What was found
DISASSEMBLY INSPECTION REVEALED DETAIL VANE OF 10TH/11TH SHROUD BROKEN OUT CAUSING SECONDARY HPC BLADE/VANE DAMAGE. SHROUD WILL BE FORWARDED TO PRATT & WHITNEY ENGINEERING FOR FAILURE INVESTIGATION. (X
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DISASSEMBLY INSPECTION REVEALED DETAIL VANE OF 10TH/11TH SHROUD BROKEN OUT CAUSING SECONDARY HPC BLADE/VANE DAMAGE. SHROUD WILL BE FORWARDED TO PRATT & WHITNEY ENGINEERING FOR FAILURE INVESTIGATION. (X