What was found
FOUND PREVIOUS REPAIR INSTALLED ON LT INBOARD FOREFLAP LEADING EDGE WAS DETERMINED TO BE ACCOMPLISHED IAW SRM 57-50-4 FIG 1. BASED ON AN EXTERNAL VISUAL EVALUATION, CONSISTS OF LOCATION, SHAPE AND SIZE, MATERIAL TYPE AND THICKNESS, FASTENER SPACING AND NUMBER, GENERAL WORKMANSHIP, REPAIR IS CLASSIFED AS MAJOR PER FEDEX GMM 6-2-100.