What was found
ON TAKEOFF ROLL, WHEN TOGO WAS SELECTED ON THE THROTTLES, NR 1 ENG WENT TO FLEX PWR, ENG NR 2 HOWEVER WENT TO ABOUT 109 PERCENT OR SO N1 THE ENGINE THRUST PREDICT NEEDLE ON NR 2 DIDN'T MOVE. ALSO, GOT THE ENGINE TRIM FAULT LIGHT. ABORTED TAKEOFF, RNO - MEL/CDL: 22-30-01-02 MEM/23. NOTE: FCC NR 2 CHANGED 08-23-06, SEE MTSI 22-10/1565. REMOVED AND REPLACED NR 2 ENG TORQUE MOTOR FAIL FIXED SOLENOID PASSES OPERATIONAL TEST IN REF OFF MFG 1310-130 POS 2 SRL 275 ON MFG 1310-130 SRL WWC00966. PERFORMED POWER MANAGEMENT CONTROL SYSTEM OPS CHECK. PERFORMED MAX PWR CHECK OF NR 1 AND NR 2 ENGINES.