NPRM FAA-2012-0106

Became AD 2012-12-13

Proposed airworthiness directive · BAE Systems

Published
February 8, 2012 · 77 FR 6520
Comments due
March 26, 2012
Action
Notice of proposed rulemaking (NPRM)
Docket
FAA-2012-0106
Project
2011-NM-150-AD
FR document
2012-2908
Products
Aircraft

A proposal is not in force. If adopted, it becomes an AD, usually with changes. Only the Federal Register edition is official.

Summary

We propose to adopt a new airworthiness directive (AD) for all BAE SYSTEMS (OPERATIONS) LIMITED Model BAe 146 and Avro 146-RJ airplanes. This proposed AD was prompted by reports of baggage bay fire bottles that can be misassembled such that two squib electrical connectors can be cross-connected. This proposed AD would require a general visual inspection of certain baggage bay fire bottles for correct connection and for the length of the wiring loom, modifying the wiring loom to certain squib connectors, and corrective actions if necessary. We are proposing this AD to detect and correct excessive wiring loom length and improper connection of the squib connecters, which in conjunction with a fire in one of the baggage bays, could result in the fire extinguishing agent being discharged into a wrong compartment and consequent damage to the airplane.

The resulting AD

Notices in this docket · 1