What was found
FOUND PREVIOUSLY REPAIR INSTALLED AT NR 1 KRUGER FLAP WAS ACCOMPLISHED IAW SRM 57-50-3 FIG 11, BASED ON AN EXTERNAL VISUAL EVALUATION CONSISTS OF LOCATION, SIZE, SHAPE, MATERIAL THICKNESS AND TYPE, FASTENERS NUMBER AND SPACING, GENERAL WORKMANSHIP, REPAIR IS CLASSIFIED AS MAJOR.