Douglas DC-8-71F
Service difficulty reports · 8,938
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC871F' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC871F' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR UPS00832826Shear Tie · corrodedINSPECTION TYPE:C123, STA 1480 BETWEEN LONG 35L AND 36 SHEAR TIE IS CORRODED BEYOND LIMITS. REPAIRED IAW SRM 53-2-0 FIG 2A.SDR UPS00832820Fitting · crackedINSPECTION TYPE:C123, STA 1219 LONG 17R INTERCOSTAL ATTACH FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 4750418 AND SRM 51-1-20D.SDR UPS00832815Fitting · crackedINSPECTION TYPE:C123, STA 1231 - 1237 LONG 35L INTERCOSTAL TIE FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 3758570 AND SRM 51-1-20D.SDR UPS00832809Fitting · crackedINSPECTION TYPE:C123, STA 1690 LONG 26L END FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 4641324 AND SRM 51-1-20D.SDR UPS00832808Fitting · crackedINSPECTION TYPE:C123, STA 1690 LONG 34R END FITTING IS CRACKED. REMOVED AND REPLACED END FITTING IAW DWG 4641324 AND SRM 51-1-20D.SDR UPS00832804Fitting · crackedINSPECTION TYPE:C123, STA 1690 LONG 30L END FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 4641324 AND SRM 51-1-20D.SDR UPS00832801Fitting · crackedINSPECTION TYPE:C123, STA 1690 LONG 28L END FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 4641324 AND SRM 51-1-20D.SDR UPS00832799Attach Fitting · crackedINSPECTION TYPE:C123, STA 822 FLOORBEAM ATTACH FITTING IS CRACKED AT LBL 24. REMOVED, FABRICATED AND REPLACED FITTING IAW DWG 4646547 AND SRM 51-1-20D.SDR UPS00832795Fitting · crackedINSPECTION TYPE:C123, STA 1287 LONG 23R FRAME TO CUSP FITTING IS CRACKED. REMOVED, FABRICATED AND REPLACED FITTING IAW DWG 9755584 AND SRM 51-1-20D.SDR UPS00832792Intercostal · crackedINSPECTION TYPE:C123, STA 1537 INTERCOSTAL IS CRACKED AT LONG 33L. REMOVED, FABRICATED AND REPLACED INTERCOSTAL IAW DWG 9753792 AND SRM 51-1-21.SDR UPS00832790Fitting · crackedINSPECTION TYPE:C123, STA 980 - 1000 LONG 23L END FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 3753306 AND SRM 51-1-20D.SDR UPS00832783Fitting · crackedINSPECTION TYPE:C123, STA 1160 AT LONG 27R FLOORBEAM SUPPORT FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 9754024 AND SRM 51-1-20D, 51-1-21.SDR UPS00832781Fitting · crackedINSPECTION TYPE:C123, STA 680 A-FRAME FITTING IS CRACKED BETWEEN LONG 22L AND 23L. REMOVED AND REPLACED FITTING IAW DWG 3642983 AND SRM 51-3-0.SDR UPS00832772Fitting · crackedINSPECTION TYPE:C123, STA 1690 LONG 26R END FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 4641324 AND SRM 51-1-20D.SDR UPS00832771Fitting · crackedINSPECTION TYPE:C123, STA 1690 LONG 32R END FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 4641324N AND SRM 51-1-20D.SDR UPS00832672Fitting · crackedINSPECTION TYPE:C123, STA 798 LBL 50 FLOORBEAM TO WING BOX LOWER ANGLE FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 3643112 AND SRM 51-1-20D.SDR UPS00832670Rib · crackedINSPECTION TYPE:C123, RIGHT WING L/E UPPER RIB IS CRACKED AT XFS 723.75. REPAIRED IAW SRM 57-2-0 FIG 2.SDR RRXA002711Skin · gougedDURING A MAINTENANCE VISIT FOUND GOUGED SKIN ON THE RT WING NR 4 STUB LOWER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, ALODINED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IAW EO NR 00-107 WITH APPROVED 8110-3 DATED 5-10-00.SDR UPS00832834Fitting · crackedINSPECTION TYPE:C123, STA 798 LONG 18L INTERCOSTAL TO FRAME FITTING IS CRACKED. REMOVED, FABRICATED AND REPLACED FITTING IAW DWG 4751639 AND SRM 51-1-20D.SDR UPS00832817Rib · crackedINSPECTION TYPE:C123, RIGHT WING L/E UPPER RIB IS CRACKED AT XOLDI 6.225. REPAIRED IAW SRM 57-2-0 FIG 2.SDR UPS00832816Fitting · crackedINSPECTION TYPE:C123, STA 660 -680 LONG 11L END FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 5750540 AND SRM 51-1-20D.SDR UPS00832798Fitting · crackedINSPECTION TYPE:C123, STA 850 LONG 7L END FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 3779659 AND SRM 51-1-20D, 51-1-21.SDR UPS00832797Fitting · crackedINSPECTION TYPE:C123, STA 850 LONG 9L END FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 3779659 AND SRM 51-1-20D.SDR UPS00832796Fitting · crackedINSPECTION TYPE:C123, STA 280 AT LONG 27R FITTING IN TORQUE BOX BELOW VERTICAL SUPPORT IS CRACKED. REMOVED AND REPLACED FITTING IAW DWG 3754025 AND SRM 51-1-20D.SDR FWT2001F00004Indicator · faultyON CLIMB OUT, NR 3 EGT STARTED TO RISE AND REACHED TEMP LIMIT. WITH POWER LEVER BACK EGT STAYED WITHIN LIMITS. WITH PMC OFF TEMP STARTED TO RISE. DUMPED FUEL IAW AIRCRAFT ABNORMAL PROCEDURES CHECK LIST. BORESCOPE NR 3 ENGINE HPC AND HPT IAW MM. PERFORMED SDR UPS00832810Frame · crackedINSPECTION TYPE:C123, STA 55 FRAME IS CRACKED AT LONG 24R. REPAIRED IAW SRM 53-2-0 FIG 2.SDR UPS00832765Frame · crackedINSPECTION TYPE:C123, STA 55 FRAME IS CRACKED AT LONG 24L. REPAIRED IAW SRM 53-2-0 FIG 2.SDR UPS00832669Skin · crackedINSPECTION TYPE:C123, LEFT WING CENTER L/E SKIN IS CRACKED AT XW 257. REPAIRED IAW SRM 57-2-1 FIG 2H.SDR UPS00832668Skin · crackedINSPECTION TYPE:C123, LEFT WING AUX TANK LOWER SKIN IS CRACKED AT XFS 138.75. REPAIRED IAW SRM 57-2-0 FIG 2A.SDR UPS00832630Battery Pack · dischargedINSPECTION TYPE:N/A, EMERGENCY EXIT LIGHTING WILL NOT TEST. REPLACED EMERGENCY EXIT LIGHT BATTERY PACK.SDR RRXA003494Finger Doubler · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FINGER DOUBLER BETWEEN FRAME -52 TO -70, -X20 INCHES TO 25 INCHES, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED PART SDR RRXA002768Stiffener · crackedDURING A MAINTENANCE VISIT FOUND A 9 INCH LONG CRACK TO THE STIFFENER AT X=-20 Y=960 TO 980 AND Z=-6, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0 ASDR RRXA002757Web · crackedDURING A MAINTENANCE VISIT FOUND A CRACK WITH POPPED RIVETS TO THE AFT DOOR JAMB WEB AT STA 560, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0 AND 5-SDR RRXA002754Door Frame · crackedDURING A MAINTENANCE VISIT FOUND A BENT AND CRACKED DOOR FRAME AT A PIT DOOR LOWER DOOR FRAME, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 51-1-24 AND 52-SDR RRXA002700Skin · crackedDURING A MAINTENANCE VISIT FOUND BENT METAL AND JAGGED EDGES (CRACKED) ON THE FORWARD ENTRY DOOR BOTTOM FWD CORNER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IAW DC-8 SDR RRXA002697Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACKED UPPER LEFT I/B HORIZONTAL STAB L/E FR AT STA XFS 53.7, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 51-1-4, 51-1SDR RRXA002696Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACKED LOWER LEFT I/B HORIZONTAL STAB L/E FRAME AT XFS 53.7, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 55-2-0, 51-1-SDR RRXA002693Intercostal · crackedDURING A MAINTENANCE VISIT FOUND A CRACK 1 INCH AND 4 INCH LONG ON THE LOWER CENTER WING AREA EXTERNAL/INTERCOSTAL AT STA 781 AND L33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTSDR RRXA002687Frame · damagedDURING A MAINTENANCE VISIT FOUND AN IMPROPER REPAIR TO THE CENTER L/E LOWER FORMER AT STA XFS 360, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-0 AND SDR RRXA002686Doubler · damagedDURING A MAINTENANCE VISIT FOUND AN IMPROPER REPAIR TO THE CENTER L/E LOWER FORMER AT STA XFS 335, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-0 AND SDR RRXA002685Attach Angle · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE L/E ABOVE NR 2 PYLON UPPER FORWARD FORMER ATTACH ANGLE AT STA XFS 256, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW SDR RRXA002684Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CENTER L/E UPPER FORMER AT TRAILING EDGE AT STA 435, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-0 ANSDR RRXA002683Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CENTER L/E UPPER FORMER AT TRAILING EDGE AT STA XFS 360, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-SDR RRXA002681Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CENTER L/E UPPER FORMER AT TRAILING EDGE AT STA XFS 442, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-SDR RRXA002676Nut Plate · missingDURING A MAINTENANCE VISIT FOUND A CRACK TO THE UPPER RIB AT TRAILING EDGE I/B AT XFS 483, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM, 57-2-0 AND 51-1-21SDR RRXA002675Rib · crackedDURING A MAINTENANCE VSIIT FOUND A CRACK TO THE UPPER RIB AT TRAILING EDGE I/B AT XFS 477, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 51-1-21 AND 57-2-0.SDR RRXA002673Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE LOWER RIB AT TRAILING EDGE I/B AT CENTER L/E AT STA XFS 467, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 5SDR RRXA002773Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE VERT STAB LOWER L/E FRAME, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 55-2-0, 51-1-4 AND 51-1-21.SDR RRXA002772Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE VERT STAB CENTER L/E FRAME AT ZFS 267, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 55-2-0 AND 51-1-21.SDR RRXA002771Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE VERT STAB CENTER L/E FRAME AT ZFS 1797, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 55-2-0 AND 51-1-21.
Back to Douglas DC-8-71F