What was found
FOUND PREVIOUSLY INSTALLED REPAIR AT AFT INBD CORNER OF PNEUMATIC GROUND CONNECTION CUTOUT WAS DETERMINED TO BE IAW SR 27-53-024, BASED ON AN EXTERNAL VISUAL EVALUATION WITH REPAIR INSTALLED, EVALUATION CONSISTED OF LOCATION, SHAPE, SIZE, FASTENER SPACING AND NUMBER, MATERIAL THICKNESS, TYPE, GENERAL WORKMANSHIP OF PREVIOUS INSTALLATION, REPAIR IS CLASSIFIED AS A MAJOR BASED ON FEDEX GMM 6-2-100.