What was found
TOTAL LOSS OF GREEN HYD SYSTEM ON SHORT FINAL GEAR DOWN FLAPS 40 DEGREES DECLARED EMERGENCY LANDED USED DIFF BRAKING STOPPED ON CENTERLINE MAINTENANCE PINNED AND TOWED TO GATE. TURNED PUMPS OFF WHEN DIRECTED BY ECAM BEFORE LANDING. FOUND LT FLEX LINE AT TOP OF NOSE GEAR STRUT GOING TO ACTUATOR DAMAGED AT FITTING AND CAUSING LEAK. DAMAGED LINE REMOVED AND SYSTEM ISOLATED. REINSTALLED BOTH NLG ACTUATOR FLEX HOSES. CYCLED LANDING GEAR PER AMM 32-31-00-5, 3 TIMES, OPS AND LEAK CHECK OK.