Boeing 757-23A

Service difficulty reports · 1,397

Newest first. General aviation reporting is voluntary.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE aircraft_model_key = '75723A'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR 08FDEA04249Floorbeam · misalignedMAIN CABIN FLOORBEAM , BS 1600 LBL 25.45 HAS MISDRILLED HOLES. REMOVED DAMAGED AREA OF FLOOR , REMOVED STIFFENER, FABRICATED NEW PART, ANGLE SHIMS AND STRAPS IAW SRM 53-00-51. TREATED AND PRIMES NEW PARTS, INSTALLED FABRICATED PARTS IAW SRM 51-40-02. THIS IS AOct 6, 2008 · N918FD · Boeing 75723A · Fuselage Main, Floor BeamSDR 08FDEA04248Crease Beam · corrodedCREASE BEAM ANGLE FITTING ATTACHMENT AND CHORD HAS CORROSION AT S17R, BS 520-540. REMOVED AND REPLACED CREASE BEAM ANGLES, ANGLE SPLICES, AND O/B CHORD IAW MAE TRAVELERS T8/760009, T8/760007, T8/760010 AND EA F-5310-110929. THIS REPAIR IS CLASSIFIED AS A CATEGOct 6, 2008 · N920FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04204Floorbeam · corrodedCABIN FLOORBEAM BS 377.7 BL 0- LBL 62, CORRODED AT FASTENER HOLES. REMOVED CORROSION IAW SRM 51-10-02. FABRICATED ANGLES ON MAE TRAV T8/760222. FABRICATED STRAPS ON MAE TRAV T8/760223. INSTALLED REPAIR PARTS IAW SRM 53-00-51. MAJOR REPAIR.Oct 5, 2008 · N918FD · Boeing 75723A · Fuselage Main, Floor BeamSDR FDEA200810044198Seat Track · gougedMAIN CABIN, SEAT TRACK BS 900-BS- BS 1076, LBL 24.75 CROWN SCRATCHES AND GOUGED REMOVED AND REPLACED SEAT TRACK STA 900-1076, LBL 24.75 IAW SRM 51-40-02 AND SRM 53-00-52, MAJOR REPAIR NO FOLLOW-UP REQUIRED.Oct 4, 2008 · N918FD · Boeing 75723A · Fuselage, Seat/Cargo Attach FittingsSDR 08FDEA04198Seat Track · damagedMAIN CABIN, SEAT TRACK BS 900-1076 LBL 24.75 CROWN SCRATCHES AND GOUGED REMOVED AND REPLACED SEAT TRACK IAW SRM 51-40--02 AND SRM 53-00-52, MAJOR REPAIR NO FOLOW-UP REQUIRED.Oct 4, 2008 · N918FD · Boeing 75723A · Fuselage, Seat/Cargo Attach FittingsSDR FDEA200810034196Crease Beam · corrodedCREASE BEAM WEB FROM STA 600-620 RBL 65 HAS CORROSION ON UPPER SURFACE. R & R WEB AND ANGLE, BS 600-620, RBL 65, TRAVELER T8/761895 AND T8/758987 IAW SRM 51-40-02 DWG 143N5520. THIS IS CLASSIFIED AS A CATEGORY "A" MAJOR REPAIR.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR FDEA200810034192Crease Beam · corrodedCREASE BEAM RT SIDE HAS SCRIBE MARKS AND CORRODED, FR 900-1040. R & R CREASE BEAM INBD CHORD, BS 900-1040, RBL 58, IAW SRM 51-40-02.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR FDEA200810034191Crease Beam · corrodedLT SIDE INBD CREASE BEAM CHORD STA 1300- STA 1320, LBL 58, HAS CORROSION. R & R CREASE BEAM INBD CHORD, BS 1300-1380, LBL 58, IAW SRM 51-40-02. FABRICATED ON MAE TRAVELER T8/759465. THIS IS A CATEGORY "A" MAJOR REPAIR.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR FDEA200810034190Crease Beam · corrodedFR-1020, CREASE BEAM WEB CORRODED, FWD SIDE OF FR-1020. R & R WEB AND ANGLE, BS 1020, RBL 65, IAW SRM 51-40-02. REPAIR PARTS FABRICATED ON MAE TRAVELERS T8/759254, T8/760846. THIS REPAIR IS CLASSIFIED AS A CATEGORY "A" MAJOR REPAIR.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR FDEA200810034189Crease Beam · corrodedBS 900-920 RT SIDE FOUND CREASE BEAM WEB CORRODED. R & R WEB AND FLANGED DOUBLER, BS 900-920, RBL 62-65, IAW SRM 51-40-02. REPAIR PARTS FABRICATED ON MAE TRAVELERS T8/761489 AND T8/761490. THIS REPAIR IS CLASSIFIED AS A CATEGORY "A" MAJOR REPAIR.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR FDEA200810034185Panel · corrodedNR 2 PYLON PNL 443 FR CUT OUT HAS SURFACE CORROSION. BLENDED AREA IAW 54-50-71 CHECKED LIMITS, FOUND TO BE OUT OF LIMITS IAW SRM 54-50-71 FIG 101 DETAIL IV. REMOVED MACHINE DOUBLER IAW SRM 51-40-02. REPLACED MACHINE DOUBLER IAW SRM 51-10-02. FABRICATED DOUOct 3, 2008 · N920FD · Boeing 75723A · Nacelle/Pylon, Plate/SkinSDR FDEA200810034188Seat Track · gougedMAIN CABIN, SEAT TRACK BS 900 TO BS 1076 LBL 45.50 CROWN GOUGED AND SCRATCHED. REMOVED AND REPLACED SEAT TRACK STA 900 TO 1076 LBL 45.50 IAW SRM 51-40-02, 53-00-52, REPAIR NR 4. THIS IS A MAJOR AND CATEGORY "A" REPAIR.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage, Seat/Cargo Attach FittingsSDR FDEA200810034182Crease Beam · corrodedMAIN CABIN, STA 1620-1640, RT SIDE INBD CREASE BEAM CHORD HAS CORROSION. REMOVED CORROSION AND CHECK LIMITS, FOUND TO BE OUT OF LIMITS IAW SRM 53-60-03 FIG 101 DETAIL III. REMOVED CREASE BEAM INBD CHORD, FABRICATED CREASE BEAM INBD CHORD IAW SRM 51-10-02 SECOct 3, 2008 · N920FD · Boeing 75723A · Fuselage Main, StructureSDR FDEA200810034195Crease Beam · corrodedMAIN CABIN , CREASE BEAM, INBD CHORD BS 391, RBL 58, THERE IS A MISDRILLED HOLE, AND BS 430-418 HAS CORROSION RT. REMOVED AND REPLACED CREASE BEAM, INBD CHORD, RBL 58, STA 297-395 IAW SRM 51-40-02. FOUND CORROSION OUT OF LIMITS IAW SRM 53-10-15, L=9.0", W=1.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04186Crease Beam · corrodedMAIN CABIN CREASE BEAM , BS 663-756 LBL 62 HAS CORROSION. REMOVED CORROSION IAW SRM 51-10-02, CHECKED LIMITS AND FOUND TO BE OUT OF LIMITS IAW SRM 53-30-13. REMOVED, FABRICATED AND INSTALLED CREASE BEAM IAW SRM 51-40-02 AND DWG 143N5520.Oct 3, 2008 · N920FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04196Crease Beam · corrodedCREASE BEAM WEB FROM STA 600-620 RBL 65 HAS CORROSION ON UPPER SURFACE. REMOVED AND REPLACED WEB AND ANGLE TRAVELER T8/761895 AND T8/758987 IAW SRM 51-40-02 DRAWING 143N5520. THIS IS CLASSIFIED AS A CATEGORY "A" MAJOR REPAIR.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04195Crease Beam · corrodedMAIN CABIN CREASE BEAM BS 391, THERE IS A MISDRILLED HOLE ,AND BS 430-418 HAS CORROSION RT. REMOVED AND REPLACED CREASE BEAM BS 297-395 IAW SRM 51-40-02. FABRICATED ON MAE TRAVELER T8/760162. THIS REPAIR IS CLASSIFIED AS A CATEGORY "A" MAJOR REPAIR.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04194Floor Support · corrodedAFT CABIN FLOOR SUPPORT STRUCTURE BETWEEN STA. 1701 AND 1720 RBL 24 ANGLE HAS CORROSION . REPAIRED FLOOR SUPPORT AND NUT PLATE ASSY. IAW SRM 53-60-51 AND 51-40-02.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Miscellaneous StructureSDR 08FDEA04193Floorbeam · misalignedMAIN CABIN FLOORBEAM BS 1580 LBL 25-45 HAS MISDRILLED HOLES. REPAIRED IAW SRM 53-00-51.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, Floor BeamSDR 08FDEA04192Crease Beam · corrodedCREASE BEAM RT SIDE HAS SCRIBE MARKS AND CORRODED, BS 900-1040. REMOVED AND REPLACED CREASE BEAM IAW SRM 51-40-02.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04191Crease Beam · corrodedLT SIDE I/B CREASE BEAM BS 1300-1320 HAS CORROSION . REMOVED AND REPLACED CREASE BEAM IAW SRM 51-40-02. FABRICATED ON MAE TRAVELER T8/759465. THIS IS A CATEGORY "A" MAJOR REPAIR.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04190Crease Beam · corrodedBS 1020, CREASE BEAM WEB CORRODED, REMOVED AND REPLACED WEB AND ANGLE IAW SRM 51-40-02. REPAIR PARTS FABRICATED ON MAE TRAVELERS T8/759254, T8/760846. THIS REPAIR IS CLASSIFIED AS A CATEGORY "A" MAJOR REPAIR.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04189Crease Beam · corrodedBS 900- 920 RT SIDE FOUND CREASE BEAM WEB CORRODED. REMOVED AND REPLACED AND FLANGED DOUBLER IAW SRM 51-40-02. REPAIR PARTS FABRICATED ON MAE TRAVELERS T8/761489 AND T8/761490. THIS REPAIR IS CLASSIFIED AS A CATEGORY "A" MAJOR REPAIR.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04188Seat Track · gougedMAIN CABIN ,SEAT TRACK BS 900 TO 1076 LBL 45.50 CROWN GOUGED AND SCRATCHED. REMOVED AND REPLACED SEAT TRACK IAW SRM 51-40-02, 53-00-52.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage, Seat/Cargo Attach FittingsSDR 08FDEA04187Seat Track · gougedMAIN CABIN ,SEAT TRACK BS 900 TO BS 1076 LBL 24.75 CROWN SCRATCHED AND GOUGED. REMOVED AND REPLACED SEAT TRACK STA. 900 TO 1076 LBL 24.75 IAW SRM 51-40-02.Oct 3, 2008 · N918FD · Boeing 75723A · Fuselage, Seat/Cargo Attach FittingsSDR 08FDEA04185Doubler · corrodedNR 2 PYLON PANEL 443 FRAME CUT OUT HAS SURFACE CORROSION. BLENDED AREA IAW 54-50-71 FOUND TO BE OUT OF LIMITS IAW SRM 54-50-71. REMOVED MACHINE DOUBLER IAW SRM 51-40-02 REPLACED DOULBER IAW SRM 51-10-02.Oct 3, 2008 · N920FD · Boeing 75723A · Nacelle/Pylon, Plate/SkinSDR 08FDEA04184Seat Track · misalignedMAIN CABIN SEAT TRACK FLANGE 1620-1640, LBL 45 HAS 2 SCREW HOLES ELONGATED. REMOVED DAMAGED SEAT TRACK PER SRM 51-40-02, FABRICATED NEW SEAT TRACK PER MAE TRAVELER T8/752959. LOCATED AND DRILLED PER SRM 51-40-05, TREATED AND PRIMED PER SRM 51-20-01, PAINTED PEOct 3, 2008 · N920FD · Boeing 75723A · Fuselage, Seat/Cargo Attach FittingsSDR 08FDEA04183Seat Track · crackedSEAT TRACK BS 1540 LBL 45 FLANGE CRACKED. REMOVED SEAT TRACK PER SRM 51-40-02. RECEIVED NEW SEAT TRACK PER MAE TRAVELER T8/759349. LOCATED AND DRILLED PER SRM 51-40-05, TREATED AND PRIMED PER SRM 54-20-01 ,PAINTED PER SRM 51-21-00-7, AND INSTALLED PER SRM 51-4Oct 3, 2008 · N920FD · Boeing 75723A · Fuselage, Seat/Cargo Attach FittingsSDR 08FDEA04182Crease Beam · corrodedMAIN CABIN BS 1620-1640,RT SIDE CREASE BEAM HAS CORROSION. REMOVE CORROSION AND CHECK LIMITS, FOUND TO BE OUT OF LIMITS IAW SRM 53-60-03. REMOVED CREASE BEAM, FABRICATED BEAM IAW SRM 51-10-02 SECTION 8 . LOCATED AND DRILLED, TREATED AND PRIMED AND INSTALLED IAOct 3, 2008 · N920FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04181Floorbeam · corrodedMAIN CABIN FLOORBEAM, BS 345, RBL 0-25 HAS CORROSION. REMOVED CORROSION FROM BS 345 AT RBL 0-25. CORROSION CHECKED OUT OF LIMITS IAW SRM 53-00-51 . REMOVED DAMAGED AREA, FABRICATED REPAIR PARTS INSTALLED REPAIR PARTS AT BS 345 LBL-53 TO RBL 32 WORK DONE IAW SOct 3, 2008 · N920FD · Boeing 75723A · Fuselage Main, Floor BeamSDR 08FDEA04180Structure · crackedBS 660-686 AT S13L, OUTBOARD CHORD IS CRACKED. REMOVED OUTBOARD CHORD IAW 51-40-01, FABRICATED CHORD ON MAE TRAVELER T8/761457, INSTALLED NEW CHORD IAW SRM 51-40-01.Oct 3, 2008 · N920FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04179Crease Beam · corrodedMAIN CABIN BS 1380-1400,RT SIDE O.B. CREASE BEAM CHORD HAS CORROSION. REMOVED CORROSION IAW 51-00-53,CHECKED LIMITS AND FOUND TO BE OUT OF LIMITS IAW 53-60-13, SUMITTED E.A.R FOR REPAIR. WORKED DAMAGE PER EA F-5310-123912.Oct 3, 2008 · N920FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04178Frame · damagedAFTER REMOVAL OF DOUBLER FROM TV MONITOR SUPPORT AT BS 377 FOUND SEVERAL HOLES IN FRAME. REMOVED FRAME AT BS 377 FROM S4L TO 4R IAW SRM 51-40-02. FOUND FRAME OUT OF LIMITS IAW SRM 53-00-07 FIG. 101 SHEET NR 1 . FABRICATED NEW SECTION FRAME BS 377 FROM MAE TROct 3, 2008 · N920FD · Boeing 75723A · Fuselage Main, FrameSDR 08FDEA04177Skin Panel · corrodedNR 2 PYLON TORQUE BOX INTERNAL SKIN HAS CORROSION AT LWR CHORD ATTACHMENT ON SEVERAL LOCATIONS. REMOVED AND INSTALLED HINGE BRACKET PER SRM 51-40-02. REMOVED AND INSTALLED HEATSHIELD PER SRM 51-40-02. REMOVED AND INSTALLED FWD. FAIRING PER SRM 51-40-02. REMOOct 3, 2008 · N920FD · Boeing 75723A · Nacelle/Pylon, Plate/SkinSDR 08FDEA04061Crease Beam · corrodedFWD OF STA 324 RT SIDE I/B CREASE BEAM CHORD HAS CORROSION. REMOVED CORROSION FOUND TO OUT OF LIMITS. INSTALLED NEW CREASE BEAM IAW SRM 51-40-02.Sep 26, 2008 · N920FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04059Floorbeam · corrodedCABIN FLOORBEAM STA 1640 LBL 58 HAS CORROSION. REMOVE CORROSION IAW SRM 51-40-02 CHECK LIMITS FOUND TO BE OUT OF LIMITS IAW SRD 53-00-51. REMOVED DAMAGED FLOORBEAM IAW SRM 53-00-01, RECEIVED EXTRUSION BAC1505-100 703 BATCH NR 0001493411ON MAE T8-54170, LOCATSep 26, 2008 · N920FD · Boeing 75723A · Fuselage Main, Floor BeamSDR 08FDEA04056Floorbeam · corrodedMAIN CABIN FLOORBEAM BS 1681.8 UPPER T-CHORD LOWER SURFACE LBL58.22-RBL58.22 CORRODED. REMOVED CORROSION FOUND TO BE OUT OF LIMITS IAW SRM 53-00-51, FAB NEW T-CHORD ON TRAVELER NR T8-756288, T8-756289, T8-756213. INSTALLED FABRICATED PARTS IAW 51-40-02.Sep 26, 2008 · N920FD · Boeing 75723A · Fuselage Main, Floor BeamSDR 08FDEA04055Floorbeam · gougedCABIN FLOORBEAM FS 324 RBL 32 GOUGED. REMOVED GOUGE ON FLOORBEAM. FOUND TO BE OUT OF LIMITS IAW SRM 53-00-51 FIG 101 SHEET 3 DETAIL 3. REMOVED FLOORBEAM, AND FLOOR SUPPORT FOR ACCESS FAB NEW T- CHORD AND INSTALLED IAW 51-40-02.Sep 26, 2008 · N920FD · Boeing 75723A · Fuselage Main, Floor BeamSDR 08FDEA04027Seat Track · corrodedMAIN CABIN SEAT TRACK, STA 418-440, RBL 45, IS GOUGED AND HAS CORROSION. REMOVED CORROSION FROM DAMAGED AREA. DAMAGED AREA CHECKED OUT OF LIMITS. REMOVED SEAT TRACK, FABRICATED NEW SEAT TRACK PER TRAVELER NR T8/756397. PREP AND PAINTED SEAT TRACK IAW 51-21-Sep 24, 2008 · N920FD · Boeing 75723A · Fuselage, Seat/Cargo Attach FittingsSDR 08FDEA04026Skin · damagedFUSELAGE SKIN BETWEEN STA 1500 AND 1520, STR 24L AND 25L HAS SMALL PUNCTURE DAMAGE REMOVED DAMAGE, FAB REPAIR PARTS, AND LOCATED AND DRILLED REPAIR PARTS IAW SRM 53-00-01 REPAIR 7. TREATED AND PRIMED REPAIR PARTS IAW SRM 51-20-01. INSTALLED REPAIR PARTS IAW Sep 24, 2008 · N920FD · Boeing 75723A · Fuselage Main, Plate/SkinSDR 08FDEA04025Seat Track · corrodedMAIN CABIN SEAT TRACK BS 440-680 CROWN SCRATCHED, GOUGED AND HAS CORROSION ON BS 675 LBL 45.5. REMOVED SEAT TRACK, FAB SEAT TRACK ON TRAVELER NR T8-758687 AND INSTALLED SEAT TRACK IAW 51-10-02.Sep 24, 2008 · N918FD · Boeing 75723A · Fuselage, Seat/Cargo Attach FittingsSDR 08FDEA04024Seat Track · corrodedMAIN CABIN, SEAT TRACK BS 680 TO BS 780 LBL 45.5 HAS CORROSION AND GOUGED. REMOVED AND REPLACED SEAT TRACK, TRAVELER NR T8-758325, IAW 51-40-02.Sep 24, 2008 · N918FD · Boeing 75723A · Fuselage, Seat/Cargo Attach FittingsSDR 08FDEA04023Crease Beam · corrodedFR-1020, CREASE BEAM WEB CORRODED, FWD SIDE OF FR-1020 REMOVED AND REPLACED WEB AND ANGLE IAW SRM 51-40-02, MAJOR REPAIR.Sep 24, 2008 · N918FD · Boeing 75723A · Fuselage Main, StructureSDR FDEA200809234006Skin · corrodedNR 1 PYLON OTBD AFT 311N5046-31 SKIN PANEL ASSY HAS CORROSION ON INNER SURFACE. REMOVED AND INSTALLED STRIKER PLATE AND MOUNT FITTING IAW SRM 51-40-02 AND DWG 311N5108. REMOVED AND INSTALLED HEAT SHIELD IAW SRM 51-40-02. REMOVED AND INSTALLED FWD FAIRING IASep 23, 2008 · N920FD · Boeing 75723A · Nacelle/Pylon, Plate/SkinSDR 08FDEA04008Channel · gougedFRAME STA 1280 HAS GOUGES ON DIFF, AREAS BETWEEN S5R TO S14R. BLENDED AREAS, IAW SRM 53-00-07. FABRICATED REPAIR PARTS ON MAE TRAV NR T8/753587 AND T8/753544. INSTALLED REPAIR PARTS ON FRAME STA 1280 IAW SRM 51-40-02. MAJOR REPAIR.Sep 23, 2008 · N920FD · Boeing 75723A · Fuselage Miscellaneous StructureSDR 08FDEA04007Crease Beam · corrodedMAIN CABIN STA 1600-1620, RT SIDE CREASE BEAM WEB AND I/B CHORD HAVE CORROSION. REMOVED WEB IAW SRM 51-40-02. FABRICATED NEW WEB ON MAE TRAV NR T8/75784 IAW SRM 51-21-01. INSTALLED WEB ON STA 1600 IAW SRM 51-40-02. MAJOR REPAIR.Sep 23, 2008 · N920FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA04006Skin · corrodedNR 1 PYLON O/B AFT 311N5046-31 SKIN PANEL ASSY HAS CORROSION ON INNER SURFACE. REMOVED AND INSTALLED STRIKER PLATE AND MOUNT FITTING PER SRM 51-40-02 AND DRAWING 311N5108. REMOVED AND INSTALLED HEAT SHIELD PER SRM 51-40-02. REMOVED AND INSTALLED FWD FAIRINGSep 23, 2008 · N920FD · Boeing 75723A · Nacelle/Pylon, Plate/SkinSDR 08FDEA03993Cusp Web · corrodedCENTER WING, INTERNAL, BS 1000-1020, RBL 68, CUSP WEB CORRODED. REMOVED CORROSION ON CTR WING, INTERNAL, SHEAR WEB, BS 1000-1020, RBL 68, PER SRM 51-21-01, 51-40-02. FOUND CORROSION OUT-OF-LIMITS PER SRM 53-40-13, FIG 101, DETAIL 3. REMOVED AND REPLACED Sep 22, 2008 · N920FD · Boeing 75723A · Fuselage Miscellaneous StructureSDR 08FDEA03992Crease Beam · corrodedMAIN CABIN, BS 1180 - 1200, RT SIDE, I/B CREASE BEAM CHORD HAS CORROSION UNDERNEATH FWD AND AFT NUT PLATES. REMOVED CORROSION ON WEB CHORD AT BS 1180-1200, AND FOUND TO BE OUT-OF-LIMITS IAW SRM 53-60-13, FIG 101, DETAIL 3. REMOVED AND REPLACED CREASE BEAM Sep 22, 2008 · N920FD · Boeing 75723A · Fuselage Main, StructureSDR 08FDEA03988Crease Beam · corrodedMAIN CABIN CREASE BEAM, I/B CHORD, BS 900-1040, LBL 62, HAS CORRODED SPOTS. REMOVED AND REPLACED CREASE BEAM IAW SRM 51-10-02, 51-40-02, AND 53-40-13. THIS REPAIR IS CLASSIFIED AS A "MAJOR" REPAIR, CATEGORY "A", WITH NO FOLLOW UP TRACKING REQUIREMENTS.Sep 22, 2008 · N918FD · Boeing 75723A · Fuselage Main, Structure
Back to Boeing 757-23A