Service difficulty report · Stiffener · Airbus A300B4622R

Difficulty date
September 5, 2007
Submitted
September 5, 2007
Operation
Air carrier
Aircraft
N727FD
Make and model
Airbus A300B4622R
Aircraft serial
579
Aircraft time
36,957 hours, 19,403 cycles
Part
Stiffener
Condition
Corroded
Location
Zone 100
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FOUND CORROSION ON T-SECTION BETWEEN STRG 50-55 LT AT FRAME 39. ON PRESSURE BULKHEAD, SMALL CRACKS HAVE BEEN FOUND. THE REPAIR CONSISTS IN CUTTING OUT THE TEE AND INSTALLING A NEW TEE WITH AN ANGLE AND A STRAP. A SPECIFIC REPAIR HAS BEEN INSTALLED FOLLOWING PRINCIPLES AS PER SRM 53-15-17/FIG 201.

More about the Airbus A300 B4-622R