What was found
AFT PIT BILGE BODY FRAME UPPER FLG IS BUCKLED, BS 1070, STR 25R - 27R DAMAGE ON FRAME FLANGE FOUND TO BE OUT OF LIMITS PER SRM 53-10-1 PG 1-3 DETAIL 4 NOTE 5. REMOVED DAMAGE, NDT VERIFIED DAMAGE REMOVAL. VERIFIED MATERIAL FOR REPAIR DOUBLER, 7075 - O - .063" .A 03916 / PO 1035912. FABRICATED REPAIR DOUBLER ITEM 14. REPAIR DOUBLER FABRICATED IN ITEM NR 6 NOT USED. HEAT TREATED TO T-6. TREATED AND PRIMED AND INSTALLED REPAIR DOUBLER, REF SRM 53-10-1 PG 1-3, DETAIL 4, SRM 51-40-3 FIG 1 SRM 51-30-2 FIG 7 BOEING DWG 65-16344. THIS IS CLASSIFIED AS A MAJOR REPAIR.