What was found
MAIN CARGO DECK FLOOR, U CHANNEL, BETWEEN STA 310 TO 324, LBL 21, WL 208, HAS CORROSION. REMOVED CORROSION FROM U CHANNEL IAW SRM 51-10-02, L= 2.3 FT, W= 2.0 INCHES, D= .015 INCHES, ORIGINAL MATERIAL THICKNESS .054", FOUND TO BE OUT OF SRM 53-00-51, FIG 101, DETAIL III LIMITS. REMOVED U CHANNEL IAW SRM 51-40-02. FABRICATED NEW REPAIR CHANNEL ON MAE TRAVELER NR T7/713522, FROM 7075-0 0.050C, HEAT TREATED TO T6. LOCATED AND DRILLED REPAIR CHANNEL IAW SRM 51-40-05. TREATED AND PRIMED REPAIR CHANNEL IAW SRM 51-20-01. INSTALLED REPAIR CHANNEL IAW SRM 51-40-02. THIS IS A CATEGORY "A", MAJOR REPAIR.