What was found
WHEN SELECTED FLAPS 15 ON APPROACH SFPI SHOWED FLAPS LIGHT AND FLAPS WOULD NOT EXTEND, RE-CYCLED FLAPS AND ON SECOND ATTEMPT FLAPS EXTENDS NORMALLY. PERFORMED WIRING CHECK HIGH SPEED SOL V/V, ENABLE V/V AND RETRACT SOL V/V ALL RESISTANCE VALUE WITHIN LIMIT. CHECKED BOTH TORQUE LIMIT ARE NO FAULTS NOTED, ALL SCREW JACK TORQUE LIMITER NO JAM NOTED. RAN NR 2 ENG AGAIN AND FLAP/SLAT SYS OPS CHECKED ALL IND SYS WORKS OK. CARRIED OUT BITE CHK OF SFCC NR1/NR 2, NO FAULT NOTED PER AMM 27-50-00-0/5, JRH CHAP 5.