Service difficulty report · Line · Mooney M20J

Difficulty date
December 4, 2001
Submitted
December 4, 2001
Operation
General aviation
Make and model
Mooney M20J
Part
Line
Condition
Leaking
Location
Fuel System
Stage of operation
IN
How discovered
V
Nature of condition
K
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

MOONEY 201 M20J: OWNER REPORTED LOW FUEL PRESSURE. FOUND AEROQUIP LINE LEAKING THROUGH BODY OF INNER TUBE STOCK. THIS LINE HAS A STAINLESS STEEL BRAID COVERING FULL LENGTH. HOSE HAD A CURE DATE 3RD QUARTER 1995 WITH MANUFACTURED DATE JAN 1998. HOSE IS CONNECTED TO FUEL INJECTOR AND FUEL PRESSURE SENDER. HOSE WAS LEAKING SUBSTANCIAL AMOUNTS OF FUEL ABOVE EXHAUST SYSTEM AND ENGINE OPERATION WAS NOT AFFECTED.

More about the Mooney M20J