What was found
ON ROTATE STICK SHAKER ACTIVATED 140KTS A/C FULL BUFFET TO 3000 FT 180 KTS. DID NOT CHANGE T/O CONFIG. A/C STALL AT 15DGS AOB 210 KTS 15DGS FLAP. FLAPS 50, A/C BUFFETED AT 160KTS IN A FULL STALL LANDING, 20KTS FASTER THAN BUG. CKD FOR FULL EXT OF FLAPS /SLATS. INSP ALL FLT CONT SURFACES WERE CONFIG CORRECTLY. CKD SPOILERS FULL UP AND DOWN. NO DEFECTS. PERF STALL ADJ/TST AND AT/SC ADJ/TST IAW DC-10MM'S 22-33-00-2, AND 22-30-00 REF WRI 34-18/7405 FOR WORK ACCOMP, C/W ELEV LOAD FEEL AND MECH TESTS REF DC-10 MM 27-30-00-5. CKD FLAP AND AOA VANE FOR PROPER OP. REMOVED AND REPLACED AT/SC NR 2. REMOVED AND REPLACED NR 2 LAU PER M/M22-11-01-2. PURGED AND LEAK CKD CAPT'S AND F/O'S PITOT SYSTEMS.