What was found
DURING A PHASE INSPECTION, FOUND THE CRACK IN THE RIGHT CANTED RIB HAD PROGRESSED BEYOND THE PREVIOUSLY INSTALLED STOP DRILLS. AIRCRAFT WAS RETURNED TO THE OPERATOR WITH A ''FERRY PERMIT'' FOR REPAIR. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING A PHASE INSPECTION, FOUND THE CRACK IN THE RIGHT CANTED RIB HAD PROGRESSED BEYOND THE PREVIOUSLY INSTALLED STOP DRILLS. AIRCRAFT WAS RETURNED TO THE OPERATOR WITH A ''FERRY PERMIT'' FOR REPAIR. (X)