What was found
FORWARD CARGO RIGHT TUNNEL BETWEEN STA 6-30 TO STA 6-50 AROUND NR 41 LONGERON, INTERCOSTAL FOUND CRACKED. REMOVED CRACKED INTERCOASTAL AS PER SRM 51-31-01, VOL.II AND FABRICATED NEW INTERCOASTAL AS PER DRAWING ACA7049. INSTALLED NEW INTERCOASTAL AT FORWARD CARGO R/H TUNNEL BETWEEN STA 6-30 TO STA 6-50 AROUND NO. 41 LONGERON AS PER SRM 51-31-01, VOL.II.