What was found
RT ENGINE, LT MAGNETO POINT CAM FOLLOWER ARM BROKE AFTER 124.9 HOURS USE. MAGNETO OVERHAULED. INSTALLED 6-2-99 AT 2180.1 HOURS. FAILED AND REMOVED AT 2305.0 HOURS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RT ENGINE, LT MAGNETO POINT CAM FOLLOWER ARM BROKE AFTER 124.9 HOURS USE. MAGNETO OVERHAULED. INSTALLED 6-2-99 AT 2180.1 HOURS. FAILED AND REMOVED AT 2305.0 HOURS.