLAP DELAMINATED ON UPPER SKIN. REPAIRED SKIN PER SRM.Aug 31, 2002 · N663SW · Boeing 7373Q8SDR QXEA0201321Flap Track · corrodedPDX - PITTING ON INBOARD SIDE OF THE 4 FLAP TRACK ON RIGHT HAND WING. REPAIRED IAW HORIZON AIR EA 2-57-184.Aug 29, 2002 · N363PH · Dhav DHC8202SDR QXEA0201320Flap Track · corrodedPDX - PITTING ON THE OUTBOARD SIDE OF THE NR 4 FLAP TRACK ON RIGHT HAND WING. REPAIRED IAW HORIZON AIR EA 2-57-18.Aug 29, 2002 · N363PH · Dhav DHC8202SDR MWEA020521Wing · damagedLEFT OUTBOARD FLAP TRAILING EDGE DAMAGED AND AFT TRAILING EDGE CHANNEL. -- REMOVED AND REPLACED TRAILING EDGE.Aug 29, 2002 · N209ME · Doug DC932
Back to JASC 5753