What was found
FOUND REPAIR AT STA 950A, STR 29R WAS DETERMINED HAD BEEN ACCOMPLISHED IAW SRM 53-30-3 FIG 3 BASED ON EXTERNAL VISUAL EVALUATION WITH REPAIR INSTALLED, CONSISTED LOCATION, SHAPE, SIZE, FASTENER SPACING, NUMBERS, MATERIAL THICKNESS AND TYPE AND GENERAL WORKMANSHIP OF INSTALLATION, REPAIR CLASSISIFED AS MAJOR REPAIR PER GMM 6-2-100.