What was found
ON CLIMB-OUT AT APPROX 8,000 FT RECEIVED ENGINE 2 A/ICE DUCT ALERT. COMPLIED W/CHECKLIST LIGHT WENT OUT AT IDLE. RTB FOR UNEVENTFUL LANDING. PERFORMED FIM 30-22-05, NO LEAK DETECTED ON ENG NR 2 ANTI-ICE DUCT. ENG NR 2 COWL ANTI-ICE SHUTOFF VLV, FOUND DEFERRED OPEN. REMOVED AND REPLACED ENG NR 2 INLET COWL ANTI-ICE SHUTOFF VALVE AS PER MD11 MM 30-22-01-41. PERFORMED INSPECTION OF PICCOLO TUBES FOUND NIL ABNORMALITIES. PERFORMED ENG RUN-UP AS PER JRH FOR APU AND ENG NR 2 PNEUMATIC SYS DECAY CHECK, DONE. PASSED. ALSO, PERFORMED HIGH POWER ENG RUN-UP AS PER JRH. OPS CHECKED, NORMAL.