NPRM FAA-2013-0326

Became AD 2014-05-13

Proposed airworthiness directive · Boeing

Published
April 15, 2013 · 78 FR 22215
Comments due
May 30, 2013
Action
Notice of proposed rulemaking (NPRM)
Docket
FAA-2013-0326
Project
2012-NM-089-AD
FR document
2013-08768
Products
Aircraft

A proposal is not in force. If adopted, it becomes an AD, usually with changes. Only the Federal Register edition is official.

Summary

We propose to supersede an existing airworthiness directive (AD) that applies to certain The Boeing Company Model 757 series airplanes equipped with Rolls-Royce RB211 engines. The existing AD currently requires modification of the nacelle strut and wing structure; for certain airplanes, repetitive detailed inspections of certain aft bulkhead fasteners for loose or missing fasteners, and corrective action if necessary. For certain other airplanes, the existing AD requires a one-time detailed inspection of the middle gusset of the inboard side load fitting for proper alignment, and realignment if necessary; a one-time eddy current inspection of certain fastener holes for cracking, and repair if necessary; a detailed inspection of certain fasteners for loose or missing fasteners; and replacement with new fasteners if necessary. Since we issued that AD, a compliance time error was discovered, which could allow an airplane to exceed the acceptable compliance time for addressing theunsafe condition. This proposed AD would specify a maximum compliance time limit. We are proposing this AD to prevent fatigue cracking in primary strut structure and consequent reduced structural integrity of the strut.

The resulting AD

Notices in this docket · 1