What was found
D-CHECK, FQI SYSTEM WIRING CHAFING AND ARCING INSIDE FUEL TANK NR 3, PROBE NR 6. HARNESS FOUND CHAFING ON MOUNT BRACKET OF THE FILL PILOT VALVE IN BAY R07 (XORS: -298-500). WIRES 3E900E22GR X 3E901E22WH DAMAGED THROUGH OUTER SLEEVE INSULATION CAUSING ARCING ON BRACKET. HARNESS WAS EXCESSIVELY SLACK. HARNESS ANPO138-502 REPLACED IAW WDM28-41-08 FROM PROBE 6 (T2-104) TO JUNC PROBE 2 (T2-102). PERFORMED STATIC BOND TESTS ON ALL BOOST PUMPS, DC START PUMPS, FEED SYS DUCTS, RE-FUEL DUCTS, VENT SYS. OVER 100 READINGS GREATER THAN 100 MILLIOHMS ACROSS ALL 3 MAIN TANKS AND AUXILIARY TANKS. THE NECESSARY ACTION WAS TAKEN (RE-BONDING). (X)