What was found
LAX - FLT 8595 - DURING CRUISE, SHUT DOWN NR 2 ENGINE, SN 4626, DUE TO SURGING. REMOVED AND REPLACED RT ENGINE BLEED CONTROL VALVE, MFG PN 773333-3. PERFORMED BORESCOPE INSPECTION OF 5TH, 6TH, 8TH, AND 14TH COMPRESSOR STAGES AND 1ST, 2ND, AND 3RD TURBINE STAGES. NO DISCREPANCIES FOUND. OPERATIONAL CHECK NORMAL. ENGINE TOTAL TIME: 34,097 HOURS; 8,432 CYCLES. CHECK C-4C - 10-25-95 - LAX.