What was found
TIE BOLT FAILURE, 3 EACH. UNDETERMINED WHEEL SENT TO MFG FOR ANALYSIS. BOLT HARD TIME IMPLEMENTED, AND TIE NUT CYCLE PLAN INPLEMENTED. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
TIE BOLT FAILURE, 3 EACH. UNDETERMINED WHEEL SENT TO MFG FOR ANALYSIS. BOLT HARD TIME IMPLEMENTED, AND TIE NUT CYCLE PLAN INPLEMENTED. (X)