What was found
FUSELAGE UPPER LOBE INTERIOR STRUCTURE CORROSION STA 310 LBL 3, ON FLOORBEAM. REMOVED CORROSION, FOUND TO BE OUT OF LIMITS, FABRICATED REPAIR ANGLE, HFEC BLEND OUT AREA AND TO ALL FASTENER HOLES IN FLOOR BEAM. INSTALLED REPAIR. REF EA 7-5310-123807 STEP 1 THRU 13. THIS IS CLASSIFIED AS A MAJOR REPAIR.