What was found
AFT MAIN DECK FLOOR DITCHING PAN ASSY IS CRACKED WITH INTERIM COMPOSITE REPAIR BS 1176-1183, RBL 37-47 WL 208 (MKD). FABRICATED NEW DITCHING PAN, HEAT TREATED, ALODINED AND PRIMED, INSTALLED IAW SRM 51-10-2, PG 1, 51-30-2, PG 1, 51-30-5 PG 1. BOEING DWD: 65-29548. HEAT TREATED, TRACKING NR: 2008-05-068. THIS IS CLASSIFIED AS A MINOR REPAIR. REF: GMM 6-2-100 PG 2 AND 3.