Service difficulty report · Stator · Emb EMB120

Difficulty date
June 24, 2000
Submitted
July 10, 2000
Operation
Air carrier
Make and model
Emb EMB120
Part
Stator
Part number
RFS2010
Condition
Warped
Location
Brake Assy
Part time
1,361 hours
Stage of operation
NR
How discovered
O
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

BRAKE ASSY, P/N 2-1585-R, FAILED PREMATURELY. NR 1 STATOR EXCESSIVELY WARPED AND MULTIPLE LINE CRCKS AT RELIEF HOLES. NR 2 STATOR BROKEN THROUGH ON ONE SIDE AND HAS MULTIPLE LINE CRACKS AT RELIEF HOLES, BINDING IN TORQUE TUBE KEY SLOTS. HEAT STACK WARPED AND UNEVEN WEAR. SUBMITTER STATED THIS IS A CONTINUAL DISCREPANCY. (X)

More about the Emb EMB-120