Service difficulty report · Torque Ring · Doug MD11

Difficulty date
June 24, 2005
Submitted
June 27, 2005
Operation
Air carrier
Aircraft
N619FE
Make and model
Doug MD11
Aircraft serial
48770
Aircraft time
31,221 hours, 7,092 cycles
Part
Torque Ring
Condition
Cracked
Location
Thrust Reverser
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

NR 1 ENGINE, RT THRUST REVERSER FORWARD FRAME, UPPER TORQUE RING CRACKED APPROXIMATELY 1.5 IN LENGTH. THRUST REVERSER REMOVED AND INSTALLED NEW REVERSER AS PER WORK CARD 78T3001-R AND WORK CARD 78T3901-R, GE NR 1 RIGHT REVERSER DOOR - INSTALL. REVERSER ADJUSTMENT AND OPERATION CHECK CARRIED OUT AS PER WORK CARD 78T3901-R, GE NR 1 RT REVERSER DOOR - INSTALL.

More about the Doug MD-11