NPRM FAA-2010-1199

Became AD 2011-20-07

Proposed airworthiness directive · Bombardier

Published
December 20, 2010 · 75 FR 79317
Comments due
February 3, 2011
Action
Notice of proposed rulemaking (NPRM)
Docket
FAA-2010-1199
Project
2010-NM-225-AD
FR document
2010-31828
Products
Aircraft

A proposal is not in force. If adopted, it becomes an AD, usually with changes. Only the Federal Register edition is official.

Summary

We propose to supersede an existing airworthiness directive (AD) that applies to the products listed above. The existing AD currently requires replacement of the power control relays in the P91 and P92 power distribution panels for the fuel boost and override pumps with new, improved relays having a ground fault interrupter (GFI) feature, or installation and maintenance of universal fault interrupters (UFIs) using a certain supplemental type certificate. Since we issued that AD, we have determined that we need to clarify which relays may be replaced by installation of UFIs. This proposed AD would continue to require the actions of the existing AD and also specify which relays may be replaced by GFIs or UFIs. We are proposing this AD to prevent pump housing burn-through due to electrical arcing, which could create a potential ignition source inside a fuel tank. This condition, in combination with flammable fuel vapors, could result in a fuel tank explosion and consequent loss of the airplane.

The resulting AD

Notices in this docket · 1