NPRM FAA-2014-0232

Became AD 2014-22-05

Proposed airworthiness directive · Boeing

Published
April 17, 2014 · 79 FR 21655
Comments due
June 2, 2014
Action
Notice of proposed rulemaking (NPRM)
Docket
FAA-2014-0232
Project
2013-NM-100-AD
FR document
2014-08730
Products
Aircraft

A proposal is not in force. If adopted, it becomes an AD, usually with changes. Only the Federal Register edition is official.

Summary

We propose to adopt a new airworthiness directive (AD) for certain the Boeing Company Model DC-9-10, DC-9-20, DC-9-30, DC-9-40, and DC-9-50 series airplanes. This proposed AD was prompted by an evaluation by the design approval holder (DAH) indicating that the bulkhead dome tees, which connect the bulkhead web to the fuselage, are subject to widespread fatigue damage (WFD). This proposed AD would require repetitive inspections of the improved ventral aft pressure bulkhead tees and replacement if necessary. We are proposing this AD to detect and correct fatigue cracking of the bulkhead dome tees, which could result in reduced structural integrity and rapid decompression of the airplane.

The resulting AD

Notices in this docket · 1