What was found
DURING PHASE 3 INSPECTION, REMOVED RT AFT TRIM PANEL AND FOUND 1 ATTACH SCREW WAS DRILLED THROUGH DOORPOST STRUCTURAL RIVET. REPLACED RIVET AND RELOCATED PANEL ATTACH SCREW WITH NEW TRIM PANEL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING PHASE 3 INSPECTION, REMOVED RT AFT TRIM PANEL AND FOUND 1 ATTACH SCREW WAS DRILLED THROUGH DOORPOST STRUCTURAL RIVET. REPLACED RIVET AND RELOCATED PANEL ATTACH SCREW WITH NEW TRIM PANEL.