NPRM FAA-2025-5024

Became AD 2026-10-12

Proposed airworthiness directive · Airbus Canada Limited Partnership

Published
November 19, 2025 · 90 FR 52005
Comments due
January 5, 2026
Action
Notice of proposed rulemaking (NPRM)
Docket
FAA-2025-5024
Project
MCAI-2025-00797-T
FR document
2025-20323
Products
Aircraft

A proposal is not in force. If adopted, it becomes an AD, usually with changes. Only the Federal Register edition is official.

Summary

The FAA proposes to supersede Airworthiness Directive (AD) 2024-04-06, which applies to certain Airbus Canada Limited Partnership Model BD-500-1A10 and BD-500-1A11 airplanes. AD 2024-04-06 requires repetitive operational checks of the gravity cross flow shut-off valve and, for certain airplanes, a one-time inspection of the motive flow fuel-feed tubes at the clamp blocks location, and applicable corrective action. Since the FAA issued AD 2024-04-06, the manufacturer developed additional corrective actions. This proposed AD would continue to require the actions in AD 2024-04-06 and would require replacement of the saddle clamp, inspection of the motive flow fuel-feed tubes, and applicable corrective actions. The FAA is proposing this AD to address the unsafe condition on these products.

The resulting AD

Notices in this docket · 1