Boeing 737-522

Service difficulty reports · 1,682

Newest first. General aviation reporting is voluntary.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE aircraft_model_key = '737522'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR 2002UALA00579Floorbeam · corrodedCABIN FLOORBEAM STATION 986 RIGHT HAND OUTBOARD WAS CORRODED WITH EXCESSIVE MATERIAL REMOVED. MAJOR REPAIR ACCOMPLISHED. CUT OUT DAMAGE, INSTALLED REPAIR ANGLE AND FILLERS.Mar 28, 2002 · N931UA · Boeing 737522 · Fuselage Main, Floor BeamSDR 2002UALA00564Bulkhead · crackedBODY STATION 178 WEB CRACKED AT WL 201 LBL 5 LOWER LT RADAR MOUNT INBOARD UPPER CORNER. MAJOR REPAIR ACCOMPLISHED, INSTALLED DOUBLER REPAIR.Mar 27, 2002 · N931UA · Boeing 737522 · Fuselage Main, BulkheadSDR 2002UALA00448Frame · buckledFORWARD PIT BODY FRAME IS BUCKLED AND MISDRILLED AT STATION 482B RBL 2 TO LBL 2. MAJOR REPAIR ACCOMPLISHED. MANUFACTURED AND INSTALLED REPAIR DOUBLER.Mar 14, 2002 · N929UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00428Skin · wornLEFT MIDFLAP UPPER SKIN HAS WEAR DAMAGE. MAJOR REPAIR ACCOMPLISHED. REMOVED DAMAGE. INSTALLED BONDED METAL FILLER AND DOUBLER.Mar 11, 2002 · N927UA · Boeing 737522 · Trailing Edge FlapsSDR 2002UALA00419Floorbeam · corrodedSTATION 986.5 FLOORBEAM RBL 18 TO RBL 39 CORRODED. MAJOR REPAIR ACCOMPLISHED. ACCOMPLISHED ANGLE REPAIR.Mar 11, 2002 · N930UA · Boeing 737522 · Fuselage Main, Floor BeamSDR 2002UALA00418Frame · damagedFOUR INCHES AFT OF STATION 188 WL 207 LEFT HAND CHORD HAS EXCESSIVE MATERIAL LOSS. MAJOR REPAIR ACCOMPLISHED. INSTALLED REPAIR ANGLE.Mar 11, 2002 · N929UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00417Frame · crackedLEFT HAND BODY STATION 188 FRAME CRACKED AT WL 207. MAJOR REPAIR ACCOMPLISHED. FABRICATED AND INSTALLED REPAIR ANGLE.Mar 11, 2002 · N929UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00367Skin · dentedEXTERNAL FUSELAGE SKIN IS DENTED AT STATION 937 STRINGER 20L + 9 INCHES. MAJOR REPAIR ACCOMPLISHED. INSTALLED DOUBLER REPAIR.Mar 8, 2002 · N929UA · Boeing 737522 · Fuselage Main, Plate/SkinSDR 2002UALA00378Rib · wornAT NR 2 AILERON HINGE CASTING, INBOARD SUPPORT RIB LOWER FLANGE, IS WORN IN RADIUS. MAJOR REPAIR ACCOMPLISHED. MANUFACTURED AND INSTALLED SUPPORT RIB.Mar 7, 2002 · N929UA · Boeing 737522 · AileronsSDR 2002UALA00343Floorbeam · corrodedCABIN FLOORBEAM STATION 986 RBL 43 UPPER CAP IS CORRODED. MAJOR REPAIR ACCOMPLISHED. INSTALLED FLOORBEAM UPPER CAP REPAIR ANGLE AND STRAP.Mar 4, 2002 · N929UA · Boeing 737522 · Fuselage Main, Floor BeamSDR 2002UALA00333Frame · crackedFUSELAGE FRAME CRACKED AT STATION 188 RIGHT HAND AT WL 207. MAJOR REPAIR ACCOMPLISHED. INSTALLED EXTERNAL FUSELAGE SKIN DOUBLERS.Mar 2, 2002 · N929UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00326Frame · crackedRIGHT HAND STATION 188 FRAME AT STRINGER 17R IS CRACKED. MAJOR REPAIR ACCOMPLISHED. ACCOMPLISHED DOUBLER REPAIR.Feb 28, 2002 · N928UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00325Floor Support · corrodedDOOR 2R FLOOR SUPPORT CORRODED AT STATION 340. MAJOR REPAIR ACCOMPLISHED. REPLACED FLOOR SUPPORT.Feb 28, 2002 · N928UA · Boeing 737522 · Fuselage Miscellaneous StructureSDR 2002UALA00324Skin · crackedFORWARD PIT CARGO DOOR OPENING AFT FRAME HAS A CRACK IN EDGE OF SKIN AT LOWER END ABOVE STRINGER 25R. MAJOR REPAIR ACCOMPLISHED. INSTALLED FILLER AND DOUBLER REPAIR.Feb 28, 2002 · N928UA · Boeing 737522 · Fuselage Main, Plate/SkinSDR 2002UALA00323Frame · crackedSTATION 188 FRAME AT STRINGER 17L IS CRACKED. MAJOR REPAIR ACCOMPLISHED. ACCOMPLISHED DOUBLER REPAIR.Feb 28, 2002 · N928UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00322Skin · corrodedFORWARD EXTERNAL SKIN AT NUMBER 2 VHF ANTENNA IS CORRODED. MAJOR REPAIR ACCOMPLISHED. REMOVED DAMAGE. ACCOMPLISHED DOUBLER REPAIR.Feb 28, 2002 · N928UA · Boeing 737522 · Fuselage Main, Plate/SkinSDR 2002UALA00302Bulkhead · crackedBODY STATION 178 BULKHEAD CRACKED AT OUTBOARD SIDE OF LEFT HAND UPPER RADAR MOUNT. MAJOR REPAIR ACCOMPLISHED. DOUBLER INSTALLED.Feb 24, 2002 · N929UA · Boeing 737522 · Fuselage Main, BulkheadSDR 2002UALA00276Frame · crackedFUSELAGE BODY STATION 188 RIGHT HAND FRAME OUTBOARD SIDE CHORD CRACKED AT WL 208. MAJOR REPAIR ACCOMPLISHEDINSTALLED DOUBLER.Feb 14, 2002 · N927UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00268Frame · crackedFUSELAGE BODY STATION 188 LEFT HAND FRAME OUTBOARD SIDE CHORD CRACKED AT WL 208. MAJOR REPAIR ACCOMPLISHED. DOUBLER REPAIR INSTALLED.Feb 13, 2002 · N927UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00247Frame · damagedFORWARD PIT BILGE FRAME AT STATION 440 RBL 23 HAS AREA .5 X .5 INCHES OF EXCESSIVE MATERIAL REMOVED ON WEB. MAJOR REPAIR ACCOMPLISH. REPAIR ANGLE INSTALLED.Feb 13, 2002 · N926UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00261Frame · dentedAFT CARGO PIT STATION 807 LBL 20 FRAME DENTED. MAJOR REPAIR ACCOMPLISHED. FABRICATED AND INSTALLED STRAP DOUBLER.Feb 11, 2002 · N926UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00260Skin · damagedLEFT HAND INBOARD SECTION OF HORIZONTAL STABILIZER LEADING EDGE 2 AREAS OF EXCESS MATERIAL LOSS MEASURED FROM INBOARD EDGE. 1ST DAMAGE 27 INCHES OUTBOARD. 2ND DAMAGE IS 32 INCHES OUTBOARD. MAJOR REPAIR ACCOMPLISHED. CUTOUT DAMAGE AND INSTALLED DOUBLER.Feb 11, 2002 · N926UA · Boeing 737522 · Horizontal Stabilizer, Plate/SkinSDR 2002UALA00248Bulkhead · damagedAFT PRESSURE DOME RBL 20 BELOW WEB IS NICKED. MAJOR REPAIR ACCOMPLISHED. INSTALLED RIVET AND PAINTED.Feb 9, 2002 · N927UA · Boeing 737522 · Fuselage Main, BulkheadSDR 2002UALA00237Frame · crackedLEFT HAND BODY STATION 188 FRAME CRACKED AT FLOOR LINE. MAJOR REPAIR ACCOMPLISHED. CRACK REPAIRED WITH ANGLE AND DOUBLER.Feb 7, 2002 · N926UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00176Floorbeam · gougedSTATION 312 FLOORBEAM UPPER CHORD GOUGED FROM BL 0 TO LBL 10. MAJOR REPAIR ACCOMPLISHED. REPAIR ANGLE AND STRAP INSTALLED.Feb 4, 2002 · N927UA · Boeing 737522 · Fuselage Main, Floor BeamSDR 2002UALA00160Skin · dentedEXTERNAL FUSELAGE SKIN DENT AT STATION 1010 STRINGER 12L. MAJOR REPAIR ACCOMPLISHED. REMOVED DAMAGE AND INSTALLED REPAIR DOUBLER.Jan 29, 2002 · N927UA · Boeing 737522 · Fuselage Main, Plate/SkinSDR 2002UALA00158Skin · dentedLEFT HAND LOWER FUSELAGE STATION 947, STRINGER 17L, SKIN IS DENTED. MAJOR REPAIR ACCOMPLISHED. ACCOMPLISHED DOUBLER REPAIR.Jan 28, 2002 · N924UA · Boeing 737522 · Fuselage Main, Plate/SkinSDR 2002UALA00157Frame · crackedBODY STATION 188, WL 209 LEFT HAND SIDE FRAME IS CRACKED. MAJOR REPAIR ACCOMPLISHED. ACCOMPLISHED FRAME REPAIR.Jan 28, 2002 · N924UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00156Skin · dentedFUSELAGE SKIN AT BODY STATION 845, STRINGER 21R TO 23R IS DENTED. MAJOR REPAIR ACCOMPLISHED. ACCOMPLISHED DOUBLER REPAIR.Jan 28, 2002 · N924UA · Boeing 737522 · Fuselage Main, Plate/SkinSDR 2002UALA00143Structure · puncturedPUNCTURE .5 INCH, IN LOWER RIGHT CORNER OF FORWARD CARGO DOOR. MAJOR REPAIR ACCOMPLISHED. CUT OUT DAMAGE, INSTALLED DOUBLER REPAIR.Jan 26, 2002 · N930UA · Boeing 737522 · Cargo/Baggage DoorsSDR 2002UALA00142Bulkhead · crackedSTATION 178 BULKHEAD CRACKS AT BL 0, WL 187 LBL 5, WL 198 RBL 6, WL 201. MAJOR REPAIR ACCOMPLISHED. REPAIR DOUBLER INSTALLED.Jan 26, 2002 · N926UA · Boeing 737522 · Fuselage Main, BulkheadSDR 2002UALA00141Module · faultyUNSCHEDULED LANDING DUE TO A RUDDER TRIM IRREGULARITY. REPLACED RUDDER TRIM ACTUATOR, AND RUDDER TRIM CONTROL MODULE. CHECKED WIRING FROM D3116 TO D2932. ALL WIRES CHECKED GOOD. RUDDER TRIM MODULE WAS CONFIRMED BAD IN THE SHOP. THE SWITCH HAD AN INTERNAL Jan 24, 2002 · N929UA · Boeing 737522 · Rudder Tab Control SystemSDR 2002UALA00134Crease Beam · crackedCABIN CREASE BEAM INNER CHORD OUTBOARD CLIP IS CRACKED AT BODY STATION 294 RBL 53 WL 208. MAJOR REPAIR ACCOMPLISHED.REPLACED CLIP.Jan 24, 2002 · N926UA · Boeing 737522 · Fuselage Main, Longeron/StringerSDR 2002UALA00084Frame · dentedFUSELAGE FRAME DENTED AT STATION 747 STRINGER 24R. MAJOR REPAIR ACCOMPLISHED. ACCOMPLISHED FRAME REPAIR. INSTALLED NEW SPLICE PLATE TO INCORPORATE DAMAGED AREA.Jan 13, 2002 · N925UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00078Skin · dentedLEFT HAND LOWER FUSELAGE STATION 907 STRINGER 17L SKIN DENTED. MAJOR REPAIR ACCOMPLISHED. INSTALLED DOUBLER AND FILLER.Jan 11, 2002 · N924UA · Boeing 737522 · Fuselage Main, Plate/SkinSDR 2002UALA00077Door Frame · damagedAFT CARGO DOOR CUTOUT AFT BEAM STATION 845 WEB CHAFED AND GOUGED. MAJOR REPAIR ACCOMPLISHED. INSTALLED DOUBLER.Jan 11, 2002 · N924UA · Boeing 737522 · Fuselage Main, StructureSDR 2002UALA00065Frame · crackedRIGHT HAND STATION 188 FRAME CHORD CRACKED AT WL 207. MAJOR REPAIR ACCOMPLISHED. MANUFACTURED AND INSTALLED FRAME DOUBLER AND SKIN DOUBLER.Jan 9, 2002 · N925UA · Boeing 737522 · Fuselage Main, FrameSDR 2002UALA00040Fan · faultyLANDED UNDER ALERT DUE TO ELECTRICAL SMELL IN CABIN. SUSPECTED RECIRCULATION FAN FAILURE. INSPECTED ALL CEILING/PSU/SIDEWALL LIGHTING, COFFEE MAKERS AND BOTH AIR CYCLE MACHINE OIL LEVELS, YET NO DISCREPANCIES ISOLATED. REPLACED RECIRCULATION FAN AS PRECAUTION.Jan 7, 2002 · N930UA · Boeing 737522 · Air Distribution FanSDR 2002UALA00007Crease Beam · corrodedCABIN STATION 312 TO 344 CREASE BEAM ANGLE AT FORWARD ENTRY DOOR IS CORRODED ADJACENT TO SCUPPER DRAIN. MAJOR REPAIR ACCOMPLISHED. REPLACED CREASE BEAM CHORD.Jan 3, 2002 · N925UA · Boeing 737522 · Fuselage Main, StructureSDR 2001UALA02481Skin · dentedFUSELAGE SKIN AND STRINGER DENTED AT STATION 479, STRINGER 5L. MAJOR REPAIR ACCOMPLISHED. FUSELAGE DOUBLER INSTALLED AND STRINGER REPAIRED.Dec 31, 2001 · N925UA · Boeing 737522 · Fuselage Main, Plate/SkinSDR 2001UALA02475Warning System · activatedENCOUNTERED A RUDDER CONTROL PROBLEM EN ROUTE TO DESTINATION. LANDED UNDER ALERT.Dec 28, 2001 · N941UA · Boeing 737522 · Rudder Control SystemSDR 2001UALA02459Stringer · dentedRIGHT HAND EXTERNAL FUSELAGE BODY STATION 226 STRINGER 19R DENTED 4 INCHES DIAMETER AND IS .075 INCH DEEP. MAJOR REPAIR ACCOMPLISHED. INSTALLED DOUBLER.Dec 24, 2001 · N922UA · Boeing 737522 · Fuselage Main, Longeron/StringerSDR 2001UALA02387Frame · crackedSTATION 188, WL 207, FUSELAGE RIGHT FRAME CHORD CRACKED IN RADIUS. MAJOR REPAIR ACCOMPLISHED, MANUFACTURED & INSTALLED REPAIR DOUBLERS.Dec 12, 2001 · N923UA · Boeing 737522 · Fuselage Main, FrameSDR 2001UALA02390Skin · dentedEXTERNAL FUSELAGE DENTED STATION 1008 STRINGER 11R. MAJOR REPAIR ACCOMPLISHED, REMOVED DAMAGE & INSTALLED DOUBLER.Dec 9, 2001 · N923UA · Boeing 737522 · Fuselage Main, Plate/SkinSDR 2001UALA02385Stringer · dentedCABIN STRINGER 13 LEFT AT STATION 1010 DENTED BETWEEN FASTENERS. MAJOR REPAIR ACCOMPLISHED, REINFORCED STRINGER SPLICE REPAIR.Dec 7, 2001 · N922UA · Boeing 737522 · Fuselage Main, Longeron/StringerSDR 2001UALA02379Skin · dentedLEFT HORIZONTAL STABILIZER LEADING EDGE, 8 FEET FROM INBOARD END, DENT BETWEEN RIBS. MAJOR REPAIR ACCOMPLISHED, DOUBLER REPAIR MANUFACTURED AND INSTALLED.Dec 6, 2001 · N923UA · Boeing 737522 · Horizontal Stabilizer, Plate/SkinSDR 2001UALA02372Skin · dentedFUSELAGE SKIN DENTED 8 INCHES LEFT OF LOWER CENTERLINE AT STATION 197. MAJOR REPAIR ACCOMPLISHED, SKIN DOUBLER INSTALLED.Dec 6, 2001 · N922UA · Boeing 737522 · Fuselage Main, Plate/SkinSDR 2001UALA02367Frame · crackedFUSELAGE FRAME CHORD AT STATION 188 AT WL 207 RIGHT HAND SIDE IS CRACKED IN RADIUS. MAJOR REPAIR ACCOMPLISHED, FRAME CHORD REPAIRED AND FUSELAGE DOUBLER INSTALLED.Dec 5, 2001 · N922UA · Boeing 737522 · Fuselage Main, FrameSDR 2001UALA02378Floorbeam · damagedFORWARD CABIN FLOORBEAM AT BODY STATION 328 RBL 48 HAS DAMAGE WHICH EXCEEDS .250 FROM EDGE OF FLOORBEAM UPPER CHORD. MAJOR REPAIR ACCOMPLISHED, STRAP REPAIR INSTALLED.Dec 4, 2001 · N922UA · Boeing 737522 · Fuselage Main, Floor BeamSDR 2001UALA02366Shear Tie · damagedSTATION 1006 SHEAR TIE BETWEEN STRINGER 11L AND 12L NICKED OUTSIDE RADIUS. MAJOR REPAIR ACCOMPLISHED, FABRICATED NEW SHEAR TIE AND REPAIRED.Dec 4, 2001 · N922UA · Boeing 737522 · Fuselage Main, Structure
Back to Boeing 737-522