Embraer EMB-145LR

Service difficulty reports · 36,799

Newest first. General aviation reporting is voluntary.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE aircraft_model_key = 'EMB145LR'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR SIMA20130722005Bulb · inoperativeMAIN CABIN DOOR EMERGENCY LIGHT INOPERATIVE. R & R MAIN CABIN DOOR EMERGENCY LIGHT BULB IAW AMM 33-50-10.Jul 22, 2013 · N602AE · Emb EMB145LR · Emergency LightingSDR SIMA20130721008Support Bracket · crackedDURING MBV INSPECTION, FOUND AFT BELLY PANEL. SUPPORT L BRACKET IS CRACKED, LOCATED JUST INBD OF RT INBD FLAP. R & R AFT BELLY SUPPORT BRACKET ON LOWER SIDE JUST INBD OF RT INBD FLAP IAW EM-53-142 AND SRM 51-40-02.Jul 21, 2013 · N677AE · Emb EMB145LR · Fuselage Miscellaneous StructureSDR SIMA20130721007Support · crackedDURING MBV INSPECTION, FOUND SUPPORT BROKEN UNDER CARGO DOOR SUPPORT ROD RECEPTICLE (FRAME 68). R & R CARGO DOOR ROD RECEPTICLE SUPPORT IAW SRM 51-40-02.Jul 21, 2013 · N677AE · Emb EMB145LR · Fuselage Miscellaneous StructureSDR SIMA20130721005Bracket · crackedDURING MBV INSPECTION, FOUND ANGLE BRACKET AT RIB 4 WHICH PANEL 155QZ ATTACHES TO IS CRACKED APPROX. 4". R & R ANGLE BRACKET AT RIB NR 4 WHICH 155QZ ATTACHES TO IAW SRM 51-40-02.Jul 21, 2013 · N677AE · Emb EMB145LR · Fuselage Miscellaneous StructureSDR SIMA20130721006Support · crackedDURING MBV INSPECTION, FOUND CARGO DOOR CABLE DRUM SUPPORT AT FRAME 68 IS CRACKED IN 2 SPOTS, APPROX 1.5" TOTAL. R & R 2 DAMAGED DRUM SUPPORTS IAW SRM 51-40-02.Jul 21, 2013 · N677AE · Emb EMB145LR · Fuselage Miscellaneous StructureSDR CHQA20130721282Valve · faultyCREW RECEIVED A NR 2 BLEED LOW TEMPERATURE MESSAGE DURING ICING CONDITIONS IN FLIGHT. DIVERTED AND LANDED WITHOUT INCIDENT. MX REPLACED NR 2 HIGH STAGE VALVE. OPS CHECKED GOOD WITH NO FURTHER DEFECTS NOTED.Jul 21, 2013 · N575RP · Emb EMB145LR · Pneumatic Distribution SystemSDR ASOA20130721077Control Module · faultyCREW REPORTED EMERGENCY LIGHTS NOT ARMED MESSAGE ON EICAS WITH LIGHTS ON. MX R & R THE CABIN LIGHT PANEL ASSY WITH OPS CHECK SUCCESSFUL. ACFT WAS APPROVED FOR RETURN TO SERVICE.Jul 21, 2013 · N22971 · Emb EMB145LR · Emergency LightingSDR SIMA20130721001Cradle · brokenF/A FLASHLIGHT HOLDER BROKEN. RAR F/A FLASHLIGHT ASSY IAW AMM 33-50-16, OPS CHECKED GOOD.Jul 21, 2013 · N648AE · Emb EMB145LR · Emergency LightingSDR CHQA20130720281Duct · leakingNR 1 COOLING PACK ON DEFERRAL, RECEIVED A NR 2 PACK VALVE CLOSED MESSAGE. FOLLOWED QUICK REFERENCE HANDBOOK AND DESCENDED TO 10,000 FT. ELECTED TO RETURN TO FIELD AND LANDED WITHOUT INCIDENT. BLEED AIR DUCT AND THE DUAL TEMPERATURE CONTROL VALVE WERE REPLAJul 20, 2013 · N291SK · Emb EMB145LR · Air Distribution SystemSDR CHQA20130720280Control Valve · leakingRECEIVED A NR 2 A/C PACK VALVE CLOSED MESSAGE. FOLLOWED QUICK REF HANDBOOK AND DESCENDED TO 10,000 FT. ELECTED TO RETURN TO FIELD AND LANDED WITHOUT INCIDENT. BLEED AIR DUCT AND DUAL TEMP CONTROL VALVE REPLACED. OPS CHECKED GOOD WITH NO FURTHER DEFECTS NOTEJul 20, 2013 · N291SK · Emb EMB145LR · Cabin Cooling SystemSDR ASOA20130720076Transducer · faultyCREW REPORTED THE RT BRAKES NOT WORKING ON LANDING, ACFT PULLED TO THE LEFT AND TOWER SAW SMOKE FROM THE RT MLG DURING LANDING. MX R & R NR 3 WHEEL SPEED TRANSDUCER AND HUB CAP ASSY. HIGH SPEED TAXI AND OPS CHECKS SUCCESSFUL. ACFT WAS APPROVED FOR RETURN TOJul 20, 2013 · N13992 · Emb EMB145LR · Landing Gear Position and WarningSDR SIMA20130720004Connector · disconnectedRT OVERWING EMERGENCY LIGHT NOT WORKING. CONNECTED THE ELECTRICAL CONNECTOR TO THE EMERGENCY LIGHT ASSY. OP'S CHECKED GOOD IAW AMM 33-50-10.Jul 20, 2013 · N615AE · Emb EMB145LR · Light System WiringSDR CHQA20130719279Overheat Sensor · failedAFTER TAKEOFF, A BRAKE OVERHEAT MESSAGE APPEARED. FOLLOWED QUICK REF HANDBOOK AND LOWERED LANDING GEAR. MESSAGE CLEARED BUT RT INBD BRAKE STAYED IN THE AMBER TEMPERATURE RANGE. ELECTED TO RETURN TO FIELD AND LANDED WITHOUT INCIDENT. INSPECTED LANDING GEAR Jul 19, 2013 · N370SK · Emb EMB145LR · Landing Gear Brake SystemSDR CHQA20130719305Beam · corrodedDURING INSPECTION, CORROSION WAS FOUND ON THE SERVICE DOOR CUTOUT LOWER BEAM. THE THRESHOLD PLATE WAS REPAIRED IAW SRM 53-40-02.Jul 19, 2013 · N566RP · Emb EMB145LR · Fuselage Main, StructureSDR CHQA20130719304Threshold · corrodedDURING INSPECTION, CORROSION WAS FOUND ON THE CARGO DOOR THRESHOLD BENEATH THE FLOOR PANEL 271FF. THRESHOLD REPAIRED IAW SRM 51-40-02.Jul 19, 2013 · N566RP · Emb EMB145LR · Fuselage Miscellaneous StructureSDR SIMA20130719005Shear Tie · crackedDURING MBV INSPECTION FOUND FRAME 68 HAS A CRACKED SHEAR CLIP BETWEEN STRINGERS 5R AND 6R. R & R LT ANGLE FRAME 68 IAW SRM 51-40-02.Jul 19, 2013 · N677AE · Emb EMB145LR · Fuselage Internal Mounting StructureSDR SIMA20130719006Shear Tie · crackedDURING MBV INSPECTION, FOUND FRAME 73 HAS A CRACKED SHEAR CLIP AT STRINGER 10R.Jul 19, 2013 · N677AE · Emb EMB145LR · Fuselage Internal Mounting StructureSDR SIMA20130719004Light · malfunctionedREAR HALF OF EMERGENCY LIGHTS CAME ON WHEN ACFT IS COMPLETELY UNPOWERED. PERFORMED OPS CHECK OF EMERGENCY LIGHTING SYSTEM IAW 33-700-17. OPS CHECKED GOOD. NO DEFECTS FOUND.Jul 19, 2013 · N935AE · Emb EMB145LR · Emergency LightingSDR SIMA20130719003Sign · inoperativeEXIT MARKING SIGN ON FWD RT GALLET INOPERATIVE. R & R EXIT MARKING SIGN ON RT GALLERY IAW AMM 33-50-14. OPS CHECKED GOOD.Jul 19, 2013 · N633AE · Emb EMB145LR · Emergency LightingSDR ASOA20130719192VFirewall · crackedDURING C-CHECK THE APU FIREWALL WAS FOUND TO BE CRACKED AT FRAME 75A AND STRINGER 12R. MX PERFORMED A DOUBLER REPAIR IAW EC5330-02578. THE ACFT WAS APPROVED FOR RETURN TO SERVICE.Jul 19, 2013 · N14959 · Emb EMB145LR · APU Cowling/ContainmentSDR ASOA20130719191Skin · corrodedDURING C-CHECK THE CARGO DOOR INTERNAL LOWER SKIN WAS FOUND TO BE CORRODED. MX REMOVED THE CORROSION AND PERFORMED A DOUBLER REPAIR IAW EC5230-01208. THE ACFT WAS APPROVED FOR RETURN TO SERVICE.Jul 19, 2013 · N14959 · Emb EMB145LR · Cargo/Baggage DoorsSDR ASOA20130719190Frame · corrodedDURING C-CHECK THE LT AND RT CABIN ESCAPE HATCH DOOR BOTTOM FRAMES WERE FOUND TO BE CORRODED. MX REMOVED THE CORROSION AND PERFORMED DOUBLER REPAIRS IAW EC5220-01052. THE ACFT WAS APPROVED FOR RETURN TO SERVICE.Jul 19, 2013 · N14959 · Emb EMB145LR · Emergency ExitsSDR SIMA20130719001Lamp · unserviceableLEFT LANDING LIGHT BULB IS CRACKED. R & R LANDING LIGHT IAW AMM 33-42-01. OPS CHECKED GOOD.Jul 19, 2013 · N931AE · Emb EMB145LR · Exterior LightingSDR SIMA20130718002Door · bindingDURING B INSPECTION, FOUND MAIN DOOR GETS CAUGHT WHILE OPENING. ACFT REMOVED FROM SERVICE. FWD UPPER SWITCH TRIM COVER REMOVED. INSTALLED MAIN DOOR FWD SWITCH COVER OPS CHECKED GOOD IAW AMM 25-23-04 TASK I. (3).(C) AIRCRAFT RETURNED TO SERVICE.Jul 18, 2013 · N931AE · Emb EMB145LR · Passenger/Crew DoorsSDR SIMA20130718015Flashlight · inoperativeDURING MX INSPECTION, FOUND AFT F/A FLASHLIGHT INOPERATIVE. REMOVED AND REPLACED FLASHLIGHT IAW AMM 33-50-16 OPS CHECKED GOOD.Jul 18, 2013 · N635AE · Emb EMB145LR · Emergency EquipmentSDR SIMA20130718006Battery Pack · inoperativeBOTH OVERWING REAR EMERGENCY LIGHTS INOPERATIVE. R & R CHARGER AND BATTERY PACK IAW AMM 33-50-04, OPS CHECKED GOOD.Jul 18, 2013 · N687JS · Emb EMB145LR · Emergency LightingSDR SIMA20130718005Lamp · inoperativeEMERGENCY LIGHT AT CEILING AISLE AFT POSITION INOPERATIVE. R & R LAMP IN AFT AISLE CEILING EMERGENCY LIGHT IAW AMM 33-50-08-000-801-A AND 33-50-08-400-801-A. OPS CHECKED GOOD.Jul 18, 2013 · N625AE · Emb EMB145LR · Emergency LightingSDR SIMA20130718003Actuator · inoperativeDURING CLIMB THROUGH THE MID 20’S ENROUTE, RECEIVED AN AUTO PITCH TRIM CAUTION MESSAGE MULTIPLE TIMES. FOLLOWED CHECKLIST AND DISENGAGED THE AUTOPILOT. RECEIVED MAIN PATCH TRIM WARNING MESSAGE. RETURNED TO DEPARTURE, DECLARED AN EMERGENCY ABD LANDED WITHOUJul 18, 2013 · N609DP · Emb EMB145LR · Stabilizer Control SystemSDR SIMA20130717008Skin · corrodedBAGGAGE DOOR CUTOUT STRUCTURE HAS CORROSION ON INNER SKIN JUST FWD OF FRAME 68. CORROSION AT BAGGAGE DOOR CUTOUT REPAIRED AS REQUIRED IAW E/O EM-53MR-1129, PART B.Jul 17, 2013 · N677AE · Emb EMB145LR · Fuselage Main, Plate/SkinSDR SIMA20130717009Floorbeam · corrodedLAV RT BEAM CORRODED AT NUT PLATES. CUT OUT DAMAGE, FABRICATED AND INSTALLED DOUBLERS ON LAV RT BEAM AT FWD AND AFT NUT PLATES IAW EO EM-53MR-2173.Jul 17, 2013 · N624AE · Emb EMB145LR · Fuselage Main, Floor BeamSDR SIMA20130717007Light · inoperativeFIVE LT AND FOUR RT PROXIMITY LIGHT SIDEWALL STRIPS ARE CRACKED. R & R PROXIMITY LIGHT SIDEWALL STRIPS IAW AMM 33-20-12.Jul 17, 2013 · N624AE · Emb EMB145LR · Emergency LightingSDR SIMA20130717006Channel · corrodedRT HAT BEAM IN LAV BETWEEN FR 59 AND 60 IS CORRODED. REPAIRED RT HAT BEAM IN LAV BETWEEN FR 59 AND 60 IAW EO EM-53MR-2170.Jul 17, 2013 · N677AE · Emb EMB145LR · Fuselage Miscellaneous StructureSDR CHQA20130717303Frame · damagedDURING INSPECTION, A DAMAGED NUTPLATE ON FRAME 69 ON THE RT SIDE BETWEEN STRINGERS 13R AND 14R WAS FOUND. THE DAMAGED AREA WAS REPAIRED IAW ETD 2013-145-018588 A.Jul 17, 2013 · N269SK · Emb EMB145LR · Fuselage Main, FrameSDR CHQA20130717278Battery Pack · inoperativeDURING INSPECTION, EMEREGENCY EXIT LIGHTS FOUND TO BE INOPERATIVE. MX REPLACED THE NR 3 BATTERY PACK. OPS CHECKED GOOD.Jul 17, 2013 · N578RP · Emb EMB145LR · Emergency LightingSDR ASOA20130717075RFlapper Valve · leakingLIQUID VAPOR WAS REPORTED TO BE TRAILING OFF THROUGH RT WING AFTER TAKEOFF BY FLIGHT ATTENDANT. MX R & R THE RT WING OTBD FLAPPER VALVE WITH LEAK CHECK GOOD. ACFT WAS APPROVED FOR RETURN TO SERVICE.Jul 17, 2013 · N11535 · Emb EMB145LR · Fuel StorageSDR RAIA201307170001Roller · out of adjustMAIN PASSENGER DOOR IS HARD TO OPEN. MX ADJUSTED ROLLERS AND CABLES, OPS CHECK GOOD.Jul 17, 2013 · N832HK · Emb EMB145LR · Passenger/Crew DoorsSDR SIMA20130717002Roller · lack of lubeMAIN PAX DOOR VERY DIFFICULT TO CLOSE AND OPEN. LUBED MAIN DOOR ROLLERS AND OPERATED DOOR NUMEROUS TIMES WITH NO ISSUES IAW MM 52-10-00.Jul 17, 2013 · N657AE · Emb EMB145LR · Passenger/Crew DoorsSDR SIMA20130716009Cradle · brokenF/A FLASHLIGHT CRADLE BROKEN. R & R CRADLE IAW AMM 33-50-16. OPS CHECKED GOOD.Jul 16, 2013 · N655AE · Emb EMB145LR · Emergency EquipmentSDR SIMA20130716008Battery Pack · dischargedNR 3 EMERGENCY BATTERY IS DEAD. R & R EMERGENCY BATTERY IAW AMM 33-50-04.Jul 16, 2013 · N625AE · Emb EMB145LR · Emergency LightingSDR SIMA20130716007Battery Pack · dischargedNR 3 EMERGENCY BATTERY DEAD. R & R BATTERY IAW AMM 33-50-04.Jul 16, 2013 · N625AE · Emb EMB145LR · Emergency LightingSDR SIMA20130716006Battery Pack · dischargedEMERGENCY LIGHTS WILL NOT TURN OFF, BATTERIES DEAD. R & R EMERGENCY BATTERY NR 1 GALLEY AREA IAW AMM 33-50-04.Jul 16, 2013 · N625AE · Emb EMB145LR · Emergency LightingSDR SIMA20130716004Sill · corrodedDURING MBV INSPECTION, FOUND BAGGAGE DOOR SILL IS CORRODED BETWEEN FRAMES 65 & 66. R & R BAGGAGE DOOR SILL IAW SRM 51-40-02.Jul 16, 2013 · N685AE · Emb EMB145LR · Fuselage Miscellaneous StructureSDR SIMA20130716005Frame · damagedFRAME 27 HAS AN ELONGATED HOLE AT S15R FLOOR SUPPORT. REPAIRED FRAME 27 AT S15R IAW SRM 53-00-04.Jul 16, 2013 · N685AE · Emb EMB145LR · Fuselage Main, FrameSDR SIMA20130715016Battery Pack · inoperativeEMERGENCY LIGHTS INOPERATIVE. R & R BATTERY AND CHARGER NR 3 IAW AMM 33-50-04. OPS CHECKED GOOD.Jul 15, 2013 · N616AE · Emb EMB145LR · Emergency LightingSDR SIMA20130715015Wire · damagedEMERGENCY PROXIMITY FLOOR LIGHT WIRE NICKED AT FR 24 - 25 LT SIDE. REPAIRED WIRES IAW SWPM 20-21-00 SECTION 4A THRU B (2)D.Jul 15, 2013 · N616AE · Emb EMB145LR · Light System WiringSDR SIMA20130715014Connector · brokenEMERGENCY LIGHT CONNECTOR AT FLOOR PLANEL 251DF BROKEN OFF. INSTALLED CONNECTOR IAW SWPM 20-21-00, STEP 5.Jul 15, 2013 · N616AE · Emb EMB145LR · Light System WiringSDR CHQA20130715273Bleed Valve · inoperativeCREW REPORTED A BLEED 2 SYSTEM FAIL MESSAGE IN FLIGHT, DIVERTED TO AN ALTERNATE FIELD, AND LANDED WITHOUT INCIDENT. MX REPLACED THE PRESSURE REDUCING SHUTOFF VALVE, OPS CHECKED GOOD.Jul 15, 2013 · N278SK · Emb EMB145LR · Compressor Bleed ValveSDR ASOA20130715121HLight · inoperativeDURING PREFLIGHT INSPECTION, THE CREW REPORTED THAT THE LT AFT OVERWING EMERGENCY EXIT LIGHT WAS INOPERATIVE. MX R & R THE AFFECTED LIGHT ASSY, OPS TESTED WITH NO DEFECTS, AND THE ACFT WAS APPROVED FOR RETURN TO SERVICE.Jul 15, 2013 · N13566 · Emb EMB145LR · Emergency LightingSDR SIMA20130715012Lug · gougedDURING MBV INSPECTION FOUND RT AILERON PCA ATTACHMENT OTBD LUG IS GOUGED. R & R RT AILERON PCA FITTING IAW AMERICAN EAGLE EO EM-27MR-112.Jul 15, 2013 · N685AE · Emb EMB145LR · Wing, Attach FittingsSDR SIMA20130715013Frame · damagedFRAME 26 HAS AN ELONGATED HOLE AT S15R, REPAIRED FRAME 26 AT S15R IAW SRM 53-00-04.Jul 15, 2013 · N685AE · Emb EMB145LR · Fuselage Main, Frame
Back to Embraer EMB-145LR