What was found
AFT PIT, BILGE BODY FRAME, HAS A DRILL START ON UPPER FLANGE AND CORRODED WEB BS 1143, FWD AND AFT SIDE, STR 26R - 27R, WL 153 - 156 LEVEL 1 CORROSION BLENDED AREA, FLAP PEENED AREA, APPLIED ALODINE AND PRIMER TO AREA APPLIED CORROSION INHIBITOR TO AREA, REF EA 7-5310-118267. ORIGINAL T .080 INCH REMOVED .055 INCH, .025 INCH REMAINING.