Douglas DC-8-71F
Service difficulty reports · 8,938
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC871F' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC871F' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR RRXA002769Frame · tornDURING A MAINTENANCE VISIT FOUND A TEAR TO THE FWD FRAME FOR CARGO DOOR UPPER CORNER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0 AND 51-1-21.SDR RRXA002763Intercostal · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE INTERCOSTAL AT STA 1100 TO 1120 AND L27R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0 AND SDR RRXA002753Intercostal · crackedDURING A MAINTENANCE VISIT FOUND CRACKED AND BENT BRACES ON THE FWD LOWER BILGE LEFT SIDE OF BULKHEAD AT STA 70, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SSDR RRXA002751Retainer · crackedDURING A MAINTENANCE VISIT FOUND A BENT FWD DOOR SEAT RETAINER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 51-1-4, 51-1-24 AND 51-1-21.SDR RRXA002747Web · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CUSP WEB AT STA 980 TO 1000 LT SIDE AND L24L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0, 51-1-4 ASDR RRXA002736Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE 3RD LOWER RIB ON THE RT WING MIDDLE L/E AT STA XFS 304, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-0SDR RRXA002735Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE 4TH RIB LOWER SURFACE ON THE RT WING MIDDLE L/E AT STA XFS 310, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRSDR RRXA002731Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE UPPER RIB ON THE RT WING O/B LEADING EDGE AT STA XFS 752, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2SDR RRXA002730Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE UPPER RIB ON THE RT WING O/B LEADING EDGE AT STA XFS 748, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2SDR RRXA002729Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK AT END OF UPPER RIB ON RT WING OUTBOARD L/E AT STA XFS 741, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-0, 5SDR RRXA002728Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACKED NR 12 UPPER RIB ON THE RT WING L/E MIDDLE SECTION AT STA XFS 408, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 5SDR RRXA002727Gusset · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE LOWER RIB INTERCOSTAL GUSSET ON THE RT WING L/E MIDDLE SECTION AT STA XFS 350, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPSDR RRXA002725Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE NR 11 UPPER RIB ON THE RT WING LEADING EDGE MIDDLE SECTION AT STA XFS 408, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR SDR RRXA002724Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE NR 8 UPPER RIB ON THE RT WING LEADING EDGE MIDDLE SECTION AT STA XFS 408, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR ISDR RRXA002723Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE NR 7 UPPER RIB ON THE RT WING MIDDLE L/E AT STA XFS 407, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-7 SRM 57-2-SDR RRXA002722Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE NR 5 UPPER RIB ON RT WING LEADING EDGE MID SECTION AT STA XFS 408, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8SDR RRXA002712Stiffener · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE RT WING NR 4 STUB WING RT SIDE VERTICAL STIFFENER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 51-1-4 AND SDR RRXA002709Baffle · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE LOWER SURFACE OF THE RT WING O/B LEADING EDGE DUCTED SKIN BAFFLE AT STA 678, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IAW DC-8 SRSDR RRXA002702Skin · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE NOSE WHEEL WELL AFT RT CORNER OF CUTOUT, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-1 AND 51-1-21.SDR RRXA002682Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CENTER L/E UPPER FORMER AT TRAILING EDGE AT STA XFS 372, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-SDR RRXA002680Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CENTER L/E UPPER FORMER AT TRAILING EDGE AT STA XFS 366, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-SDR RRXA002679Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CENTER L/E UPPER FORMER AT TRAILING EDGE AT STA XFS 354, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-SDR RRXA002678Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CENTER L/E UPPER FORMER AT TRAILING EDGE AT STA XFS 348, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-SDR RRXA002677Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE CENTER L/E UPPER FORMER AT TRAILING EDGE AT XFS 328, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-0 ANSDR RRXA002674Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE UPPER RIB AT TRAILING EDGE I/B ON CENTER L/E AT XFS 477, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-SDR RRXA002670Skin · crackedDURING A MAINTENANCE VISIT FOUND CRACKS TO THE DE-ICER BLEED HOLES ON THE LEADING EDGE O/B OF NR 1 PYLON, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2SDR RRXA002658Brace · crackedDURING A MAINTENANCE VISIT FOUND A CRACK IN THE FIRST OVERHEAD BRACE LT SIDE AT STA 1916, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 5-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0 AND 51-1-21.SDR RRXA002758Longeron · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE LONGERON AT THE FWD LWR CARGO BILGE AT STA 560 TO 550 AND L33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IAW DC-8 SRM 53-2-0.SDR RRXA002708Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE RT WING NR 3 STUB WING NR 12 RIB UPPER T/E, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-1, 57-2-0, 51SDR RRXA002705Rib · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE RT WING NR 3 STUB WING NR 6 RIB UPPER END, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-0, 51-1-21 ANDSDR UPS00832551Panel · inoperativeINSPECTION TYPE:N/A, ATB- NR 4 GEN LOW VOLTAGE, CREW REPORTED SMOKE IN COCKPIT (DFW. *S/D* REMOVED AND REPLACED BUS PROTECTION PANEL.SDR RRXA003498Sill · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE R1 DOOR AFT SILL AT FR 600 AND L21R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED PART IAW DC-8 SRM 51-1-4. (CORROSSDR RRXA003702Floor Panel · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FLOOR PANEL AT STA 50-70 X-50 Z-0, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED PART IAW DC-8 SRM 51-1-4. (CORROSION DAMAGE RECOSDR RRXA003493Floor Panel · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE COCKPIT FLOOR PANEL AT SCREW HOLES AT STA -12, +32 TO -32, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED NEW PANEL IAWSDR RRXA003492Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMMAGE TO THE COCKPIT PANEL 676B ALONG EDGE & SCREW HOLES AT FR -52X-20,Z0, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED NEW SKIN ISDR RRXA003488Floor Panel · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMGE TO THE LAV FLOOR PANEL FWD. CARGO COMPT. AT STA 220-240 AND X-40, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED PANEL IAW DC-8 SDR RRXA003699Frame · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE AFT SIDE FRAME AT STA 1140 AND L36, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0. (CORROSION DAMAGE RSDR RRXA003497Intercostal · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE CABIN FLOOR RT INTERCOSTAL AT STA 660, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED NEW PART IAW DC-8 SRM 51-1-21. (CSDR RRXA002756Skin · bulgedDURING A MAINTENANCE VISIT FOUND A BULGE TO THE SKIN IN THE FWD LWR CARGO BILGE AT STA 622 AND L36 TO L35L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IAW EO NR 00-107 SDR RRXA002733Skin · dentedDURING A MAINTENANCE VISIT FOUND A PREVIOUS DENT REPAIR FILLER DETERIORATED AND DEBONDING ON THE RT WING EXTERIOR L/E AT STA XFS 737, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IASDR UPS00832543Pressure Panel · corrodedINSPECTION TYPE:C2, LT WHEEL WELL PRESSURE PANEL IS CORRODED OUT OF LIMITS AT STA 970, LBL8. REPAIRED AREA IAW SRM 53-2-0.SDR RRXA002657Skin · dentedDURING A MAINTENANCE VISIT FOUND 2 DENTS IN SKIN BELOW GROUND POWER RECPT PLATE AT NOSE GEAR/FWD DOOR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0,SDR RRXA000447Fitting · corrodedDURING A MAINTENANCE VISIT, FOUND CORROSION DAMAGE TO Z FITTING AT STA 1160 AND LONGERON 36L - 35L. DAMAGE EXCEEDED LIMITATIONS IAW DC8 SRM. REMOVED AND REPLACED Z FITTING IAW DC8 SRM 53-1-2 FIG 1. TREATED AREA IAW DC8 SRM 51-1-8. CORROSION DAMAGE RECORDEDSDR RRXA000415Fitting · corrodedDURING A MAINTENANCE VISIT, FOUND CORROSION DAMAGE TO FWD CARGO DOOR FRAME FITTING AND FASTENER AT STA 315 AND STR 32L, DAMAGE EXCEEDED LIMITATIONS IAW DC8 SRM. REMOVED AND REPLACED CORRODED FITTING IAW DC8 SRM 53-1-02 AND MM 20-16-0 FIG 1. TREATED AREA IAW SDR RRXA000412Frame · corrodedDURING A MAINTENANCE VISIT, FOUND CORROSION DAMAGE TO FWD CARGO FRAME AT STA 120 AND STR 30R AND 27R, DAMAGE EXCEEDED LIMITATIONS IAW DC8 SRM. REMOVED AND REPLACED DAMAGED FRAME, TREATED AREA IAW DC8 SRM 51-1-8, INSTALLED IAW DC8 SRM 53-2-0 FIG 1. CORROSIONSDR RRXA000411Frame · corrodedDURING A MAINTENANCE VISIT, FOUND CORROSION DAMAGE TO FRAME, FWD CARGO AT STA 100 AND STR 35L - 35R, DAMAGE EXCEEDED LIMITATIONS IAW DC8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC8 SRM 51-1-8, RECEIVED PART AND INSTALLED IAW DC8 SRM 53-1-2. CORROSION DAMAGE RESDR RRXA000397Frame · corrodedDURING A MAINTENANCE VISIT, FOUND CORROSION DAMAGE TO MID CARGO AT STA 607 AND STR 34L AND 35R, DAMAGE EXCEEDED LIMITATIONS IAW DC8 SRM. REMOVED DAMAGE DOUBLER, TREATED AREA IAW DC8 SRM 51-1-8, FABRICATE PART AND INSTALLED IAW DC8 SRM DC8 SRM 51-1-9 & SRM 5SDR UPS00832583Cap · crackedINSPECTION TYPE:C-2, STA 857 CENTER WING TANK UPPER CHORD CRACKED AND CORRODED BEYOND LIMITS. REMOVED AND INSTALLED NEW SPAR CAP IAW SRM 51-1-20D & 51-1-21.SDR UPS00832470Rib · crackedINSPECTION TYPE:N/A, LEFT WING INBOARD SPOILER OUT HINGE POINT ATTACH FRAME APPEARS TO HAVE A CRACK. *S/D* REMOVED CRACKED FRAME BPT 92716 4-30-00, FABRICATED NEW FRAME PER SRM 57-5-1. NEEDS HEAT TREAT BPT 5-2-00 RB 09282 MF 33016, INSTALLED NEW FRAME AND ISDR RRXA002668Skin · crackedDURING A MAINTENANCE VISIT FOUND A CRACK FROM SCREW HOLE ON THE LEFT L/E LWR SURFACE AT STA XFS 710, 26 INCHES FROM FRONT SPAR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED RE
Back to Douglas DC-8-71F