What was found
FOUND PREVIOUS REPAIR INSTALLED ON NR 8 LEADING EDGE SLAT UPPER SURFACE WAS DETERMINED TO BE ACCOMPLISHED IAW SRM 57-50-3 FIG 10. BASED ON AN EXTERNAL VISUAL EVALUATION, CONSISTS OF LOCATION, SHAPE, SIZE, MATERIAL THICKNESS AND TYPE, FASTENER SPACING AND NUMBERS, GENERAL WORKMANSHIP, REPAIR IS CLASSIFIED AS MAJOR PER FEDEX GMM 6-2-100.