What was found
CREW REPORT STATES RECEIVED CAUTION MSG HYD PUMP 3B INOP. OHM WIRING FOR THE 3B HYD PUMP TO CIRCUIT BREAKER A2 ON CB PNL 1. NO DEFECTS ARE NOTED IN WIRING REPLACE 3B HYD PUMP. THIS WO IS STILL IN APPR STAGE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CREW REPORT STATES RECEIVED CAUTION MSG HYD PUMP 3B INOP. OHM WIRING FOR THE 3B HYD PUMP TO CIRCUIT BREAKER A2 ON CB PNL 1. NO DEFECTS ARE NOTED IN WIRING REPLACE 3B HYD PUMP. THIS WO IS STILL IN APPR STAGE.