What was found
FOUND PREVIOUSLY INSTALLED REPAIR AT STA 680, STR 28 WAS ACCOMPLISHED IAW SRM 51-40-3, FIG 1 PAGE 1, BASED ON AN EXTERNAL VISUAL EVALUATION, CONSISTED OF LOCATION, SHAPE, SIZE, FASTENER SPACING AND NUMBERS, MATERIAL THICKNESS AND TYPE, GENERAL WORKMANSHIP, REPAIR IS CLASSIFIED AS MAJOR PER FEDEX GMM 6-2-100.