Boeing 767-205
Service difficulty reports · 165
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = '767205' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = '767205' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR TWAA9812703Battery Pack · dischargedMAINT FOUND EMERGENCY LIGHT EQUIPMENT NRS L308, L311, L333 WERE INOPERATIVE ON TEST. REPLACED BATTERY PACK. CHECK-C 7-21-98 LAX.SDR TWAA9812130Skin · crackedDURING CHECK-C MAINT, FOUND LT WING O/B FLAP LOWER SKIN WITH 2 IN CRACK APPROX 18 IN FROM I/B END AND APPROX 12 IN FROM T/E. CUT OUT DAMAGED AREA AND INSTALLED FIBER GLASS 250 DEG CURE HOT BOND REPAIR PER SRM 57-53-01 AND 51-70-07.SDR TWAA9812131Skin · tornDURING CHECK-C MAINT, FOUND NR 5 SPOILER T/E 1.5 IN TEAR IN SPOILER PANEL. REPAIRED PER SRM. INSTALLED LAYER ADHESIVE AND LAYER FABRIC AND HOT BOND 6 BY 6 PER SRM 51-70-17, FIG 19 ITEM 3H.SDR TWAA9805402Battery Pack · dischargedJFK - DURING MAINTENANCE CHECK OF THE AIRCRAFT, THE EGRESS LIGHTS WERE FOUND FLASHING FROM ROW 30 TO ROW 35 AFT RT SIDE OF CABIN. REPLACED BATTERY PACK. CHECK-C 3-27-98 LAX. (X)SDR TWAA9802203Oil Regulator · leakingSTL - FLT 842 - AIRCRAFT WAS OPERATING WITH THE LT GENERATOR PLACARDED INOPERABLE PER MEL. IN-FLIGHT, THE APU AUTO SHUTDOWN WITH EICAS MSG - APU LOW OIL PRESS. DIVERTED TO STL. REPLACED THE LEFT IDG AND PLACARDED THE APU INOP PER MEL. AIRCRAFT OPERATED TO SDR TWAA9716004Vane Bleed Contl · out of adjustJFK - DURING CRUISE, NR 2 ENGINE SUFFERED COMPRESSOR STALL. ADJUSTED ENGINE VANE BLEED CONTROL (EVBC). OPERATIONAL CHECK AND ENGINE RUN NORMAL. (M)SDR TWAA9703003Pressure Switch · failedLGW - DURING CRUISE, BOTH FORWARD AND AFT FUEL PUMP LOW PRESSURE LIGHTS ILLUMINATED. REMOVED AND REPLACED BOTH FORWARD AND AFT FUEL PRESSURE SWITCHES, MFG P/N 7G110-3. OPERATIONAL CHECK NORMAL. (M)SDR 96ZZZM1040Oven · dirtyJFK - DURING CRUISE E6 OVEN EMITTED SMOKE. TURNED OFF OVEN. FOUND DEBRIS IN OVEN. REPLACED OVEN, MFG P/N 8201-11-0000. OVEN OPERATION THEN CHECKED NORMAL.SDR 96ZZZM660Power Supply · inoperativeLAX - FLT NR 15 - DURING CRUISE LEFT AISLE EGRESS LIGHT AT SEAT ROWS 30 TO 35 AND L3 DOOR, ILLUMINATED. CYCLED SWITCH AND BACK TO ARMED. FOUND POWER SUPPLY, MFG P/N 5822-43, FAULTY. REPLACED POWER SUPPLY AND EGRESS LIGHT SYSTEM OPERATION CHECKED NORMAL. (MSDR 97ZZZX488Compressor · failedSEA - FLT 740 - DURING CLIMB, NR 1 ENGINE, SN 4603, SURGED. POWER WAS REDUCED TO IDLE. CHANGED NR 1 ENGINE. ENGINE TOTAL TIME: 29,752 HOURS; 8,040 CYCLES. INVESTIGATION REVEALED THE HIGH PRESSURE COMPRESSOR HAD NON-CONCENTRIC RUBBING OF RUBSTRIPS ON THE 1SDR 96ZZZX827Engine · surgedSEA - FLT 740 - DURING CLIMB, NR 1 ENGINE, S/N 4603, SURGED. POWER WAS REDUCED TO IDLE. CHANGED NR 1 ENGINE. ENGINE TOTAL TIME: 29,752 HOURS; 8,040 CYCLES. CHECK C-4C - 10-25-95 - LAX.SDR 96ZZZX2135Engine · malfunctionedSEA - FLT 740 - DURING CLIMB, NR 1 ENGINE, SN 4609, SURGED. POWER WAS REDUCED TO IDLE. CHANGED NR 1 ENGINE. ENGINE TOTAL TIME: 29,752 HOURS; 8,040 CYCLES. CHECK C-4C - 10-25-95 - LAX.SDR 96ZZZX1291Engine · malfunctionedSEA - FLT 740 - DURING CLIMB, NR 1 ENGINE, SN 4609, SURGED. POWER WAS REDUCED TO IDLE. CHANGED NR 1 ENGINE. ENGINE TOTAL TIME: 29,752 HOURS; 8,040 CYCLES. CHECK C-4C - 10-25-95. LAX.SDR 96ZZZX218Bleed Valve · malfunctionedLAX - FLT 8595 - DURING CRUISE, SHUT DOWN NR 2 ENGINE, SN 4626, DUE TO SURGING. REMOVED AND REPLACED RT ENGINE BLEED CONTROL VALVE, MFG PN 773333-3. PERFORMED BORESCOPE INSPECTION OF 5TH, 6TH, 8TH, AND 14TH COMPRESSOR STAGES AND 1ST, 2ND, AND 3RD TURBINE STASDR 96ZZZX640Floor Beam · corrodedMCI - DURING OP-16, FOUND CORROSION ON FLOOR BEAM CAP, STA 1518, RBL 18. REMOVED CORROSION AND REPAIRED PER SRM 53-00-51. AIRCRAFT TOTAL TIME: 38,181 HOURS; 13,720 CYCLES.
Back to Boeing 767-205