Service difficulty report · Clamp · Boeing 727100

Difficulty date
May 14, 2002
Submitted
May 15, 2002
Operation
Air carrier
Aircraft
N191FE
Make and model
Boeing 727100
Aircraft serial
19084
Aircraft time
67,037 hours, 49,305 cycles
Part
Clamp
Condition
Leaking
Location
Pneumatic Sys
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING INITIAL CLIMB, ENG NR 1 STRUT OVERHEAT LIGHT ILLUMINATED, WING ANTI ICE VERIFIED CLOSED, NR 1 ENG BLEED AIR SWITCH CLOSED AND NR 1 ENG THRUST LEVER TO IDLE IAW RED TABS, STRUT OVERHEAT LIGHT EXTINGUISHED AFTER 3 MINS AND OVERHEAT SYSTEM TESTED SATISFACTORY. FOUND NR 1 ENG DUCT BETWEEN SHUTOFF VALVE AND BLEED AIR HEAT EXCHANGER LEAKING. REPLACED CLAMP AND PERFORMED DUCT LEAKAGE TEST PER M/M REF 36-00-000-5. LEAK CKS OK. RAN ENGINES, OPS CK'D NR 1 BLEED SYSTEM IAW JRH 7-4, CK'D GOOD PER JRH. OK FOR SERVICE.

More about the Boeing 727-100