What was found
WHILE GROUND PRESSURIZING CABIN FOR LEAK CHECK, THE CABIN DOOR WOULD LEAK AT 3 PSI AND APPEARED TO SHIFT WITHIN THE FRAME AS PRESSURE WAS APPLIED.ADJUSTMENTS TO THE LATCHING MECHANISM ALLOWED THE DOOR TO HOLD TILL 5.2 PSI (6 PSI WAS THE TEST TARGET) BUT IT WAS NOTED THAT THE DOOR WAS STILL SHIFTING AFT AT THE UPPER PORTION UNDER PRESSURE.THE DOOR HINGE AFT SECTION HAD EXCESSIVE PLAY. THE DOOR WAS REMOVED AND A CLOSER INSPECTION REVEALED THAT THE DOOR END CHANNEL WAS CRACKED FOR 6 INCHES SPANNING THE AFT 6 RIVETS WHICH ATTACH THE DOOR HINGE TO THE DOOR. REPLACED THE CHANNEL AND HINGE HALF PIECES AND ADJUSTED DOOR LATCHING MECHANISM AS REQUIRED.